ANNEXURE-A

SALIENT TECHNICAL FEATURES

PLANT OVERVIEW:

NTPC Talcher Kaniha (TSTPS) plant is located in Kaniha Block under Talcher sub-division of Angul district, in the state of Orissa.

Nearest Town

:

Talcher 26Kms.

Nearest Railway Station

:

Talcher 29 Kms.

Nearest Airport

:

Bhubaneswar 180 Kms.

INSTALLED CAPACITY

 

 

STAGE-I - 2 UNITS EACH 500MW- TOTAL -1000 MW

STAGE-II- 4 UNITS EACH 500 MW – TOTAL-2000 MW

JOBS IN BRIEF:

The Contract will be comprehensive in nature which will include both maintenance and supply of spares of the existing M/s. PELCO, USA make CCTV system installed in 2009-10.

The complete system includes all the Hardware (including F.O. Video and Power cables) located thought out the CHP. The scope of work shall include day to day maintenance against breakdown and repair / replacement of hardware against failure and maintenance of software in the system.

Standard check lists are available with engineer in charge to confirm the availability and performance of the system. Party’s representative has to comply and fill standard check lists with predefined frequencies as decided by engineer in charge. Vendor has to attend the defects as identified through the check list.