ANNEXURE-A

 

 

                                                 SALIENT TECHNICAL FEATURES

   

PLANT OVERVIEW

 

NTPC Talcher-Kaniha (TSTPS) plant is located in Kaniha block under Talcher sub-division of Angul district in the state of Orissa.

Nearest Town :                 Talcher 26 KMs

Nearest Railway Station : Talcher 29 KMs

Nearest Airport :                Bhubaneswar 180 KMs

 

INSTALLED CAPACITY

 

STAGE - I   -     2 Units  each 500 MW  - Total 1000 MW

 

STAGE- II   -     4 Units each  500 MW  - Total 2000 MW

 

EQUIPMENTS INVOLVED

 

Stage-I Boiler:- 2 X 500 MW ,Once Through Tower Type, Single pass boiler,

No second pass,

Maximum Height of Boiler:- 92 Mtr. Make:- Stein Industries, France,

Burners are installed in four corners of boiler from 23m EL to 35 M. Elevation. Each Burner block consists of 10 coal burners, 05 Oil burners & 21 SADC dampers & 02 nos of over fire dampers.       

Stage-II Boiler: - 4 X 500 MW, Circulation type two pass boiler with Drum.

Maximum Height of Boiler: - 85 Mtr. Make:- BHEL,

Burners are installed in four corners of boiler from 23m EL to 35 M. Elevation. Each Burner block consists of 10 coal burners ,05 Oil burners & 21 SADC dampers & 02 nos of Over fire dampers.           

 

 JOBS IN BRIEF

 

This contract is for dismantling the coal Nozzles in all four corners of the Boilers of 3 units and replacing with new or reconditioned nozzles. Job also involves the repair /reconditioning of the old nozzles and other jobs detailed in the scope of work.