Salient Technical Features

Brief Scope of Work for “Integrated Smart Township System Phase-II for Eight NTPC Townships”

The Smart Township envisaged for the each project under initiative of smart township Phase-II shall consist of following components :

a)CCTV system: including Fixed Cameras, PTZ Cameras, Illuminator, Video Management Software including Video Analytics etc.

b)Access Control System (ACS): Under Vehicle Scanning System (UVSS), Boom Barriers, Turnstiles, Smart Cards, Card Readers, Biometric Readers, Controllers, Door Locks, Flap Barrier, Automatic Number Plate Recognition, DFMD (Door Frame Metal Detector), Biometric Enrolment Unit, Smart Card Enrolment Unit, Visitor Management System, Egress Switch, Long Range RFID system with readers & stickers for vehicular entry, X-ray Baggage Scanner, Guard Tour Management System etc.

c)OFC based Perimeter Intrusion Detection System (PIDS)

d)LED Panels (in 3X1 configuration) with suitable mounting arrangements/stand and other associated accessories) ,Furniture for SMART TOWNSHIP SYSTEM

e)Supply, Installation & Commissioning of GPON(Gigabit Passive Optical Network), FTTH(Fibre to the home) and wireless (Wi-Fi) Infrastructure and Management setup along with LAN switches and passive networking / cabling.

f)Smart Energy Management – Supply, Installation & Commissioning of Advanced Metering Infrastructure (AMI) comprising of Smart Energy Metering along with Communication/network hardware & other Hardware & software.

g)Complete Water Management system including below mentioned components:

Supply, Installation & Commissioning of Water Meters

,Ultrasonic/Electromagnetic Flow meters , Ultrasonic/Radar Level transmitters ,Tank Overflow Detection, Leakage Detection in external network, Solenoids for auto start & shut down of main Potable Water Pumps ,analyzers (PH, BOD, COD, Turbidity, Chlorine and TDS) at STP outlet , chlorine and turbidity analyzer at UGT inlet, Communication Hardware ,hardware & software for Water SCADA

h)Variable display boards, Power Supply including UPS of suitable backup.

i)GPS based system to Track Vehicles

j)Command & Control System including integration of above mentioned sub- systems and Employer’s Existing/Future sub-systems as defined in tech specifications.