1 of 1
FARIDABAD GAS POWER STATION
C&I Renovation & Modernization Package
The C&I Package is intended for the procurement of the equipment and systems for
the control, protection, operation and monitoring of the two nos. of Gas Turbines and
auxiliaries and common systems like CW, CT, DMCW, ACW, COLTS, SCS etc. for
Faridabad Gas Power Station.
Human Machine Interface & Plant Information System (HMIPIS) is based on Large
Video Screen (LVS) displays supported by TFT monitor based Operator Work
Stations (OWS). The total system is networked through a Station-Wide LAN for use
of real time data of various plant areas by other users.
The sequence of events recording are also implemented as a part of Gas Turbine
DDCMIS system. A GPS based master and slave clock system is provided for
uniform and synchronized timing signals through out the entire station.
The power supply for the Gas Turbine is based on 220V DC/24V DC Converters.
For DDCMIS 3 years AMC after warranty is envisaged.
Field instruments like TT, Gas flow metering system, Sox- Nox analyzers as well as
measurement systems like vibration monitoring system for CW pumps & CT fans, 24
V DC Charger system with batteries, ST TSI and Vibration measurement and
analysis system for Gas Turbine etc are also part of this package.
Apart from above, Operator control desks, panels, Instrumentation, Control & Power
Cables are also included in this package.
The electrical part of the Package is intended for the procurement of 220V DC
charger system along with batteries, Static Frequency Converter (SFC) panel and
Static Excitation Equipment (SEE).