NTPC LTD. KORBA
CONSTRUCTION OF ASH STOWING PLANT AT SURAKACHHAR INCLINE 3 AND 4 UNDER GROUND MINES OF SECL KORBA.
SALIENT FEATURES OF THE WORK:
The works involves construction of RCC Bunker type structure for Ash Stowing in mine with approaches from both side. Construction of RCC water tank, structural steel works for mixing through, GI piping work from water tank to mixing through. The work include making of two nos. bore holes from ground level to the under ground mine i.e. up to 120 Meters. Fixing of MS casing in bore hole and also fixing of GI pipe through this casing from ground level to underground mine i.e. up to 120 Meters.
Estimated Cost:
135 Lacs (including all the construction materials and labours excluding Service Tax)
Tentative Completion Period: 6 (Six) Months from award of the work.