Salient Technical Features
“Salient Technical Features of the equipment / systems / services covered in IFB No.
40058455 are mentioned below. These Salient Technical Features are mentioned only to facilitate the prospective bidders to
BRIEF SCOPE OF WORK FOR ASH WATER RECIRCULATION SYSTEM PACKAGE
1.The scope of work shall include design, engineering, manufacturing, shop fabrication, testing at works, transportation to site, unloading and storage at site, in plant transportation, insurance, fabrication at site, including all associated civil, structural & Architectural works, erection, testing, commissioning, trial operation, performance and guarantee testing and all equipment and works required for completing the Ash Water Recirculation System Package.
2.The decanted water from dyke shall be led to overflow lagoon. The water from overflow lagoon is proposed to be
3.Scope for Ash pond fugitive Dust suppression System inclusive of associated Civil, Electrical and C&I works for ash pond using decanted ash water is also included in this package. There are two (2) nos. fugitive dust suppression pumps (1W+1S) located at AWRS pump
Salient Technical Features
1.The scope of work covered in this package includes design, supply, erection and commissioning of complete Ash Water Recirculation System inclusive of associated Civil, Electrical and C&I works.
2.This scope also includes ash pond fugitive dust suppression system. Supply, erection and commissioning of Pumps, Piping and sprinklers are included in scope of work.
Other Salient Features –
a)Ash Water Recirculation Pumps (Pump
∙ |
Nos. Required |
: Two (2) |
∙ |
Capacity |
: 500 m3/hr, 46 MWC |
b) Ash Water Recirculation Pumps (Pump |
||
∙ |
Nos. Required |
: Two (2) |
∙ |
Capacity |
: 500 m3/hr, 58 MWC |
c) Recirculation Pipe |
: 300 NB size & 3.5 Km long |
Page 1 of 1
d) Dust suppression water pumps (Pump
∙ |
Nos. Required |
: Two (2) |
∙ |
Capacity |
: 170 m3/hr, 80 MWC |
e)Dust suppression water pumps (Pump
∙ Nos. Required |
: Three (3) |
∙ Capacity |
: 200 m3/hr, 110 MWC |