5. Construction of Main Control room(s) with switchgear room, Operator cabin (if any) store room
for spares, equipments, chemicals etc., with all electrical fitting and furniture, fencing of plant
boundary, security cabin etc.
6. Construction of switchyard(s) with associated electrical works required for interfacing with grid
(i.e. transformer, breakers, isolators panels, protection system, earthing and metering) and
evacuation of power through underground trench or cable trestle / over ground.
7. Construction of internal roads, pathways, fencing and drainage system.
8. Construction of water treatment / leachate treatment system.
9. Supply of all hardware & software electronic systems to upload emission parameter to website
for remote monitoring and display at plant gate.
10. Operation & maintenance of WtE Plant along with electrical equipments, consumables and
spare parts for a period of five years from the date of successful completion of trial run including
disposal of ash to nearby ash pond.
11. Supply, erection and commissioning of fire fighting systems and its network inside the plant.
FUNCTIONAL SPECIFICATION
400 TPD Waste to Energy plant in Full EPC basis at Badarpur Thermal Power Plant, New Delhi
Bidder shall provide comprehensive operation & maintenance of the plant for a period of five years from
the date of successful completion of trial run.
The scope of Functional specification includes the following
1. A system for receipt of MSW (which will be delivered by municipality at plant gate in trucks),
computerized weighment of truck / waste & bottom ash / fly ash, recording using computer in e-
form/ provision to issue computerized slip containing vehicle number, Date, time, weight etc.,
2. Automatic system for guiding incoming waste laden truck in tipping floor to unload waste in
designated chute (vehicle guiding system coordinated with waste pit monitoring system)
3. Storing of waste in waste pit, shredding for oversized waste, mixing of waste by using automated
grab crane system integrated with necessary control system, computer integration, display of
weight in each cell of waste pit (additional provision for manual operation of crane).
4. Automated temperature / flame monitoring system in waste pit, shredder, bunker area with
adequate fire fighting equipment, which has provision to operate both manual / auto option.
5. Leachate collection system for waste pit. Necessary leachate treatment system for reuse of
water.
6. Grate fired combustion system with air / water / combination of air & water system.
7. Trouble free proven type automatic hydraulic waste feeding system into combustor to ensure
complete combustion.
8. Fully automated temperature controlled waste feeding system, which allows waste fed into the
combustor only when the furnace temperature is above 950 Degree C.
9. Secondary / supplementary gas burner (PNG) system capable to maintain statutory minimum
temperature of 950 Degree C with 2 sec residence time in the furnace in addition to start up and
shut down capability. This should be completely integrated and automatic.
10. Fully automatic control system capable of operating the unit, recording all the process variables
(air / flue gas / steam – Pressure/ temperature / flow etc).
11. Dry type flue gas cleaning system together with bag filters to maintain required emission norms
as per SWM rules 2016. Minimum Flue gas temperature entering chimney 130 Degree C to
avoid visual pollution from Chimney outlet.
12. Necessary secondary air injection system / over fire air, flue gas recirculation (if required) system
to minimize the NOx formation.