NRE-CS-5929-003(WTG)-9R
|
|
SUPPLY AND INSTALLATION OF WIND TURBINE GENERATORS (WTG) FOR ISTS CONNECTED WIND ENERGY PROJECT WITH NOMINAL CAPACITY OF 813 MW (271 WTG) IN BELLARY, KARNATAKA |
Renewable Energy |
18/04/2026
|
|
|
GEM/2026/B/7338183
|
|
Deployment of Various Machinery for Maintenance
of Ash dyke including Monsoon Period at Dhanras
Ash Dyke, NTPC Korba for 12 Months (2026-27) |
Western Region Head Quarter-II |
23/04/2026
|
|
|
NTPC/USSC-CPG1/9900322980
|
|
Supply and Application of Airseal Ceramic Fibre Sealing in Penthouse & APH Area at NTPC Rihand |
Western Region Head Quarter-II |
27/04/2026
|
|
|
GEM/2026/B/7416785
|
|
O&M of 20 TPD CO2 Capture Plant at Vindhyachal for 2 Months |
Corporate Contracts |
17/04/2026
|
|
|
GEM/2026/B/7419665
|
|
DISMANTLING/FABRICATION/ERECTIO
NS OF CORRODED STRUCTURES OF
CABLE TRAY, SUPPORT STRUCTURES
& PLATFORM IN DESALINATION AREA
AT NTECL. |
NTECL: NTPC TamilNadu Energy Company Ltd. |
28/04/2026
|
|
|
16MEG-27-07042026
|
|
CPVC Pipes, CPVC Fittings and CPVC Solvent Cement |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
16MEG-25-07042026
|
|
Cast Iron Pipe Lines for Ash Conveying Pipes of Sizes up to 250 NB |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
16MEG-10-07042026
|
|
Cast Basalt Pipe |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
10MEG-42-07042026
|
|
Sodium Hypochlorite Solution |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
10MEG-06-07042026
|
|
SF6 GAS |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
01MEG-06-07042026
|
|
GI GRATING/GRILL |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
18MEG-01A-07042026
|
|
GENERAL PURPOSE MANUALLY OPERATED CI GLOBE VALVES |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
18MEG-01C-07042026
|
|
GENERAL PURPOSE MANUALLY OPERATED CI NRV/CHECK VALVES |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
46MEG-01A-07042026
|
|
Wear Parts (Grinding Rolls and Bull Ring Segment) of Raymond Bowl Type XRP / HP Pulverisers, Grinding Roll size 28/29 inches |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
46MEG-01B-07042026
|
|
Wear Parts (Grinding Rolls and Bull Ring Segment) of Raymond Bowl Type XRP / HP Pulverisers, Grinding Roll size 36/37/43 inches |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
46MEG-01C-07042026
|
|
Wear Parts (Grinding Rolls and Bull Ring Segment) of Raymond Bowl Type XRP/HP Pulverisers, Grinding Roll size 48/50/62/63 inches |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
46MEG-15B-07042026
|
|
NON-METALLIC FABRIC EXPANSION JOINTS |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
48MEG-02-07042026
|
|
BOILER STRAIGHT TUBES (ALLOY STEEL OTHER THAN SS) |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
55MEG-09-07042026
|
|
ASTM 4140 Grade Forged Crusher Hammer |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
56MEG-09-07042026
|
|
KNIFE EDGE GATE VALVE UP TO 350NB |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
68MEG-01-07042026
|
|
Fire Tender (Cat-I) |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
81MEG-05-07042026
|
|
Instrumentation Cables |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
87MEG-10-07042026
|
|
400 kV Current Transformer (CT) (Enlistment Category-1) |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
94MEG-06A-07042026
|
|
Temperature Transmitter |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
94MEG-07-07042026
|
|
Ultrasonic Flow Meters |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
BMD-27-07042026
|
|
In Situ Repairing of HP Valves |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
BMD-28-07042026
|
|
Maintenance/Overhauling of Electro Static Precipitator (ESP) and its Associated Auxiliaries of Thermal Power Plant |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
BMD-32-07042026
|
|
Enlistment of Vendors for Corrosion Mapping of Water Wall Tubes in Boiler by RFET Technique |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
BMD-33-07042026
|
|
SUPPLY AND APPLICATION OF PAINT ON STRUCTURES, EQUIPMENTS & PIPING OF BOILER AND IT’S AUXILIARIES for NTPC Stations |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
BTG-01-07042026
|
|
Long-term Maintenance Contract for Boiler, Turbine and their Auxiliaries |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
CHP-05B-07042026
|
|
Enlistment for Round the Clock Stone Picking from Running Conveyor Belts in CHP (Category-I) |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
CHP-10A-07042026
|
|
Chute Fabrication & Erection Works in CHP |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
EMG-01-07042026
|
|
Environment Parameter Monitoring for Thermal and Gas Plants |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
MGR-01-07042026
|
|
Maintenance of Signalling and Telecommunication System of MGR Area |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
MMC-01-07042026
|
|
Mechanical Shift Maintenance in Main Plant/ Off Sites Areas of Coal based Power Plant |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
TMD-24-07042026
|
|
Vendor Enlistment for Eddy Current Testing of Condenser & Heat Exchanger Tubes in Turbine Area (CATEGORY-I Enlistment) |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
MP-02-03-07042026
|
|
MP-02 and MP-03 (Deployment of Manpower Category-1) |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
MP-102-103-07042026
|
|
MP-102 and MP-103 (Manpower) |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
TMD-01-07042026
|
|
Condenser Tube Cleaning by Bullet Shot Method in Units above 200MW Capacity |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
TMD-03-07042026
|
|
Condenser Tube Cleaning by High Pressure Jet Cleaning Method in Units above 200MW |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
TMD-06-07042026
|
|
OPERATION, MAINTENANCE & HOUSEKEEPING OF CENTRAL WORKSHOP MACHINES |
Vendor Development Cell (Raipur CG) |
28/04/2026
|
|
|
TMD-26-07042026
|
|
Vendor Enlistment for Online Leak Sealing in Turbine, Boiler & Other Areas of Power Plant. (CATEGORY-I Enlistment) |
Vendor Development Cell (Raipur CG) |
06/07/2026
|
|
|
NRE-CS-5816-004(EPC)-9
|
|
EPC PACKAGE FOR DEVELOPMENT OF 900MW (3x300MW) GRID CONNECTED SOLAR PV PROJECTS AT MANDSAUR, MADHYA PRADESH |
Renewable Energy |
17/04/2026
|
|
|
PVUNL/Patratu/9900322675
|
|
Civil and Electrical Works at CLIMS Labor Gate, PVUNL. |
Patratu Vidyut Utpadan Nigam Limited (Subsidiary) |
20/04/2026
|
|
|
GEM/2026/B/7357246
|
|
Supply, Installation, Commissioning and CAMC for OCEMS at CMB Outlet |
NTECL: NTPC TamilNadu Energy Company Ltd. |
10/04/2026
|
|
|
GEM/2026/B/7221654
|
|
Procurement of Industrial Grade, SMPS based Technology, Float Cum Boost Charger 24V DC, Installation & Commissioning Works and Dismantling of Existing Chargers at NTECL Plant |
NTECL: NTPC TamilNadu Energy Company Ltd. |
24/04/2026
|
|
|
GEM/2026/B/7416128
|
|
BIANNUAL MAINTENANCE & OVERHAULING CONTRACT FOR MILLS, FEEDERS, BUNKERS & BURNER AREA of stage-I,II,III for 2026-28 at BMD-NTPC Korba |
Western Region Head Quarter-II |
27/04/2026
|
|
|
NTPC/USSC-CPG1/9900322442
|
|
WBM ROAD OVER INSPECTION PATH/PERIMETER DYKE OF NTPC SIMHADRI ASH DYKE |
Western Region Head Quarter-II |
21/04/2026
|
|
|
GEM/2026/B/7402970
|
|
Procurement of Discharge Rods |
NTECL: NTPC TamilNadu Energy Company Ltd. |
20/04/2026
|
|
|
GEM/2026/B/7407036
|
|
Procurement of Portable Hydrogen Gas Analyser |
NTECL: NTPC TamilNadu Energy Company Ltd. |
22/04/2026
|
|
|
NVVN/C&M/RE-512/2026-27
|
|
TENDER FOR SALE OF GYPSUM PRODUCED FROM FGD PLANT OF NTPC SIPAT |
NVVNL - NTPC Vidyut Vyapar Nigam Ltd. |
17/04/2026
|
|
|
CS-8014-132-9
|
|
INTAKE AND MAKE UP WATER SYSTEM PACKAGE
FOR GADARWARA SUPER THERMAL POWER PROJECT STAGE-II (2X800 MW)
LOCATED AT DISTRICT NARSINGHPUR, STATE OF MADHYAPRADESH, INDIA, |
Corporate Contracts |
05/05/2026
|
|
|
GEM/2026/B/7409035
|
|
Procurement of SF6 Gas for 400KV GIS |
NTECL: NTPC TamilNadu Energy Company Ltd. |
24/04/2026
|
|
|
NTPC/USSC-CPG1/9900322773
|
|
RCC Road inside the Plant NTPC Kudgi |
Western Region Head Quarter-II |
24/04/2026
|
|
|
GEM/2026/B/7402430
|
|
OPERATION ASSISTANCE FOR MAIN PLANT AND OFFSITE AREA OF CPP-II EXPANSION PROJECT, NSPCL ROURKELA |
NTPC-SAIL Power Company Limited (NSPCL) - Bhilai |
23/04/2026
|
|
|
NGEL-CS-5731-004(BW)-9R
|
|
Construction of Boundary Wall at NGEL Bilhaur Solar PV Project in Uttar Pradesh |
NTPC Green Energy Ltd. (NGEL) |
23/04/2026
|
|
|
GEM/2026/B/7410121
|
|
Integrated HAZOP Study of CTM Project, Green Chemical Department of NTPC Vindhyachal |
Corporate Contracts |
17/04/2026
|
|
|
NRE-CS-5800-004(BOS2)-9
|
|
BALANCE OF SYSTEM (BOS) PACKAGE FOR DEVELOPMENT OF 200MW GRID CONNECTED SOLAR PV PROJECT AT BIKANER, RAJASTHAN |
Renewable Energy |
13/04/2026
|
|
|
PVUNL/Patratu/9900321396
|
|
Design, Supply and Erection of Prefabricated Structure (Store Shed) including all Civil and Electrical Works at PVUNL Plant |
Patratu Vidyut Utpadan Nigam Limited (Subsidiary) |
15/04/2026
|
|
|
CS-8003-364-9
|
|
Sipat Super Thermal Power Project Stage-III (1X 800MW) Township Package |
Corporate Contracts |
07/05/2026
|
|
|
NTPC/USSC-CPG1/9900322388
|
|
BULK PROCUREMENT OF RCCB |
Western Region Head Quarter-II |
15/04/2026
|
|