Lara Super Thermal Power Project Stage – I (3X800MW)
I)BRIEF SCOPE OF WORKS
The scope of work includes design, engineering, manufacture/fabrication, application of external
II)SALIENT TECHNICAL FEATURES ARE AS FOLLOWS:
1)Three options for
OPTION I:
a)Two (2) parallel Cross Country
b)Sacrificial and Impressed Current Cathodic Protection system for buried pipelines.
c)Polyolefin tape coating for special sections, connections and fittings of buried pipelines.
d)Heat Shrink Wraparound Sleeves for field joints of buried pipelines.
OR
OPTION II:
a)Two (2) parallel Cross Country
Page 1 of 2
b)Two (2) parallel Cross Country
i)1016 mm OD, 10 mm thick (3LPE coated and bare MS pipes)
OR
ii)900 mm DN, K7 class DI pipes, Standard fittings & specials of K12 class
c)Required length of Polyethylene sleeves for buried pipelines (as applicable).
d)Sacrificial and Impressed Current Cathodic Protection system for buried pipelines (as applicable).
e)Polyolefin tape coating for special sections, connections and fittings of buried pipelines (as applicable).
f)Heat Shrink Wraparound Sleeves for field joints of buried pipelines (as applicable).
g)2 years Annual Maintenance Contract.
OR
OPTION III:
a)Two (2) parallel Cross Country
b)Standard fittings & specials of K12 class
c)Required length of Polyethylene sleeves for buried pipelines.
d)2 years Annual Maintenance Contract
In addition to above, following shall also be provided:
2)Minimum Seventy (70) numbers of 200 NB Air release valves along with stubs, pipes and isolation valves along the complete
3)Carrying out Hydraulic Transient Analysis studies.
Page 2 of 2