SALIENT TECHNICAL FEATURES OF HEAD RACE TUNNEL (BALANCE WORK) PACKAGE FOR TAPOVAN VISHNUGAD HYDRO ELECTRIC POWER PROJECT (4X130 MW)
“Salient Technical Features of the equipment/systems/services covered in NIT No.
SALIENT TECHNICAL FEATURES
LOCATION
|
a) |
|
State |
|
- |
Uttarakhand |
||
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
b) |
|
District |
|
- |
Chamoli |
||
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
c) |
|
Tehsil |
|
- |
Joshimath |
||
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
d) |
|
Latitude & Longitude at barrage |
- |
Latitude : N 30 29 30 |
|||
|
|
|
|
|
|
Longitude : E 79 37 30 |
||
|
e) |
|
River |
|
- |
Dhauliganga (Tributary of Alaknanda) |
||
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|||
|
HEAD RACE TUNNEL |
|
|
|||||
|
a) |
|
Length and shape |
- |
12.087 km, Horse shoe/ Circular |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b) |
|
Diameter |
|
- |
5.64 m |
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
c) |
|
Design discharge |
- |
122.18 cumecs |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d) |
|
Velocity |
|
- |
4.96 m/sec |
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
e) |
|
Number of intermediate adits |
- |
3 |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
PRESENT STATUS OF HEAD RACE TUNNEL PACKAGE WORKS |
|||||||
|
|
|
|
|
|
|
||
|
Sl. |
|
|
Description of work |
|
Present Status |
||
|
No. |
|
|
|||||
|
|
|
|
|
||||
|
1 |
|
|
Excavation of Intake adit |
|
Completed |
||
|
|
|
|
|
|
|
||
|
2 |
|
|
Excavation of TBM Entry Adit |
|
Completed |
||
|
|
|
|
|
||||
|
3 |
Excavation of Branch Adit |
|
Completed |
||||
|
|
|
|
|||||
|
4 |
Excavation of TBM Exit Adit (Charmi |
193m left |
|||||
|
|
|
|
|
adit) |
|
|
|
Sl. |
Description of work |
|
Present Status |
No. |
|
||
|
|
|
|
5 |
Excavation of HRT by Drill and Blast |
|
HRT excavation from RD 14.5m to |
|
Method |
|
1911.5m has been carried out from intake |
|
|
|
adit. |
|
|
|
HRT excavation from RD 2798m to |
|
|
|
2939m has been carried out from Branch |
|
|
|
Adit |
|
|
HRT Excavation from RD 11914m to RD |
|
|
|
|
12087 has been carried out from surge |
|
|
|
shaft adit. |
6 |
Tunnel Concrete lining works in Drill |
Overt lining works carried out from RD |
|
|
and Blast Portion of HRT |
|
23m to RD 207m and RD 218m to 230m |
|
|
|
in HRT U/s of Intake adit. |
|
|
About 72m overt lining has been carried |
|
|
|
|
out from surge shaft end. |
7 |
Excavation of HRT by TBM |
Excavation of HRT by TBM has been carried |
|
|
|
out from RD 11914m to RD 6482m (5432m), |
|
|
|
precast lining has also been erected in this |
|
|
|
reach. |
|
8 |
Present status of TBM |
Presently TBM is standing in an area having |
|
|
|
multiple weak zones. A top heading has been |
|
|
|
created above TBM from 9 O’clock to 3 |
|
|
|
O’clock. |
|