SALIENT TECHNICAL FEATURES
(RATE CONTRACT FOR O&M OF A/C AND VENTILATION SYSTEM)
PLANT OVERVIEW
NTPC
Nearest Town: |
Talcher 26 KMs |
Nearest Railway Station: Talcher 29 KMs |
|
Nearest Airport: |
Bhubaneswar 180 KMs |
INSTALLED CAPACITY
STAGE - I - 2 Units each 500 MW - Total 1000 MW
STAGE- II - 4 Units each 500 MW - Total 2000 MW
EQUIPMENTS INVOLVED
Location |
MAIN PLANT |
Switch yard |
|
DM |
Service |
|
|
U#1,2 |
|
|
plant |
|
BUILDING |
Type |
|
|
Centralized |
|
|
|
|
|
|
|
|
|
|
Compressor. |
5H86 X 8 |
5H60 X 2 |
|
5H40 X 2 |
5H40 X 4 |
5H60 X 2 |
|
(80 TR) |
(60TR) |
|
(40 TR) |
(40 TR) |
(60TR) |
Total |
640 TR |
120 TR |
|
80 TR |
160 TR |
120 TR |
Capacity |
|
|
|
|
|
|
AHU |
6 (For CER), |
|
|
|
|
|
|
12 (other than |
3 |
|
3 |
6 |
3 |
|
CER) |
|
|
|
|
|
Cooling |
4 |
2 |
|
2 |
4 |
2 |
Tower |
|
|||||
|
|
|
|
|
|
|
Condenser |
4 |
2 |
|
2 |
4 |
2 |
p/p |
|
|||||
|
|
|
|
|
|
|
Chiller p/p |
4 |
Nil |
|
Nil |
Nil |
Nil |
|
|
|||||
|
|
|
|
|
|
|
Ventilation |
Kirloskar (8 |
Nil |
|
Nil |
Kirloskar |
Nil |
PP |
nos.) |
|
|
|
(2 NOS.) |
|
Ventilation |
ABB Flakt (8 |
Nil |
|
Nil |
ABB Flakt |
Nil |
Fan |
nos.) |
|
|
|
(2 NOS.) |
|
Location |
|
|
|
MAIN PLANT |
|
|
ESP AREA |
|||||
|
|
|
CENTRALIZED A/C |
VENTILATION |
A/C PLANT |
|
VENTILATION |
|||||
|
|
|
VAPOUR |
SCREW |
|
|
|
|
|
|
|
|
Equipment |
|
ABSORBTION |
CHILLER |
|
|
|
|
|
|
|
||
|
MACHINE |
(CARIER |
ACCEL |
|
||||||||
Model |
|
|
||||||||||
|
(THERMAX |
AIRCON) |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
C213+/62/63) |
|
|
|
|
|
|
|
|
|
Capacity |
|
2X300TR |
2X300TR |
10000 M3/Hr |
8 X 75 TR |
|
6000/400 M3/Hr |
|||||
AHUs |
|
22 Nos. |
NA |
4 X4=16 nos. |
|
NA |
||||||
AWU /UAF |
|
NA |
NA |
6 X4 =24 |
|
NA |
|
2X4 =8 |
||||
Cooling |
|
8 (FORCED DRAFT) |
NA |
4 x 2=8 (FORCED |
||||||||
Towers |
|
DRAFT) |
|
|||||||||
|
|
|
|
|
|
|
|
|
||||
Cooling |
|
|
|
|
|
|
|
|
|
|
|
|
Water |
|
8 |
|
4X4 =16 |
4 x 2 =8 |
|
2 X4 =8 |
|||||
Pumps |
|
|
|
|
|
|
|
|
|
|
|
|
Chilled |
|
|
|
|
|
|
|
|
|
|
|
|
Water |
|
8 |
|
|
4x2=8 |
|
……… |
|||||
Pumps |
|
|
|
|
|
|
|
|
|
|
|
|
Refrigerant |
|
|
|
|
||||||||
|
|
|
ADMINISTRATIVE BUILDING AND SERVICE |
A/C SYSTEM |
||||||||
|
|
|
|
|
|
|
|
|
|
|||
|
LOCATION |
|
ADMINISTRATIVE |
|
SERVICE BUILDING |
|
||||||
|
|
|
|
|
BUILDING |
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
||
|
TYPE |
|
|
CENTRALIZE |
|
|
CENTRALIZE |
|
||||
|
|
|
|
|
|
|
|
A) |
SCREW CHILLER |
|
||
|
|
|
|
|
|
|
|
|
MAKE – TRANE |
|
||
|
TYPE OF |
|
SCREW CHILLER |
|
B) |
VAM |
|
|
|
|||
|
MACHINE |
|
MAKE - TRANE |
|
|
MAKE - THERMAX |
|
|||||
|
|
|
|
|
|
|
|
|||||
|
CAPACITY |
|
2 x 225 TR |
|
|
2 x 200 TR |
|
|||||
|
AHU |
|
|
MAKE – FRICK |
|
|
MAKE – FRICK |
|
||||
|
|
|
NOS.- 12 NOS. |
|
|
NOS.- 09 NOS. |
|
|||||
|
|
|
|
|
|
|
|
|||||
|
CONDENSER |
|
MAKE – BEACON |
|
|
MAKE – BEACON |
|
|||||
|
|
MODEL – |
|
|
MODEL – |
|
||||||
|
WATER PUMP |
|
|
|
|
|||||||
|
|
POPULATION – 02 NOS. |
|
POPULATION – 02 NOS. |
|
|||||||
|
|
|
|
|
|
|
||||||
|
CHILLER |
|
MAKE – BEACON |
|
|
MAKE – BEACON |
|
|||||
|
|
MODEL – |
|
MODEL – |
|
|||||||
|
WATER PUMP |
|
|
|
||||||||
|
|
POPULATION – 02 NOS. |
|
POPULATION – 02 NOS. |
|
|||||||
|
|
|
|
|
|
|
||||||
|
|
|
|
|
MAKE – PAHARPUR |
|
|
MAKE – PAHARPUR |
|
|||
|
COOLING |
|
COOLING TOWER |
|
|
COOLING TOWER |
|
|||||
|
TOWER |
|
|
MODEL – 6021 |
|
|
MODEL – 6022 |
|
||||
|
|
|
|
|
POPULATION – 02 NOS. |
|
|
POPULATION – 02 NOS |
|
|||
|
REFRIGERANT |
|
R – 134 (A) |
|
R – 134 (A) and LITHIUM |
|
||||||
|
|
|
|
BROMIDE |
|
|||||||
|
|
|
|
|
|
|
|
|
|
|||
MAIN PLANT DDCMIS U#1,2 |
|
ASPH |
|
|
|
|
|
|
|
|
|
Type |
PACKAGE TYPE |
|
|
|
|
|
|
Compressor |
HERMATICALLY SEALED |
|
|
|
|
|
|
Total Capacity |
13 TR |
9 TR |
|
|
|
|
|
Evaporator Fan |
2 X 3 NOS. |
1 X 2 NOS. |
|
|
|
|
|
Condenser Fan |
2 X 9 NOS. |
2 X 2 NOS. |
|
|
|
|
|
JOBS IN BRIEF
1)Operation of the various A.C and Ventilation plants to maintain the controlled atmosphere in specified spaces.
2)Preventive / Predictive maintenance of the various equipments.
3)Break down maintenance of various equipments
4)Overhauling of the equipments.