
7 
 
http://www.ntpctender.com and shall immediately appraise the Employer about any fraud or suspected fraud 
as soon as it comes to their notice. A certificate to this effect shall be furnished by the bidder along with his 
bid.  If  in  terms  of  above policy  it  is  established  that  the  bidder  /  his  representatives have  committed  any 
fraud while competing for this contract then the bid security of the bidder shall be forfeited. 
 
Every bidder  must accept and  sign the format  of  acceptance of fraud  policy placed  in  the documents and 
submit the same along with documents. 
 
27.  Tender document issued to an intending bidder are NOT TRANSFERABLE. 
 
28. The  bidder  /  agency, to  which the  work for  deployment  of  vehicle  has been  awarded, has  to  sign  the 
contract agreement within 30 days from the date of issue of service purchase order. 
 
29.  Any damage to the property by you / your workmen shall be made good by you at your cost otherwise it 
shall be got done by NTPC at your risk and cost. 
 
30. Force Majeure shall apply. 
 
31.  A Copy of “General Conditions of Contract for Civil Work”, along with its amendments, is placed in the 
office of the NTPC Limited, which may be referred if required. This shall form part of the contract for all 
other clauses which are not specifically brought out. 
 
32.  GENERAL CONDITION: 
 
a)  Vehicle  provided  shall  be  of  good  condition  with  neat  clean  interior  Upholstery  and  fixed  with  seat 
covers suitable for comfort journey. 
The driver deployed on duty:-  
   Shall be sober enough to take adequate care of the officials in the vehicle and he should not indulge 
in any sort of arguments / behavior with the official / guest. 
   Consumption of alcoholic drinks / intoxicants by the driver while on duty is strictly prohibited. 
   Driver should carry activated mobile phone. 
 
      b)   In case of requisition / seizure of the vehicle by Government / municipality Administration or any other 
agency,  it  will  be  the  responsibility  of  the  contractor  to  get  the  vehicle  released.  During  such  period  of 
requisition / seizure, the contractor shall make alternative arrangement by providing Alternative vehicle to 
NTPC. 
33.    Except where otherwise provided for in the contract all questions and disputes relating to the meaning 
of  the  specifications,  definitions,  and  instructions  herein    before  mentioned  and  as  to  the  quality  of 
workmanship  or  materials  used  on  the  work  or  as  to  any  other  question,  claim,  right,  matter  or  thing 
whatsoever  in  any  way  arising  out  of  or  relating  to  the  contract,  definitions,  specifications,  estimates, 
instructions,  orders  or those  conditions or  otherwise  concerning the  works, or  the  execution or  failure to 
execute the same whether arising during the progress of the work of after the completion or abandonment 
thereof shall be referred to the sole arbitration of the Project In-charge of the Project concerned of NTPC 
and  if  the  Project  In-charge  is  unable  or  unwilling  to  act,  to  the  sole  arbitration  of    some  other  person 
appointed by the Chairman and Managing Director, NTPC  Ltd., willing to act as such arbitrator.  
 
34.    There will be no objection if the arbitrator so appointed is an employee of NTPC Ltd. and that he had 
to  deal  with the  matters  to which the  contract relates and that  in  the  course of his  duties as  such  he  had 
expressed views on all or any of the matters in dispute or difference. The arbitrator to whom the matter is 
originally referred being transferred or vacating his office or being unable to act or any reason as aforesaid