Sipat STPP, Stage-II (2x500 MW) – Brief scope of work & salient features
1.0 The brief scope of work for the subject package includes Design, Engineering, supply,
construction/erection/installation (including all associated mechanical, electrical, civil and C&I
works) of the following:
1.1 Reinforced concrete chimney shell (using slipform equipment) over a reinforced
concrete foundation including excavation in all types of soils including rocks,
dewatering and backfilling.
1.2 Internal structural steel platforms; Internal structural steel staircase and ladders; a
reinforced concrete roof slab supported over structural steel beams; a grade level
floor slab with metallic hardener finish; Roll-up door and personnel access doors
at the grade level; Roof drainage system; Painting of chimney shell surfaces and
painting/coating of all structural steel work and other components; wind tunnel
study.
1.3 Flue liner and duct along with liquid condensate collection system including wet
stack study.
1.4 Rack & pinion Elevator including mandatory spares.
1.5 Aviation obstruction lighting system including mandatory spares, lightning &
earthing protection system, Internal lighting, cables & wiring, distribution boards
and lighting panels, communication system and other electrical accessories.
2.0 Salient features:
a) Height of Chimney: 150 metres
b) Chimney configuration: 2 Nos. single flue chimneys as adopted for Lot-1A & 1B FGD
projects.
c) Diameter of flue liner: 8 metres
d) Diameter of chimney shell: 18m at top & 25m at bottom (Approx.)
e) Material of flue liner & duct: Ti/C-276 clad steel or Borosilicate block lining on mild steel as
adopted for Lot-1A & 1B FGD projects.