ANNEXURE-A
SALIENT TECHNICAL FEATURES
Name of the station : TALCHER SUPER THERMAL POWER STATION
Sub : ARC for Round the clock maintenance in CHP.
NTPC Kaniha/ Talcher Super Thermal Power Station is located in Kaniha block under Talcher sub-division of Angul district of Odisha.
Nearest Town - Talcher (26 KM)
Nearest Railway Station - Talcher Station (29 KM)
Nearest Airport - Bhubaneswar (180 KM)
STAGE - I - 2 X 500 MW
STAGE- II - 4 X 500 MW
Technical features :
Coal Handling Plant (CHP) of TSTPS is handling about 55000 MT of coal daily to feed 3000 MW Power Station. CHP is a vast area spreading across.
Transfer Points (TP) : 28 nos.
Track Hoppers(TH) : 3 nos.
Crusher Houses (CH) : 3 nos.
Bunker Floor (BF) : 12 nos.
The details of equipments in the above four major areas are as described below.
Paddle feeders : 12 nos.
ILMS : 12 nos.
MS : 4 nos.
VGF : 12 nos.
Crushers : 12 nos.
Belt feeders : 8 nos.
Conveyors : 68 nos including four Boom conveyors and twelve bunker conveyors.
Capacity-1600 TPH.
Flap gates : 98 nos.
Mobile tripper : 8 nos.
Stacker cum Reclaimer : 4 nos.
Each of the above equipments is having its own sub system like driving system, hydraulic system, lubricating system, travel drive system, cooling system depending upon functionality of the equipment.
The maintenance of the above systems are being done though this contract throughout the year.