Annexure-I

NTPC Limited

(A Government of India Enterprise)

Talcher Super Thermal Power Station

 

 

SALIENT TECHNICAL FEATURES

 

Sub : Deployment of tractor with trolley for transportation of unwanted materials inside plant.

 

SALIENT TECHNICAL FEATURES :

 

Talcher super Thermal power project is a Unit of NTPC, in Kaniha block under Talcher sub- division of Angul Dist of ORISSA.

 

Nearest Town                 :  Talcher 26 KMs

Nearest Railway Station   :  Talcher 29 KMs

Nearest Airport               :   Bhubaneswar 180 KMs

 

    INSTALLED CAPACITY

 

 STAGE - I   -     2 Units each 500 MW - Total 1000 MW

 STAGE- II   -     4 Units each 500 MW - Total 2000 MW

 

TECHNICAL FEATURES:

 

 01. Site conditions to be assessed by the agency before quoting the tender. The debris generated from the plant will be disposed into the disposal yard.

02. Work is required to be done at Talcher Kaniha Plant.

03. Work is to be performed with specification, all required materials, man power, tools & plant and consumables are to be arranged by agency for completing it successfully within scheduled period.

04. Completion period of work: 12 months

05. Agency shall be solely responsible for the safety of the workmen. You shall provide all necessary

Safety equipments to the workmen.

06. Driver and required unskilled labourers for loading & unloading should be deployed by the agency

07. Fuel, consumables, insurance, etc. are in the scope of contractor

08. The payment will be made on the trip basis for transportation of cutting grass, debris and unwanted materials within a lead of 3 Km

09. Initially two tractors with trolley are to be deployed by the agency. In case of urgency of work, the agency will have to deploy more than two tractors with trolley (i.e. upto 05 nos.). If fails to deploy the required no. of tractor with trolley, in that case the additional tractor with trolley will be deployed by NTPC at the risk & cost of the agency.