Salient Technical Features
Salient Features:-
Salient Technical Features of the equipment / systems / services covered in the IFB no.
‘EHV & HV Power Transformers Package’ covers design, engineering, manufacture, supply, testing at works, short circuit testing, transportation to site, in plant transportation, receipt, handling and storage at site, erection and commissioning of various Transformers and inclusive of necessary tools and tackles and supply of mandatory spares & Maintenance equipment and 5% extra transformer oil.
The bill of material is following:-
Biillll
EHV&HVPOWERTRANSFORMERS PACAKGE
Sr.. No.. |
Equiipment Name |
Rating |
Quantiity |
|
|
|
(To be |
|
|
|
tendered) |
1.. |
Stattion Transformer (ST) |
110/55/55MVA,, 132/11..5/11..5kV with |
2 Nos.. |
|
|
OLTC (±10%) |
|
2.. |
Misc..Service Transformer |
31..5 MVA,, 132/34..5 witth OLTC (±10%) |
2 Nos.. |
|
(MST) |
|
|
3.. |
MUW Transformer |
7..5MVA,, 132//11..5 with OCTC (±5%) |
2 Nos.. |
|
(MUWT) |
|
|
4.. |
Unit Transformer(UT) |
45 MVA,, 23..5//11..5kVwith OLTC(±10%) |
4 Nos.. |
5.. |
Measuring Kits |
|
|
|
|
|
a.. |
Oil BDV |
Automaticoiltesttiing unit forchecking |
1 No.. |
|
|
|
Measurementt kit.. |
BDVofttransformer oiluptto 80kV.. |
|
|
|
|
|
|
|
|
|
b.. |
Dielecttric Response |
|
- |
1 No.. |
|
|
Analyzer |
|
|
|
|
|
|
|
|
|
|
c.. |
Oil tan deltaand |
Suiitablefor measurement of Volume |
1 No.. |
|
|
|
resistivitty |
|
||
|
|
measurement kitt.. |
loss facttorwith elevated temperature read |
|
|
|
|
|
outt fortransformer oiill.. |
|
|
|
d.. |
Dew poiint |
|
|
1 No.. |
|
|
measurement |
|
|
|
|
|
instrumentt.. |
|
|
|
|
e.. |
FRA Test Kit |
|
|
1 No.. |
|
|
|
|
|
|
|
f.. |
Capacitance&tan |
1 No.. |
||
|
|
delta measuring |
|
|
|
|
|
equipment (wiith |
|
|
|
|
|
cables etc..) |
|
|
|
|
g.. |
Transformers turns |
Displlay of rattiio & phaseangledeviattiion.. |
1 No.. |
|
|
|
rattiio (TTR) Kit |
|
|
|
|
|
|
|
|
|
|
h.. |
Winding resiistance |
|
|
1 No.. |
|
|
measurement KIT |
|
|
|
|
|
|
|
|
|
6.. |
Oiill Purifying Equiipment |
10 |
KL/ hr.. |
1 No.. |
|
|
|
|
|
|
|
7.. |
Oiill Purifying Equiipment |
1..0 |
KL/ hr.. |
1 No.. |
|
Sr.. No.. |
Equiipment Name |
Rating |
Quantiity |
|
|
|
(To be |
|
|
|
tendered) |
8.. |
Vacuumpump witth mottor |
Free aiirdisplacementt of3040L/miin,, |
1 No.. |
|
|
Ultimatepressureof0..7PA & Blankoff |
|
|
|
vacuumof 0..01torr.. |
|
9.. |
Off Linelaboratory modell |
|
1 No.. |
|
oil DGA Kit |
|
|
|
|
|
|
10.. |
Oiilltanker,, wheel |
10kLCapaciity |
5 Nos.. |
|
mounted,, |
5kL Capacitty |
5 Nos.. |
11.. |
NGR |
11KV,, 600A for 10 sec.. |
10 Nos.. |
|
|
|
|
12.. |
SpareTrans..Oil (by voll..) |
Asspecified |
5% |
13.. |
Mandatory Spares |
Asspecified |
LOT |
|
|
|
|
Brief Scope of Work for Darlipali
The brief Scope of Work is as under:
The package covers design, engineering, manufacture, testing at works, short circuit testing, transportation to site, receipt, handling and storage at site, erection and commissioning of various Transformers and inclusive of necessary tools and tackles and supply of mandatory spares & Maintenance equipment and 5% extra transformer oil.