NTPC – SAIL POWER COMPANY LTD.
CORPORATE CONTRACTS & MATERIALS, NEW DELHI
Salient Tech.
Features
Renovation & Retrofitting of ESP at upgradation at Bhilai PP-II(2X30MW+14MW)BID
DOCUMENT NO: CC/C&M/C-497
Page2of2
(Option – I: Renovation & Retrofitting of existing ESPs with rigid discharge frame
work type design) Renovate the existing BHEL make ESP passes to enhance the
collecting area through redesign / re-engineering work like increasing its height, increasing
the collecting electrode spacing, adding additional field in series (if required) in the
available space and Install new additional ESP similar to the renovated ESP to achieve the
targeted emission level.
OR
(Option – II: Renovation & Retrofitting of existing ESPs in combination of rigid
discharge frame work type ESP with Moving electrode plate type design ESP
(MEEP)) Renovate the existing BHEL make ESP passes to enhance the collecting area
through redesign / re-engineering work like increasing its height, increasing the collecting
electrode spacing, adding additional field in series (if required) in the available space and
converting last one / two fix field of existing ESP to MEEP field and Install new additional
ESP similar to the renovated ESP consisting of fix field and MEEP field to achieve the
targeted emission level.
(b) In case of U#1 and U#3, existing Andrew Yule ESP pass shall be completely dismantled
and new ESP pass shall be erected in place of it. In the case of unit #2, new ESP pass
shall be erected in the space available between U#1 and U#2 and existing Andrew Yule
pass shall be completely dismantled.
(c) All Civil works including foundation for new fields of existing ESP & new parallel ESP,
Construction of new ESP SWGR room.
(d) inSupply, stallation and commissioning of electrical system including two nos. (02) nos.
6.6kV/415V Dry type Transformers, associated power, control & instrumentation cables,
switch gear and protection
(e) Associated instrumentation work.
(f) Replacement of internals of existing ESP and E&C of modified ESP and new ESP.
(g) CFD and Physical modeling of New as well as modified ESP.
(h) Supply of item/component as required.
(i) Supply of Mandatory spares as detailed in technical specification.
(j) Services like dismantling / repair / overhaul/retrofitting of various other components /
systems / sub-systems as may be required, to ensure sustained, safe commercial operation,
and to meet stipulated design / guarantee requirements and to meet the overall objectives of
retrofitting of ESP.
(k) The scope of work also includes erection of the total equipment, commissioning, gas
distribution testing, trail operation, Performance guarantee testing etc.