ANNEXURE-A

SALIENT TECHNICAL FEATURES

PLANT OVERVIEW

NTPC Talcher-Kaniha (TSTPS) plant is located in Kaniha block under Talcher Sub-division of Angul

district in the state of Orissa.

Nearest Town : Talcher 26 KMs

Nearest Railway Station : Talcher 29 KMs

Nearest Airport : Bhubaneswar 180 KMs

INSTALLED CAPACITY

STAGE - I - 2 Units each 500 MW - Total 1000 MW

STAGE- II - 4 Units each 500 MW - Total 2000 MW

EQUIPMENTS INVOLVED

Stage-I Boiler:- 2 X 500 MW ,Once Through Tower Type, Single pass boiler

( No second pass), Maximum Height of Boiler:- 92 Mtr.

Make:- Stein Industries, France,

All the coil banks, i.e. Economiser-1, Economiser-2, LTRH, HTSH, HTRH, ITSH are arranged

horizontally.

Stage-II Boiler:- 4 X 500 MW, Circulation type two pass boiler with Drum.

Maximum Height of Boiler:- 85 Mtr. Make:- BHEL,

Three banks of Economiser, Two banks of LTSH are arranged Horizontally and Divisional Panel, Platen Super

Heater, Reheater are arranged vertically

Stage-I boiler where the contract will be operated has 134 no. of LTRH coils at 70mtr. Elevation and 134 no. of

Economiser-2 coil at 76mtr.Elevation and 134no. of Economiser-1 coils at 81 mtr elevation.There are 67 nos. of

HTSH coils at 66M elevation.

JOBS IN BRIEF

Overhauling of Boiler Pr. Parts, Stgae-I involves boiler water washing and erection of quick erect

scaffolding inside furnace for complete inspection of the furnace, erection of temporary platforms in the

boiler, over coil banks for accessing various coils in Inter Temperature Super Heater(ITSH), High

Temperature Reheater (HTRH) etc. Inspection and thickness survey of Hanger coil tubes and water

wall, tube replacement by TIG welding and radiography, Fin welding and shielding etc.

Welding of tube joints with IBR approved and tested HP welder.

It also calls for liaisoning with IBR inspector for repair order and licensing.

Safety aspects during execution will be sole responsibility of the contractor and it will be given prime

importance. As multiple agency will be working during overhauling handling of materials and

manpower movement has to be taken care off.