Brief Scope of Work
The brief scope of work includes design, engineering, manufacture, testing at works, delivery and storage at site, erection, testing and commissioning of following:
a) All
b)All ventilation system equipments for
Page 1 of 4
Salient Technical Features
Salient Technical Features of the equipment/system/services covered in IFB No 40029021 dated 11.11.2014 is mentioned below. These Salient Technical features are mentioned only to facilitate the prospective bidders to
1.0BRIEF DESCRIPTION OF
It is proposed to provide Screw chilling machines to meet the air conditioning requirement of all the air conditioned areas of main plant.
1.1A/C Plant for main plant
1.1.1One Centralised chilled water plant has been envisaged for:
a)Control Rooms (CRs), Control Equipment Rooms(CERs),
b)UPS, Battery charger room
c)SWAS room.
1.1.2The A/C system would comprise of :
(i)3 x 185 TR capacity screw compressor type chilling machine.
(ii)Three (03) Nos. of chilled water pumps.
(iii)Three (03) No. of condenser water pump.
(iv)Three (03) No. of cooling tower.
(v)Eight (8) nos. of variable frequency driven (VFD) air handling units (AHUs)
Page 2 of 4
(vi) Interconnecting piping, duct work, insulation, cabling, DCS based control panel, instrumentation, etc.
1.2A/C Plant for ESP Control Rooms
1.2.1The A/C system would comprise of:
(i)2 x 45 TR capacity
(ii)Four (04) Nos. of variable frequency driven (VFD) air handling units (AHUs)
(iii)Interconnecting piping, duct work, insulation, cabling, DCS based control
panel, instrumentation, etc.
1.3A/C Plant for Water system control building
1.3.1The A/C system would comprise of:
(i)2 x 25 TR capacity
(ii)Two (02) Nos. of variable frequency driven (VFD) air handling units (AHUs)
(iii)Interconnecting piping, duct work, insulation, cabling, DCS based control panel, instrumentation, etc.
2.0BRIEF DESCRIPTION OF VENTILATION SYSTEM
2.1Main Power House
Twenty (20) nos. of modular type air washer units (AWU) each of capacity 1,00,000 m3/hr and two (2) nos. of air washer units (AWU) each of capacity 50,000 m3/hr along with DIDW centrifugal fan & motor, pump with motor, instruments, piping and other accessories shall be provided. These air washers shall be placed at various floors of TG building shall supply cooled air to TG building by means of GSS/AL ducting, grills, diffusers and dampers, etc. Roof Extractors (RE) fans would be provided at roof of TG hall to exhaust hot air.
2.2ESP Control room
To cater to the ventilation requirements of non- air conditioned areas (switchgear room, cable galley, etc.) two (2) no. of Unitary Air Filtration (UAF) unit (one for each unit) of capacity 75,000 Cu.m/Hr would be provided along with DIDW centrifugal fan & motor, pump with motor, instruments, piping and other accessories. Cooled air shall be supplied to various
2.3Supply air fans/Exhaust air fans/ Roof extractor fans with drive motors shall be provided for pump houses, MCC rooms, battery rooms, cable galleries, auxiliary buildings ,toilets, etc.
Page 3 of 4
2.4Ducts supplying air to switchgear rooms and cable spreader/ vault rooms in main power house and ESP building shall be provided with motor operated fire dampers. These dampers shall close in case of fire on receiving signals from the Fire Detection and Protection system.
Page 4 of 4