S.No. Description Nos.
---------------------------------------------------------------------------------------------------------------------
-----
29. Portable Marble / Tile cutting machine 10
30. Stone Cutting / Polishing Workshop fixed with heavy duty
machines 1 setup
31. Total workstation for surveying including digital theodolite
and digital level 02
32. Plywood Shuttering / steel plates shuttering Minimum 15000sqm
(to be augmented as per site requirement)
33. Hand roller 05
34. Sheep foot roller As required
35. Road roller 10T 2
36. Road Paver 1
37. Water tankers with tractors 4
38. Electrical power winches for varying capacities 3
39. Tower Crane 6
40. Any other major equipment proposed to be used for the satisfactory
completion of work
NOTES :
a) These requirements and capacity of the equipment are indicative
only and not exhaustive and deployment of the equipment,
machinery and labour shall be suitably augmented to achieve the
timely completion of the work as per the program and directions of
the engineer, without any additional cost to Owner.
b) Other materials like cables, sling, gloves goggles, safety belts,
safety helmets, heating oven, pre-heating / post weld heat
treatment arrangements, material for making platforms and
platform supports etc. shall be mobilised as per requirement.
c) Other equipment though required for the timely completion of the
job and but not listed above shall be deployed by the contractor,
as per the job requirements and as directed by the Engineer.
d) The contractor shall make suitable provisions for repairs and
maintenance of the equipment mobilised and always keep them in
good working condition, as the repair facilities for such equipment
are not available at the project site.
e) All concreting shall be carried out using centralised batching plant,
transit mixers, concrete pumps. However individual mixers for