MODIFICATIONS IN SPITI ADMINISTRATIVE BUILDING AT SPITI, NTPC SOLAPUR


Salient Technical Features of the services covered in BI No.: 40046225 Date: 15.10.2015 is mentioned below. These Salient Technical Features are mentioned only to facilitate the prospective bidders to prima-facie understand the requirements under the tender and shall not in any way limit or alter the Scope of work and technical features / specification of equipment / systems / services covered in the Bidding Documents. Detailed provisions in regard of scope of work and technical features / specification of equipment / systems / services, contained in the Bidding Documents shall be final and bidding”.


SALIENT TECHNICAL FEATURES

This specification is intended to cover “Modification works at administrative building at SPITI, NTPC Solapur”. It is not the intent to specify completely herein all aspects of design and constructional features of equipments and details of the work to be carried out, nevertheless, the equipment and work shall be capable of performing in continuous commercial operation in a manner acceptable to the owner who will interpret the meaning of the specifications and drawings and shall have right to reject or accept any equipment or work which in this assignment is not complete to meet the requirements of this specification and /or applicable codes and standards mentioned elsewhere in the specifications.

The scope of work includes modification works (civil including internal electrification) at existing administrative building at SPITI, NTPC Solapur as per the detailed plan shown in tender drawings and Tender Specifications.

All work shall be performed in accordance with tender drawings, technical specifications, schedule of items, other tender documents, and directions of the Engineer-In-Charge. Item / items of work though specified in the schedule of item but for which detailed specifications are not given in the technical specifications, shall be performed as per the CPWD Specifications and best available industry practice.

The agency has to arrange all the materials and manpower required and other fixtures required for the work. There is no free issue material issued to agency. Agency has to procure all relevant materials strictly as per BOQ/specifications.

Electricity Supply required for the construction purpose will be provided by NTPC as per GCC.

Construction water will be in the scope of agency.