SALIENT TECHNICAL FEATURES (ASH DISPOSAL PIPE LINE OF
PLANT OVERVIEW
NTPC
Nearest Town : |
Talcher 26 KMs |
Nearest Railway Station : Talcher 29 KMs |
|
Nearest Airport : |
Bhubaneswar 180 KMs |
INSTALLED CAPACITY
STAGE - I - 2 Units each 500 MW - Total 1000 MW
STAGE- II - 4 Units each 500 MW - Total 2000 MW
EQUIPMENTS INVOLVED
There are six ash disposal series from Ash slurry Pump House to
JOBS IN BRIEF
In general the contract consists of miscellaneous maintenance, pipe rotation, pipe replacement/Lifting pipe line extension in Ash dyke, welding joints, fabrication and erection of MS bends, replacement of basalt pipe & bends, thickness measurement of pipe line and watch & ward of disposal pipe lines. The sprinkler system to be laid / operated inside the ash dyke area.