INTEGRATED TOWNSHIP PACKAGE FOR PB, CB & KD CMP
1. SALIENT TECHNICAL FEATURES
“Salient Tec
hnical Features of the equipment / systems / services covered in NIT No.
40087796 dated 16.10.2018 and Bidding Document No. CS-7010-364-9 are mentioned
below. These Salient Technical features are mentioned only to facilitate the prospective
bidders to prima-facie understand the requirements under the tender and the bidder
shall not in any way limit or alter the scope of work and technical features/specification of
equipment/system/services covered in the Bidding Documents. Detailed provisions in
regard of scope of work and technical features/specification of equipment/
systems /services, contained in the Bidding Documents shall be final and binding”.
LOCATION & APPROACH
NTPC Limited intends to develop Integrated Township for Pakri Barwadih (PB), Chatti
Bariatu(CB) & Kerandari (KD) Coal Mining Project at Village Sikri Garikalan, Barkagaon.
The project is located in Hazaribagh district of Jharkhand. Nearby airport of Ranchi is at a
distance of 87 KM.Nearest Railway station is Hazaribagh Town, which is at a distance of
25 KM.
BRIEF SCOPE OF WORK
The brief scope of work under this package shall include the following facilities
(Residential & Non-Residential buildings, All works including Civil, Electrification, lifts,
piping, fire fighting etc.) & Bulk services like Roads, Ext. Elect. Works, Drainage, Water
supply, Sewage network, STP etc.
Sl.No. Description
No.of
Blocks/Details
1 B-Type (Stilt +7) – 56 DUs 1
2 C-Type (Stilt +7) – 56 DUs 1
3 D-Type – 24DUs 3
4 HOP Residence / GM’s Residence 4
5
Bachelor Hostel (Stilt +7)
2
6 Training Centre 1
7 Hospital 1
8 Bal Bhawan Ladies Club & Nursery School 1
9 School 1
10 Guest House 1
11 Shoppin
g
Centre 1
12 Union & Association Office 1
13 Communit
y
Centre 1
14 Executive Club 1
15 Swimmin
g
Pool 1
16 Stadium 1
17
A
uditorium 1
18 Switch
g
ear bld
g
1
19 Substation bld
g
5
20 Under Ground Water Tank
21 Gate Complex & Compound Wall 1
22 Roads & Drains
23 Sewerage Systems
24 Internal Electrification Works
25 External Electrification Works
Page 2 of 4
Sl.No. Description
No.of
Blocks/Details
26 External Water Supply and Horticulture Network
27 Fire Fighting System
28 Elevators
29 Air Conditioning Works
30 STP
The fac
ilities indicated above are indicative and may be changed during construction.
2. TIME
PERIOD FOR T
HE CONTRACT
Ti
me Period for the Contract shall be 30 Months as per Work Schedule.
3. CO
MPENSATION FOR DELAY CLAUSE
(LD PARAMETERS)
S.No.
Period from
the date of
Letter of Award
Value of works
( as Cumulative
% of total value
of work ) to be
completed
during the period
Description of works in progress / to
be completed during the period
1
Upto end of 12th
month from the
date of LOA
24%
- Complete mobilization at site & Survey completed.
-
B type & C type :- RCC Works upto S+
5 in both buildings.
- B
achelor Hostels :-RCC Works upto S+6 of 1
st block
& R
CC Works upto S+3 in 2
nd block.
- D Type:- Completion of RCC works including brickworks in 1
block. Foundation completed
in other blocks.
- HO
P/ HOD Bunglow: - Found. Works com
pleted.
-
School, Hospital & Shopping Complx :- RCC
Works
c
ompleted.
- Switchgea
r:- Building completed Finishing in progress.
- S
ubstation:- 3 buildings completed
.
- S
ewerage layout:- Work
s started.
- E
xt. Elect. Works, Ext. Water Supply, STP :- submission
&
appro
val of drawings. Start of STP works &
Ext. Elect.Works.
Wor
ks in progress for all Residential & Non-Residential
buildings, Services etc.
2
Upto end of 18th
month from the
date of LOA
65%
- Completion of
1. D T
y
pe – 1 block
2. HOD Bungl
ow – 1no.
3. Ba
chelor Hostel – 1 b
lock
4. School
5. Sw
itchgear & Substation bldg.—Handed over
6.
UG
ta
nk
7. Complet
ion of STP, Ext Water Supply & Ext Elect Works.
W
orks in progress
- Fini
shing works & Building Services of all Residential
& balance Non-Residential buildings are in progress.
- Roa
d Works
3
Upto end of 24th
month from the
date of LOA
90%
- Completion of all bldgs. And services except for
the finishing, left out items, if any in the
following:-
1. D type-1 block
2. HOD Bunglow – 2 no.
3. Auditorium
2. Trainee Centre
3. Shopping Centre
4. Executive Club
Page 3 of 4
S.No.
Period from
the date of
Letter of Award
Value of works
( as Cumulative
% of total value
of work ) to be
completed
during the period
Description of works in progress / to
be completed during the period
6. Bal Bhawan
7. Community Centre
8. Stadium
9. Gate Complex
Building finishes, Services & Horticulture in progress.
4
Upto end of 30th
month from the
date of LOA
100%
- Completion of all works
4. CONTRACT PRICE ADJUSTMENT
FOR SCHEDULE- I: CIVIL WORKS
Fixed component 0.20
Labour component 0.15
Material component 0.35
Steel component 0.15
Cement component 0.10
Diesel component 0.05
FOR SCHEDULE- II: INTERNAL ELECTRIFICATION WORKS;
III: INTERNAL ELECTRIFICATION WORKS
IV: EXTERNAL WATER SUPPLY & HORTICULTURE
V: FIRE FIGHTING SYSTEM;
VI: ELEVATORS
VII: AC WORKS &
VIII: STP
Fixed component 0.30
Labour component 0.20
Material component 0.45
Diesel component 0.05
The WPI index for Cement & Steel components to be used for price adjustment
formula shall be "Pozzolana cement" & "MS Wire Rods" respectively as
mentioned in Office of the Economic Adviser, Govt. of India, Ministry of
Commerce & Industry.
The base year shall be 2011-12.
5. CONSTRUCTION WATER AND CONSTRUCTION POWER & STAFF/LABOUR
COLONY
1.0 The contractor shall arrange for construction water from underground/local
sources. All borings, pipe lines, pumps, water tankers, underground storage tank,
overground storage tank, etc, whatsoever required for taking the water from the
Page 4 of 4
underground source to the site of work shall be provided / erected / constructed /
maintained by the contractor at his own cost.
2.0 The Contractor shall not be entitled to any compensation on account of the
expenditure incurred in arranging the construction water.
3.0 Contractor shall make the arrangement for construction power on his own cost.
However, NTPC may provide the Construction power as per the site availability,
but the Contractor is not entitled for any compensation on account of the quality
& availability of power from NTPC.
4.0 The contractor shall make his own arrangement for construction/ rented
premises for labour / staff colony.