NAME OF THE PACAKGE: DEVELOPMENT AND OPERATION OF
These Salient Technical Features are mentioned only to facilitate the prospective bidders to
SALIENT FEATURES
INTRODUCTION
Kerendari ‘A’ Coal Block or, Kerandari Coal Mine has been allocated to NTPC under Captive mode. It is located in the northern part of the North Karanpura Coalfield and lies in Hazaribagh district of Jharkhand. This block is contiguous to Chatti Bariatu Block owned by NTPC in the West, Dumri Block in the North West, Kerendari ‘B’ in the East and Tandwa State Highway in the South.
The block is about 45 km. from Hazaribagh and is connected by an all weather metalled road going from Hazaribagh to Tandwa and the nearest rail head is Ray Station (Approximately 25 km from the block).
Kerandari ‘A’ Coal Block shows a flat topography and is dissected by a number of seasonal streams. The drainage is controlled by the Basaria nala in the East & Baldeori nala in the
The Mining Plan and Mine Closure Plan of Kerendari ‘A’ Coal Block is already approved by Ministry of Coal for a targeted capacity of 6 MTPA. The environment clearance has been granted by MoEF.
GEOLOGY
Total area of the allotted coal block is 654 Hectare (Ha). Geological Report procured from CMPDI covers 413 Ha on northern side with proven reserves (wherein detailed exploration is completed) and 241 Ha on southern side (dip side) with indicated reserves (wherein detailed exploration was not carried). Hence, Mining Plan was prepared and approved for proven reserves in northern part only. The block is moderately faulted with 5 faults. The strike of the strata is roughly
The Barakars are the main coal bearing formation in this block. There are four persistent coal seams in Barakar Formation, viz.
The most potential coal seams of the block from thickness point of view are Seam I TMC (14 to 15m), Seam I Middle (10 to 12m), Seam II Bottom (7 to 9m), Seam IV Combined (8 to 9m) and Seam IV Top (6 to 7m). The remaining potential coal seams namely Seam I Bottom, Seam I Top, Seam II Top, Seam III Bottom, IV Bottom and Seam L (Local) are thin having generally 1m to 3m thickness.
The total Mineable reserve within the block is 139.74 Million tones and the total corresponding overburden/ interburden is estimated as 616.65 million cubic meters.
MDO SCOPE OF WORK
The MDO shall undertake the land acquisition, Design and Construction of R&R colony,
NTPC’s SCOPE OF WORK
NTPC’s scope of work includes documented payment towards land acquisition, various grants under R&R, power supply at Main Receiving Station during operation stage etc. NTPC shall pay a fixed amount to MDO/Mine Operator for Design and Construction of R&R colony and