7. Construction of Pre-Engineered type Inverter room with Power
conditioning unit associated LT and HT switchgear. In case of String
Inverter, Construction of Pre-Engineered type HT Switchgear room.
8. Construction of Central Monitoring and Control Station with switchgear
room, SCADA room, Store room, Battery room with all electrical fitting
and furniture, fencing of SPV plant, security cabin etc.
9. All associated electrical and civil works required for interfacing with
grid (i.e. transformer(s), breakers, isolators, panels, protection system,
cables. metering at 11 kV level, earthing of transformer etc.) and
evacuation of power to 11 kV Bulk-Supply Sub-Station of Durgapur
Steel Plant Township through 2X75% capacity 11 kV overhead lines
/cables.
10. Construction of internal roads, pathways, fencing, peripheral boundary
wall and drainage system.
11. SCADA system for remote monitoring and control of Inverters with all
hardware & software.
12. Operation & maintenance of SPV Plant along with electrical
equipment, associated power evacuation lines, consumables and
spare parts for a period of five years from the date of successful
completion of trial run.
13. Supply of Mandatory spares.
6.0 TECHNOLOGY
In Solar Photo Voltaic Power Generation the direct conversion of solar
radiation into electricity is achieved by using semiconductor devices “Solar
Cells” which work on the principles of photo electric effect.
7.0 POWER EVACUATION SYSTEM
The entire power generated from the proposed Durgapur Solar PV Power
Project (20 MWp) will be supplied to DSP/SAIL after meeting the auxiliary
power consumption of the proposed plant. Generated Power shall be
evacuated by means of two separate lines . This will be generally 11 KV
O/H lines , however underground cable shall be necessary to be laid
through some patches of the route where available corridor width is not
sufficient for overhead lines. The power evacuation lines shall be