|
Biennial Maintenance contract for Repair & maintenance of coal transportation road of PBCMP
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Construction of Security Infra Works for PBCMP
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Widening & strengthening of existing approach road from Administrative bldg. DLCMP to Mine entry 2.0KM along with construction/ modification of box culverts retaining wall and 02 nos. Sign board at DLCMP
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Mining Operation for Overburden Removal Coal Extraction Including Other Associated Works Crushing / Sizing of Coal into -100mm Transportation of Coal upto Surface Coal Stock Yard / NTPC’s CHP for a Period of 10 Years from the East Pit of Talaipalli Coal Mining Project Gharghoda Raigarh Distt. State Of Chhattisgarh through Limited Outsourcing Mode.
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Construction of RCC Area Paving at North Side of Banadag Railway Siding of PBCMP
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Construction of RCC Area Paving at Entry Gate to Level Crossing and 100 t WB at South Side of Railway Siding of PBCMP.
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Construction & Erection of 50 Nos. 20 Nos. for PBCMP 15 Nos. for PBNW & 15 Nos. for BADAM CMP Solar Water Pump System with Stagging for CMP Hazaribagh
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Civil Works Like Grade Slab, Fencing, IPS Flooring, Drain, Door Window, Roof Treatmt etc. for Extended CHP PBCMP at Risk & Cost of TSL
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Construction of 01 Nos. of Stores at Sikri Township
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Construction of balance service road work from TP-1 to TP-5 & associated works for Main CHP for PBCMP
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Fencing Work Kitchen Work and Upliftment of the Dwelling Units at R&R Colony PBCMP.
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Loading Transportation Unloading and Wagon loading of coal from surface coal yard of Pakri Barwadih Coal Mining Project PBCMP to Banadag Railway Siding Hazaribag including Maintenance of Banadag Siding & Associated Miscellaneous Works for an Interim Period of One Year
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Transportation of 6,00,000 Tons of Coal from Talaipalli Coal Mine to Gharghoda Railway Siding / Goods Shed
|
Talaipalli Coal Mining Project |
Coal Mining Region |
31/12/2024
|
|
Supply, supervision of installation and commissioning of Dehumidifiers for Preservation of HRSG at NTPC, Kayamkulam
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
“MAINTENANCE OF PMGSY ROADS IN COAL BLOCK AND CONSTRUCTION OF APPROACH ROAD TO PORTABLE MAGAZINE IN TALAIPALLI COAL MINING PROJECT
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Removal of overburden, coal extraction (including associated activities), transportation of coal upto surface coal stock yard and crushing/sizing of coal in to -100mm for a period of 3 years in Kerandari Coal Mining Project
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Loading, Transportation, Unloading and Wagon loading of coal from surface coal yard of Pakri Barwadih Coal Mining Project (PBCMP) to Banadag Railway Siding Hazaribag including Maintenance of Banadag Siding & Associated Miscellaneous Works for an Interim Period of One Year
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|
|
Construction of Admin Office Building Peripheral Trunk Drain for TLCMP
|
Coal Mining HQ-Ranchi |
Coal Mining Region |
31/12/2024
|