PROJECT: |
DURGAPUR POWER |
PACKAGE NAME: |
EPC PACKAGE |
“Salient Technical |
Features of the equipment/systems/services covered in |
IFB
ABRIEF SCOPE OF WORK
The Brief scope of work for the subject EPC Package for DURGAPUR
Design, Engineering, Manufacture, Supply, Construction, Erection, Testing & Commissioning works for the turnkey EPC Package for DURGAPUR
a)Basic Engineering of the plant including preparation of Plant Definition Manuals;
b)Detailed design of all the equipment and equipment system(s) including civil, structure steel & Architectural works included in bidder's scope;
c)Providing engineering drawings, equipment sizing & performance data, instruction manuals, as built drawings and other information;
d)Compliance with statutory requirements and obtaining clearances from statutory authorities, wherever required;
e)Complete manufacturing including shop testing/type testing;
f)The complete Civil, structural and architectural works including Ash dyke, topographical survey, site leveling, construction water for plant area, water supply and sanitation, infrastructure works including roads & drainage for plant, Effluent & sewage treatment facility for plant, main plant area structures and foundations
including turbine building, bunker building, boiler structure, ESP structure, service building, Administrative building, compressor house, complete coal handling plant and Ash handling plant, chimney, pipe/cable galleries and pipe/cable trenches, duct banks, pedestals, cooling towers, balance of plant buildings including CW System,
g)Packing and transportation from the manufacturer’s works to the site including Logistic studies, insurance, customs clearance & port clearance, port charges, if any;
h)Receipt, storage, preservation, handling and conservation of equipment at the site;
i)Fabrication,
j)Performance and guarantee tests after successful completion of initial operation;
k)Supply of spares on FOR site basis;
l)Reconciliation with Customs Authorities, in case of foreign Bidders;
m)Satisfactory conclusion of the Contract;
n)Insurance and other requirements
Detailed scope of work has been specified in the bidding documents.
B SALIENT TECHNICAL FEATURES
1.00.00 Steam Generator
1.01.00 Type
The Steam Generator (SG) shall include all equipment required for Two (02) numbers of Boiler of top supported single drum natural circulation and having Atmospheric Fluidized Bed Combustion with
1.02.00 Other Features of Steam Generator Design
The Steam Generator shall be AFBC (Atmospheric Fluidised Bed Combustion) type; top supported, dry bottom, with balance draft furnace with Economiser & Superheater arrangement and shall be suitable for outdoor installation. Tubular type Air Preheater is envisaged for flue gas heat recovery.
1.03.00 Rating of Steam Generator(s)
Steam Generator shall be designed to cater to duty requirements at Boiler Maximum Continuous Rating (BMCR) specified below:
Capacity of |
steam |
Steam Flow |
Temp |
|
Pressure |
|
||
generator & |
steam |
T/Hr. |
Deg C |
|
Kg/ sq cm |
|
||
parameters |
|
|
|
|
|
|
|
|
|
|
102% of the turbine |
To |
achieve |
turbine |
To be designed |
||
|
|
VWO steam flow |
throttle main |
steam |
for |
sufficient |
||
|
|
|
temp as indicated in |
steam |
pressure |
|||
|
|
|
clause |
3.02.00 |
to cater to |
the |
||
|
|
|
.Steam temp at super |
requirement |
of |
|||
|
|
|
heater outlet shall be |
Turbine |
|
inlet |
||
|
|
|
at least 3 deg c |
throttle |
steam |
|||
|
|
|
higher than the rated |
pressure |
|
|||
|
|
|
main steam temp at |
indicated |
in |
|||
|
|
|
turbine inlet. |
|
clause 3.02.00. |
|||
Feed water temp at |
|
To |
be optimized by |
|
|
|
||
economizer inlet |
|
the bidder |
|
|
|
|
1.04.00 Limiting Parameters for Steam Generator Design
The Steam Generator design shall comply with the following limiting parameters with design coal’ firing, under stipulated ambient air condition i.e. 27 degree Celsius temperature and 60 % relative humidity:
Flue gas temp at air heater outlet – 140 deg C (Maximum)
1.05.00 Operating Requirement:
1. |
Minimum load without oil |
|
|
support |
|
2 |
Operation without HP |
Steam generator shall also be designed for |
|
Heaters in service |
continuous operation with HP heaters out of |
|
|
operation. The steam generator heat output under |
|
|
HP heaters out conditions shall be at least 100% |
|
|
BMCR heat output with HP heater in service. |
3 |
Steam Temperature control |
The automatic control range of steam Generator |
|
range |
temperature shall be from 60% BMCR to 100% |
|
|
BMCR. Under the above control range, the steam |
|
|
|
temp at SH shall be maintained at their rated |
|
|
|
values. |
|
4 |
Mode of Steam Generator |
The plant shall be designed to operate as a base |
|
|
Operation |
load station catering the captive power |
|
|
|
requirement. Design of plant equipment and |
|
|
|
control system would permit participation of plant |
|
|
|
in automatic load frequency control. |
1.06.00 Coal/Ash data |
|
The primary fuel for the main steam generator shall be coal. Light Diesel Oil (LDO) shall be used for
Moisture (%) |
- |
6.0 |
Ash (%) |
- |
24.3 |
Volatile matter (%) |
- |
8.2 |
Fixed carbon (%) |
- |
61.5 |
Sieve analysis of the coal is as given in the specification.
2.00.00 Electrostatic Precipitator (ESP)
2.01.00 System Description:
The Electrostatic Precipitators shall be of outdoor type and installed on the cold end side of tubular air preheaters. The flue gas shall be drawn from air preheater outlets of the balanced draft, crushed coal fired Steam Generator and guided through adequately sized duct work into the gas streams of ESP. Similarly, the flue gas after the Electrostatic Precipitators shall be led to the suction of the induced draft fans.
2.02.00 Service Conditions
The Steam Generators are designed to burn crushed coal. LDO shall be used during startup of Steam Generator. The ESP shall be designed to remove fly ash particles (to meet the stipulated ESP emission levels) from the flue gas generated in the Steam Generator with fluidized bed combustion.
3.00.00 Steam Turbine
3.01.00 Type
The steam turbine shall be regenerative, condensing, directly coupled or coupled through a gear box to generator suitable for indoor installation.
3.02.00 Rating
The steam turbine generator unit shall conform to the following design and duty conditions:
1 |
Output under economic maximum continuous |
20MW |
|
rating (EMCR) guaranteed output load at |
|
|
Generator terminals |
|
2 |
Turbine throttle steam pressure |
To be optimized by bidder but not |
|
|
less than 85Kg/cm2 (abs) |
3 |
Turbine throttle steam temperature |
To be optimized by bidder but not |
|
|
less than 510 deg C |
4 |
Design & operational requirement including |
Generally as per IEC 45 or |
|
variations in rated steam temp & pressure |
otherwise specified in the spec. |
5 |
Condenser Pressure |
To be optimized by bidder |
6 |
Frequency variation range around rated freq of |
+3% to |
|
50Hz |
|
7 |
Turbine Protection against water induction |
As per |
3.03.00 Other Features
Turbine shall be capable of operating continuously with valves wide open (V.W.O.) to swallow at least 105% of EMCR steam flow to the turbine at rated main steam parameters and also the corresponding output shall not be less than 105% of rated load with 3% make up and optimised condenser pressure.
The steam turbine generator unit shall be suitable for direct connection to steam generator having no inter connection with other units either on the boiler feed water side or main steam side.
Turbine shall be designed for uncontrolled extractions for regenerative feed heating based on optimized cycle and suitable for tropical conditions.
4.00.00 Generator
4.01.00 Type
Stator air/water cooled, cylindrical air cooled rotor type.
4.02.00 Rating
Generator and its excitation system shall have a capability at least matching the declared maximum continuous rated output of the associated steam turbine at all power factors between 0.8 lagging and 0.95 leading with +3% to
variation, terminal voltage variation of +/- 5% and combined voltage & frequency variation of 5%. It shall be ensured that when the Generator is working at this capability and design cooling water temperature, no part of the Generator shall attain a temperature in excess of the temperature limits specified for class- B insulation as per
4.03.00Also the generator and its excitation system shall be capable of continuous stable operation without any excessive temperature rise at the peak output of the associated steam turbine under VWO & HP heater out condition at all power factors between 0.8 lagging and 0.95 leading with +3% to
4.04.00Rated Parameters
1. |
Power Factor |
0.8 (lag) |
|
|
|
2. |
Terminal voltage |
As per manufacturer’s standard |
3. |
Frequency |
50 Hz |
|
|
|
4. |
Speed |
As per manufacturer’s standard |
|
|
|
5. |
Short circuit ratio |
Not less than 0.48 (without any |
|
|
tolerance) |
5.00.00 Coal Handling Plant
Coal Handling Plant shall be designed based on specified Indian Coals. Rated capacity of CHP shall be as specified in the technical Specification. Coal from the coal stock yard up to the power plant will be transported by trucks by the owner.
The design capacity of the conveyors shall be 110% of the rated capacity.
Two stage crusher is envisaged.
6.00.00Ash Handling Plant
Ash handling system consists of the following sub systems:
1) Bed Ash Handling System
Pressure conveying system consisting of screw compressor, air lock/ pump tanks, air intake & discharge valves, CI / MS pipes IA compressors etc.
2) Dry Fly Ash Conveying system
Two alternatives for pneumatic conveying system are specified for conveying of fly ash in dry form from ESP hoppers upto buffer hoppers.
i)Vacuum Conveying System
It shall consist of liquid ring vacuum pumps, material handling valves, cast iron and MS pipes, instrument air compressors etc.
OR
ii) Pressure Conveying System
It shall consist of screw compressors, air lock/pump tanks, ash intake & discharge valves, CI & MS pipes, instrument air compressors etc.
3) Dry Fly Ash Transportation system
The dry fly ash from the buffer hoppers in each unit shall be transported to storage silos. The user industries shall take the dry fly ash from storage silos either in closed tankers or in open tankers. Provision shall be kept for disposal in slurry form to the ash dyke also.
4) Ash Disposal System
i) Bottom ash, economizer ash and air preheater ash (if applicable) shall be disposed off from ash slurry sump to ash disposal area by bottom ash slurry disposal pumps.
ii) The fly ash and air preheater ash (if applicable) shall be disposed off by slurry disposal system in lean phase.
7.00.00 CW Pumps, Cooling towers and Make up water system
CW equipment & Systems, Cooling towers and make up water system shall be provided as per the scope of technical specifications.
8.00.00 Fire protection system, Air compressors, AC and ventilation system shall be as per the scope of technical specification.
9.00.00 WATER TREATMENT SYSTEM
Water treatment system covers drawl of make up water from PP II, chlorination , Liquid Effluent Treatment, drawl of DM water from PP II.
10.00.00 Electrical Systems
The electrical items shall cover following:
Generator, Excitation System and its Auxiliary Systems Motors, Electric Actuators
Generator Busducts, MV Busducts and Generator Circuit Breaker.
Power Transformers, Auxiliary Oil Filled Transformers, Indoor Dry type Transformers
MV Switchgears, LV Switchgears and LV Busducts, Numerical Relay Networking, DC System, Battery and Battery Charger
HT Power Cables, LT Power and Control Cables, Cabling, Earthing and Lightning Protection, Lighting, DG Sets
33 kV GIS.
Control & Protection of complete electrical system including 33 kV switchyard and Generator Relay Panels, interfacing with Plant DCS system (Common control & monitoring for Plant equipments and Switchyard).
Construction Power facilities
Complete Electricals for Offsite Areas.
Type, Routine & commissioning Tests, Mandatory Spares as specified.
11.00.00 C & I Systems
The control system, called Distributed Digital Control Monitoring & Information system (DDCMIS) is envisaged to be procured under this package for control and operation of
Integral control & protection of boiler including Burner Management System and Boiler protection system.
The integral control & protection of Steam Turbine Generator including Electro- hydraulic control & Turbine Protection system.
Modulating controls of the Steam Generator (SG)
Modulating controls of Feed water & Condensate Cycle
Binary control of auxiliaries of Steam Generator (SG)
Binary control of auxiliaries of Turbine Generator (TG)
Electrical Breaker including synchronization circuits.
Coal Handling Plant.
Water System (DM Water system, Cooling Tower etc.).
CW System.
Air Conditioning and Ventilation systems.
Ash Handling Plant.
Human Machine Interface (HMI) is based on Large Video Screen (LVS) displays supported by TFT monitor based Operator Work Stations (OWS). These devices through customized
The sequence of events recording & alarm annunciation are also implemented as a part of DDCMIS system. A GPS based master and slave clock system is to be provided for uniform and synchronized timing signals throughout the entire station.
The power supply for the control system is based on 24V DC provided through microprocessor based modular charger system and for the peripherals and other subsystem through 230V Single Phase UPS.
Main Equipment related instruments like Flame Monitoring system, Coal Bunker Level measurement system, gravimetric feeder control system, Acoustic Pyrometer, Acoustic Steam Leak detection system, Furnace and Flame viewing system, Turbine stress control / evaluation system, Turbine supervisory and diagnostic system etc are also procured through this package.
Field instruments like pressure, DP, flow & level transmitter, analyzers along with their process connection & piping as well as measurement systems like vibration monitoring system etc are also procured through this package.
A
Apart from above, an
12.00.00 Civil Works
The site for Plant and offsite areas comprises of layers of filled up soil/ silty clay / clayey silt and sand/weathered rock layer at deeper depths. Removal of filled up soil as required for the work and its deposal to a location arranged by the bidder. The scope of Civil works shall include the analysis, design, construction, erection of all civil, structural and architectural work and all other items mentioned in this specification.
Entire civil engineering work including Design & engineering for all buildings, structures and facilities for foundations and equipments, roads, ramps, paving, parking areas, Supply / procurement of all materials, storm water drainage , plumbing & sanitary fittings, service lines and all other miscellaneous civil engineering works within the battery limit as shall be necessary for completing this package on a turnkey basis.
This civil works shall cover, survey works , site leveling works, design, preparation of general arrangement drawings, construction and fabrication drawings, supply of labour & materials and construction of all civil, structural and architectural works by the Bidder.
Open foundation are envisaged for major structures. The steel structures shall be pre- fabricated in factory and shall have bolted field connections (except chimney flue liners, coal bunkers & ducts which may be fabricated and welded at site).
13.00.00 SOLAR P.V Plants
Solar
14.00.00 Dozer:
Supply of one no dozer of 5 Tonne capacity is in the scope.
********