DRY FLY ASH TRANSPORTATION SYSTEM PACKAGE FOR
TALCHER SUPER THERMAL POWER STATION, STAGE-I
(2X500 MW) & STAGE-II
(4X500 MW)
NTPC Ltd., New Delhi has set
up a
coal fired Thermal Power Station at Kaniha ( Talcher ) in Angul District of Odisha, for supplying power to cater to the needs of Eastern
Region and Southern Region and other interconnected grids. The station comprises s ix unit of
500 MW and hence, the total capacity of
the
plant as on date is 3000MW ( Stage-I comprises 2 units & Stage-II comprises 4 units
)
Site Locations and Approach
The site is bound by Tikra
Nadi towards North and West, villages Gadashila and Rangabera
and Brahmani River
towards east and NH-200
from Deogarh to Talcher towards south.
The average ground level
is much
higher
than the
maximum WL of
Samal reservoir which is RL + 79.5 m.
The nearest rail head is Talcher railway station of South Eastern Railway
at a distance of about 30 KM from the power station. The power station has Railway Siding of about 35 KM and is connected with the Talcher Railway station. The
power station is adjacent to NH-200 which runs from Talcher to Deogarh. The rail and road distances of the Power Station from the major cities are as follows:
--------------------------------------------------------------------------------------------
Station Distance in kms
Rail Access Road Access
--------------------------------------------------------------------------------------------
Angul ---- 50 kms
Bhubaneshwar 180 kms 180 kms
Calcutta 555 kms 494 kms
Sambalpur 198 kms 198 kms
New
Delhi 2211kms 1686 kms
1.01.01
The work shall
consist of mechanical and electrical work and equipment, all associated civil
and structural works, Controls and Instrumentation, mechanical services and pipe work and electrical services
associated with this dry fly ash transportation
system, the
principal features of this system being:
1.01.02
(i) For Stage-I (2X500MW)
(a)
A pressure type
dry fly ash transportation system for unit nos. #1, 2 for transporting the ash
from buffer hoppers near ESPs to silos including interfacial modification in
existing ash handling system.
(b)
Dry fly ash storage silos near plant boundary
and dry/moist unloading system.
(ii) For Stage-II (4X500MW)
(c)
A pressure type
dry fly ash transportation system for unit nos. #4, 5, 6 for transporting the
ash from existing buffer hoppers near ESPs to silos including interfacial
modification in existing ash handling system.
(d)
Dry fly ash
storage silos for Road/Rail loading and dry/moist unloading system.