ANNEXURE-A
SALIENT TECHNICAL FEATURES
NTPC Talcher-Kaniha (TSTPS) plant is located in Kaniha block under Talcher
sub-division of Angul district in the state of
Orissa.
Nearest
Town: Talcher
26 KMs
Nearest
Railway Station: Talcher 29 KMs
Nearest
Airport: Bhubaneswar
180 KMs
STAGE -
I -
2 Units each 500 MW - Total 1000
MW
STAGE-
II -
4 Units each 500 MW - Total 2000
MW
EQUIPMENTS
INVOLVED
Stage-II Boiler:- 4 X 500 MW,
Circulation type two pass boiler with Drum.
Maximum
Height of Boiler:- 85 Mtr. Make:- BHEL,
Three
banks of economizer , Two banks of LTSH are arranged horizontally and
Divisional Panel, Platen Super heater, Reheater are
arranged vertically.
In
addition to main Boiler following equipments are included per unit:-
88
Nos of Wall Blower and 34 Nos
of LRSB per boiler. Boiler is equipped
with 16 nos Spring Loaded safety valves, 8 Electromatic
Relief valves .All Boiler valves except the control valves/Block valves are of
BHEL make and mostly are under size 150 Nb. Boiler Burner is having 40 coal
nozzles & 20 Oil guns. Piping hangers are of constant load, variable load
and rigid strut type hangers total approximately 300 nos
at different locations and elevations.
JOBS IN
BRIEF
Overhauling
of boiler Pr.parts involves boiler water washing and
erection of quick erect scaffolding inside furnace for complete inspection of
the furnace, erection of temporary platforms in the boiler,over
pendant coils at every two mtr of coils for accessing
various coils in reheater, LTSH terminal tubes,
screen tubes etc.Inspection and thickness survey of
coil tubes and water wall, tube replacement by TIG welding and radiography, fin
welding and shielding etc. Welding of tube joints with IBR approved and tested
HP welder. Alignment of misaligned coils by jacking, pulling, welding of
spacers and connectors etc.
Boiler
drum and bottom ring header internal removal, inspection and boxing up. Seal
plate and wire mesh inspection in bottom ash hopper and rectification of any
defect found there in .It also involves servicing of conventional valves,
safety valves, ERVs etc. Taking hot and cold reading of piping hangers and
rectification of any defects found there in.
It also calls for Licensin
with IBR inspector for repair order and licensing.
Safety
aspects during execution will be sole responsibility of the contractor and it
will be given prime importance. As multiple agency will be working during
overhauling handling of materials and manpower movement has to be taken care
off.
The
agency should have special class repairer licence
issued from CIB, Orissa throughout the period f contract