Salient Features:-
‘Power Transformer Package’
covers design, engineering, manufacture, testing at works, short circuit
testing , transportation to site, receipt, handling and storage at site,
erection and commissioning of Transformers and inclusive of necessary tools and
tackles and supply of mandatory spares & Measuring kits and 5% extra
transformer oil. The bill of material is following:
|
Sr. No. |
Equipment
Name |
Rating |
Quantity |
|
1. |
Inter-Bus Transformer (IBT) |
200 MVA, 400/132/33 KV with OLTC (±10%) |
2 Nos. |
|
2. |
Measuring Kits |
|
|
|
|
On Line DGA Analyzer |
Online monitoring system of dissolved gases. (H2, CO,
C2H2 & C2H4) for IBT’s. |
2 Nos. |
|
3. |
Shifting of existing Bus Reactor (50 MVAR) within
switchyard along with erection and commissioning. |
1 No. |
|
|
4. |
Spare Trans. Oil (by vol.) |
As specified |
5% |
|
5. |
Mandatory Spares |
As specified |
LOT |