ANNEXURE-A

SALIENT TECHNICAL FEATURES

PLANT OVERVIEW

NTPC Talcher-Kaniha (TSTPS) plant is located in Kaniha block under Talcher sub-division of Angul district in the state of Orissa.

Nearest Town: Talcher 26 KMs

Nearest Railway Station: Talcher 29 KMs

Nearest Airport: Bhubaneswar 180 KMs

INSTALLED CAPACITY

STAGE - I - 2 Units each 500 MW - Total 1000 MW

STAGE- II - 4 Units each 500 MW - Total 2000 MW

EQUIPMENTS INVOLVED

Boiler, TG and auxiliaries, piping, valves etc of stage-I & II units

Jobs In brief

In general the contract consistes of routine meaintenance, overhauling maintenance and breakdown maintenance.

Major jobs included in this contract are removal of insulation and cladding during emergency and breakdown maintenance and during overhauling works of Boiler, Turbine, Turbine auxiliaries, pipings, valves etc. Cleaning, putting insulation mattresses and sheeting has to be done as per availability of clearances from EIC while the works of breakdown maintenance are required to be carried out in hot/warm condition, the overhauling works to be carried out to achieve completion of lagging and sheeting works of areas upto 2000-3000m2 in a short span of 6-7 days.

The job also requires that the contracting agency must visit / take a round of each unit, identify the damaged / missing insulation area, maintain a record and carryout the same after obtaining the permission of EIC and obtaining the necessary permit to work.

Taking all the safety precautions for working at height is responsibility of the contractor.