SALIENT TECHNICAL FEATURES
Air Conditioning and Ventilation System Package for Auxiliary Buildings for
Gadarwara STPP-I (2X800 MW)
Page 1 of 3
Salient Technical Features of the equipment/system/services covered in IFB No
40087530 dated 13.06.2018 is mentioned below. These Salient Technical features are
mentioned only to facilitate the prospective bidders to prima-facie understand the
requirements under the tender and shall not in any way limit or alter the scope of work and
technical features/specification of equipment/system/services covered in the Bidding
Documents. Detailed provisions in regard of scope of work and technical features/
specification of equipment/systems/ services, contained in the Bidding Documents shall
be final and binding.”
1.0
SCOPE OF WORK
The broad scope of work includes design, engineering, manufacture, testing at
works, delivery and storage at site, erection, testing and commissioning of
following:
a) All air-conditioning equipments for office areas in Service Building,
Administrative Building, Auditorium Building, Canteen Building and other
PLC/Microprocessor/ controller integrated GIU based control room.
b) Mechanical Ventilation System equipments for non-air conditioned areas of
Service building, Administrative building, Auditorium building, canteen and
various other auxiliary buildings like O&M Workshop and permanent store
etc.
2.0
BRIEF DESCRIPTION OF AIR-CONDITIONING SYSTEM
It is proposed to provide Screw chilling machines to meet the air conditioning
requirement of all the air conditioned areas of Service building and Administrative
building. Further, air-conditioning requirement of Auditorium and canteen would be
met with air-cooled condensing machines. Other PLC/Microprocessor/ controller
integrated GIU based control rooms of auxiliary buildings would be air-conditioned
using split (non-Ductable) air conditioners. Dining hall in Administrative building
would be air-conditioned using Cassette (non-Ductable) air conditioners. Details of
major areas to be air conditioned and the equipments proposed to be provided are
elaborated in the following para.
SALIENT TECHNICAL FEATURES
Air Conditioning and Ventilation System Package for Auxiliary Buildings for
Gadarwara STPP-I (2X800 MW)
Page 2 of 3
2.1
A/C Plant for Service building.
2.1.1
The A/C system would comprise of:
i) 2 X 150 TR capacity screw compression type chilling machine.
ii) Two (02) Nos. of primary chilled water pumps.
iii) Two (02) Nos. of variable frequency driven (VFD) Secondary chilled water
pumps.
iv) Two (02) Nos. of condenser water pumps.
v) Two (02) Nos. of variable frequency driven (VFD) cooling towers.
vi) Five (05) nos. of variable frequency driven (VFD) air handling units (AHUs)
vii) Interconnecting piping, duct work, insulation, cabling, PLC/Microprocessor
based control panel, instrumentation, etc.
2.2
A/C Plant for Administrative building.
2.2.1
The A/C system would comprise of:
i) 2 X 150 TR capacity screw compression type chilling machine.
ii) Two (02) Nos. of primary chilled water pumps.
iii) Two (02) Nos. of variable frequency driven (VFD) Secondary chilled water
pumps
iv) Two (02) Nos. condenser water pumps.
v) Two (02) Nos. of variable frequency driven (VFD) cooling towers.
vi) Eight (08) nos. of variable frequency driven (VFD) air handling units (AHUs)
Interconnecting piping, duct work, insulation, cabling, PLC/Microprocessor
based control panel, instrumentation, etc.
2.3
AC Plant for Auditorium.
2.3.1
The AC system would comprise of
i) 2 X 30 TR capacity air cooled type condensing machine.
ii) Two (02) Nos. of variable frequency driven (VFD) air handling units (AHUs)
iii) Interconnecting piping, duct work, insulation, cabling, PLC/ Microprocessor /
Controller integrated GIU based control panel, instrumentation, etc.
SALIENT TECHNICAL FEATURES
Air Conditioning and Ventilation System Package for Auxiliary Buildings for
Gadarwara STPP-I (2X800 MW)
Page 3 of 3
2.4
AC Plant for Canteen.
2.4.1
The AC system would comprise of
(i) 2 x 30 TR capacity air cooled type condensing machine.
(ii) Two (02) Nos. of variable frequency driven (VFD) air handling units (AHUs)
(iii) Interconnecting piping, duct work, insulation, cabling, PLC/ Microprocessor /
Controller integrated GIU based control panel, instrumentation, etc.
2.5
Non-Ductable Split Air-Conditioners.
2.5.1
AC plant control room in Administrative building and Service building.
(i) 8 x 3 TR Non Ductable (Split).
2.5.2
Dining hall in Administrative building.
(i) 2 x 4 TR Non - Ductable Cassette.
3.0 BRIEF DESCRIPTION OF VENTILATION SYSTEM:
3.1.0 Mechanical ventilation system consist of Supply/Exhaust/roof extractor fans
for ventilation of O&M Workshop/ Permanent Store/ Service Building/
Administrative Buildings /Auditorium /Canteen Buildings /etc. shall be
provided.