Project: Bongaigaon TPP (3 x 250MW)
Package: Balance Work for Ventilation System Package
Salient Technical Features
1.0 The broad scope of works under ventilation system package include engineering
, manufacture, testing at works, delivery and storage at site, erection, testing and
commissioning of all ventilation equipments & associated instrumentation for
non-air conditioned areas of main power house, ESP building and other auxiliary
buildings.
2.0 Brief Description of Ventilation System:
2.1 Main Power House:
Each 250 MW unit would be provided with 4 nos. of metallic construction air
washer units (AWUs) each of capacity 1,50,000 m
3
/hr. along with supply air
centrifugal fan with motor, pump with motor, instruments, piping and other
accessories. Two (2) nos. of AWU shall be located in B-C bay at 27.0 M while
other two (2) shall be located outside A-row at 8.5 M. These air washer units
shall supply cooled air to TG building by means of GSS/AI ducting,
grills/dampers, etc. Roof Extractors (RE) fans would be provided at roof of TG
hall to exhaust hot air.
Major items pertaining to Air washer Units including centrifugal fan, pump,
motors, piping, valves, etc. and partial ducts were already supplied and available
at site to be used by the bidder for this package. However, complete Fabrication
and Erection of Air washer Units along with ducting, etc. is in bidder scope of
work.
2.2 ESP Control Room Building:
To cater to the ventilation requirements of non- air conditioned areas (switchgear
room, cable galleries, etc.) of ESP building, one (1) no. of unitary air filtration
(UAF) unit of capacity 65,000 m
3
/hr. would be provided along with supply air
centrifugal fan & motor, pump with motor, instruments, piping and other
accessories for each unit. Cooled air shall be supplied to various non-A/C areas
by means of GSS/AI ducting, grills/diffusers for each unit.
Major items pertaining to UAF Units including centrifugal fan, pump, motors,
piping, valves, etc. and partial ducts were already supplied and available at site
to be used by the bidder for this package. However, complete Fabrication and
Erection of UAF Units along with ducting, etc. is in bidder scope of work.
2.3 Supply air fans/exhaust air fans/ roof extractor fans with drive motors shall be
provided for miscellaneous areas such as pump houses, MCC rooms, battery
rooms, cable galleries, toilets, etc. in main power house, service building and
auxiliary building like canteen, CHP and O&M workshop, Permanent store, fuel
oil pressurizing pump house, ARCW pump house, fuel oil unloading pump house,
etc.
2.4 Ducts supplying air to switchgear rooms and cable spreader/ vault rooms in main
power house and ESP building shall be provided with motor operated fire
dampers. These dampers shall close in case of fire on receiving signals from the