Annexure-I
NTPC Limited
(A Government of India Enterprise)
Talcher Super Thermal Power Station
SALIENT TECHNICAL FEATURES
Sub : Deployment of tractor with trolley for transportation of unwanted materials inside plant.
SALIENT TECHNICAL FEATURES :
Talcher super Thermal power project is a Unit of NTPC, in Kaniha block under Talcher sub- division of Angul Dist of ORISSA.
Nearest Town : Talcher 26 KMs
Nearest Railway Station : Talcher 29 KMs
Nearest Airport : Bhubaneswar 180 KMs
INSTALLED CAPACITY
STAGE - I - 2 Units each 500 MW - Total 1000 MW
STAGE- II - 4 Units each 500 MW - Total 2000 MW
01. Site conditions to be assessed by the agency before quoting the tender. The debris generated from the plant will be disposed into the disposal yard.
02. Work is required to be done at Talcher Kaniha Plant.
03. Work is to be performed with specification, all required materials, man power, tools & plant and consumables are to be arranged by agency for completing it successfully within scheduled period.
04. Completion period of work: 12 months
05. Agency shall be solely responsible for the safety of the workmen. You shall provide all necessary
Safety equipments to the workmen.
06. Driver and required unskilled labourers for loading & unloading should be deployed by the agency
07. Fuel, consumables, insurance, etc. are in the scope of contractor
08. The payment will be made on the trip basis for transportation of cutting grass, debris and unwanted materials within a lead of 3 Km
09. Initially two tractors with trolley are to be deployed by the agency. In case of urgency of work, the agency will have to deploy more than two tractors with trolley (i.e. upto 05 nos.). If fails to deploy the required no. of tractor with trolley, in that case the additional tractor with trolley will be deployed by NTPC at the risk & cost of the agency.