BARAUNI THERMAL POWER STATION
PHASE-I (2X110 MW) AND PHASE-II (2X250MW)
GANGA WATER SUPPLY PACKAGE
Salient Feature of Barauni Ganga Water Supply Package
Barauni Thermal Power Plant
(2x110MW + 2 x250MW)
Supply of Ganga Water to Phase-I & Phase-II
Floating Barge with Approach Jetty Suitable for Installation of
Six Nos. of Pumps, Piping & associated Electrical & Mech.
Equipment/accessories
Six Nos. 1300m3/hr
(2W+1S) – for each Phase
3 Nos. of 2600m3/hr (2W + 1S)
Makeup Water Raising Main
2 Nos. 900mm dia from Barge to Makeup Water Facility Area
Two (2) x 600mm dia
Two (2) x 650mm dia
(Part of Pipeline is already laid)
Pre-Treatment Plant for
Phase-I
PT Plant Comprise pf Aerator, Clarifiers, Clarified Water Tank &
Pumphouse, Rapid Gravity Filters & Pumphouse, Potable &
Filter Water for DM System, Chemical House etc.,
Phase-I
CW- 2 x 20 Kg/hr
PT – 2 x 5 Kg/hr
Phase-II
CW- 2 x 35 Kg/hr
PT – 2 x 7 Kg/hr
Approx 40m Approach Bridge
Workshop, Mech. Aux. Building, Switchgear Buildings, Control
Room, Office, PT Plant Switchgear building & control room.
Electrical power to Barge pumping station and Make-up Water
facilities area
6.6 kV station switchgear board
33 kV Switchgear at Makeup water facility area
6.6 kV cables from the station switchgear in main plant
to 33 KV Sub Station near main plant gate.
33kV Aerial Bunched Cables in transmission poles
(approx. 4 km).
XLPE Cables
a) 2500kVA; 6.6kV/34.5kV, Oil Filled Service
Transformers at Sending End
b) 2500kVA; 33kV/6.6kV, Oil Filled Service Transformers
at Receiving End
c) 300kVA; 33kV/0.433kV, Oil Filled Service Transformers
at MUW Facility
d) 1000kVA; 6.6kV/0.433kV, Oil Filled Service
Transformers at Receiving End