Page 1 of 2
SALIENT TECHNICAL FEATURES FOR NIT NO. IFB/NIT: TLCMP/C&M/CS-71/2018-19
Date: 05.03.2019
The brief scope of work for “South pit” of Talaipalli area of Talaipalli Coal Mining Project of NTPC Limited,
located in Gharghoda Block, TALAIPALLI district, Chhattisgarh is given below:.
1.0 Clearing and preparation of area for excavation, dumping etc.,
1.1 Procurement, transport,
supply of Explosives and accessories for carrying out blasting operations.
(Services of statutory supervisory personnel shall be provided by NTPC Ltd. as and when
necessary).
1.2 Deployment of excavators, HEMM, dozers, graders, etc., for mining operations including
associated manpower.
1.3 Drilling and Blasting in Coal as well as OB.
1.4 Procurement, installation, operation and maintenance of crusher including arrangement of power,
water etc., for running the crusher.
1.5 Loading, transporting, dumping of overburden in dump yard, dumping of top soil in earmarked area
and dumping of crushed coal (-1OOmm) in Coal stock yard, dozing, grading, levelling at dump site,
coal stock yard including face & other specified places.
1.6 Re-handling OB including Top soil into the mine void shall be carried out after extractions of
estimated quantity of coal. The contractor shall plan the schedule of re-handling with prior approval
of the EIC/NTPC.
1.7 Quantity of OB (including Top soil) to be re-handled shall not be more than the quantity of dumped
OB (including Top soil).
1.8 Preservation of top soil and reclamation of re-handled dump.
1.9 Construction & maintenance of haul road including water spraying & dust suppress ion in Coal and
OB from mine to coal stock yard/OB dump/weigh bridge and other places in mine premises.
1.10 Lighting in mine, dump, weighbridge, coal stock yard, haul roads and other places to meet the
requirement of applicable statutes. Power arrangement in mine premises including weigh bridge
shall be done by the contractor.
1.11 Surface and mine water management including de-watering, construction and maintenance of
garland drains, monsoon preparation, nala diversion in the area shown in Plan, providing
embankment to arrest inrush of surface water into mine, prevent mixing of water from dump/coal
stock yard with surface water bodies etc.,
1.12 Construction and maintenance of entry and approach road to working area, dump yard, surface coal
stock yard and weighbridge.
Page 2 of 2
1.13 Diversion of power line falling within the mine and straightening & diversion of nala outside the
mine boundary and other associated works.
1.14 Liaisoning with Govt. Authorities/State Govt./ PAPs.
2.0 Details of the South pit area of Talaipalli Coal Mining Project, NTPC Limited.
2.1 The area to be worked is "South pit" of Talaipalli Coal Mining Project, located in village
Talaipalli,
Gharghoda block, TALAIPALLI District, Chhattisgarh. (approx .55 Kms from
TALAIPALLI on Gharghoda- Lailunga
State High way).
2.2
Total area
-
238 acre (approx) , (Quarry
-
124 acres (approx), Top soil &
08
Dump area- 99
acres, Coal Stock yard
,
Crusher-10 acre, Infra etc.,
-
6 acre (approx .)]
2.3
Status of Land Acquisition
-
Govt. Land and Forest Land has been handed over to NTPC
Limited by
GoCG/ GOI. Private land has been notified and 93% of payment has been made,
balance payment is
under process. The Contractor shall facilitate for taking the possession of the
land.
2.4 Plan showing the proposed working, dumping area and surface coal stock yard, various stage plans
have been enclosed.
2.5 Depth of the proposed working: Maximum depth- 60 m (approx .)
2.6 Expected OB dump height- Average 30m
2.7 Expected Top Soil Height - Average 15m
2.8 Approach road of the mine - PMGSY road from Gharghoda - Lailunga State Highway.
3.0 QUANTITATIVE DETAILS OF THE SUBJECT WORK
3.1 The work involves removal 11.10 million cubic meters of overburden (including Top soil),
extraction of 1.88 million tonnes of coal for the period of twenty -four (24) months and re-handling
of 6.60 million cubic meters of overburden (including Top soil) for the period of next four (4)
months. Total contract period is twenty eight (28) months.
3.2 The monthly overburden and coal quantity shall be jointly carried out by NTPC and the
Contractor.
3.3 The monthly excavation plan will be provided by the EIC.
3.4 The total quantity of overburden and coal in the contract can be varied upto ± 20% with the approval
of NTPC as a cushion to cover eventualities.
4.0 The detailed scope of work shall be as per Bidding document. In case of any conflict between
this salient technical features and bidding document, the provision of bidding document shall
prevail.