Corporate Identification Number: U40105DL2005 PTC138458 Page 63 of 88
Registered Office : NTPC Bhawan, Core-7, SCOPE Complex 7, Institutional Area, Lodi Road, New Delhi 110003
Noida Office : The Landmark, Second Floor, Plot No. A35, Sector 2, Noida-201301 (U.P), Tel: 0120- 4148900, Fax: 0120-4148913
Mumbai Office : Samruddhi Venture Park, 5th Floor, MIDC, Marol, Andheri (E), Mumbai - 400093. Tel: 022- 28216613, Fax: 022-28269057
Project Site : PO RGPPL Anjanwel, Taluka Guhagar, Distt. Ratnagiri (Maharashtra) 415634, Tel: 02359- 241073, Fax: 02359- 241118
Email : cs@rgppl.com (Noida Office), pr@rgppl.com (Mumbai Office), site.rgppl@gmail.com (Site office), Web Site: www.rgppl.com
Annexure-XXVI
GENERAL SAFETY OBLIGATION TO AGENCIES
1. Contractor has to arrange for all the safety equipments like safety shoes, Helmets, goggles, gloves, safety
belts etc required for safety of their workers working at site.
2. The contractor shall issue photo entry pass for their personnel to be deployed inside plant, which they shall
be required to display prominently during the period of their stay within the company premises.
3. The contractor shall obtain proper gate pass for entries and exists of all materials and equipments inside
the plant.
4. Liabilities for Safety at site shall be strict in the observance of the existing safety and accident prevention
regulations of RGPPL.
5. Contractor has to take special precaution to ensure that the personnel under his
control do not carry any combustible materials such as matchbox, cigarettes, etc.
Smoking is strictly prohibited inside plant premises.
6. The Contractor shall have the group insurance/Workman’s compensation policy for the working manpower
at site looking the scope of work and as per the statutory rules for the complete period of contract.
7. The Contractor shall ensure proper safety to all the workman, materials, plant and equipments belonging
either to him or to other agencies or to RGPPL at the Site.
8. The Contractor will notify well in advance to the Engineer-in-charge of his intention to bring to the site any
container filled with liquid or fuel or gas or explosive or petroleum substance which may involve chemical hazards,
The Engineer-in-Charge shall have the right to prescribe the terms and conditions under which such container is to
be handled and used during the performance of the works and the Contractor shall strictly adhere to and comply
with such instructions. The Engineer-in-Charge shall have the right at his sole discretion to inspect any such
container or such construction plant for which material in the container is required to be used and if in his opinion,
its use is not safe, he may forbid its use,
9. All equipments used in construction and direction by Contractor shall meet Indian/International standards
and where such standards do not exist, the Contractor shall ensure these to be absolutely safe. All equipments
shall be strictly operated and maintained in accordance with manufacturer's operation manual and safety
instructions and as per guidelines of RGPPL in this regard.
10. Periodical examinations and all tests for lifting/hoisting equipments and tackles shall be carried out in
accordance with the relevant provisions of factories Act. 1948, Indian Electricity Act. 1910 and other applicable
laws/rules in force from time to time. A register of examinations and tests shall be properly maintained and will be
promptly produced as and when desired by Engineer - in -Charge or by the person authorized by him.
11. The Contractor shall fully responsible for the safe storage of his and his sub-Contractor's radio-active source in
accordance with BAFO/DAE in connection with use storage and will be promptly taken by Contractor.
12. The Contractor shall provide suitable safety equipments of prescribed standard to all employees and workman
according to the need or as may be directed by Engineer-in-Charge who will also have right to examine these
safety equipments and determine their suitability, reliability, acceptability and adaptability.
13. Where explosives are to be used, the same shall be used under the direct control and supervision of an expert,
experienced, qualified and competent person strictly in accordance with the code or practices/rules framed
under Indian Explosives Act, pertaining to handling, storage and use of the explosives.
14. The Contractor shall provide safe working conditions to all workman and employees at the site including safe
means of access railing, stairs, ladders, scaffoldings, etc. The scaffoldings shall be erected under the control and
supervision of an experienced and competent person. For erection, good and standard quality of material shall be
used by the Contractor.
15. The Contractor shall not interfere or disturb electric, fuses, cables and other electrical equipments belonging to the
owner or other Contractor under any circumstances, whatsoever unless expressly permitted in writing by RGPPL
to handle such fuses, cables or electrical equipment.
16. No weight of any description will be imposed on any cable and no ladder or similar equipment shall rest against or
attached to it unless expressly permitted to do so by RGPPL.
17. No repair work shall be carried out on any live equipment. The equipment must be declared safer by engineer - in-
charge and a permit to work shall be issued by Engineer-in-Charge before any repair work is carried out. While
working on electric line/equipments whether alive or dead, suitable type and sufficient quantity of tools will have
to be provided by Contractor to electricians/workmen/officers.
18. The Contractor shall employ necessary number of qualified, full time electricians/ Electrical. Supervisors to
maintain his temporary electrical installations.
19. The Contractor employing more than 250 workmen, whether temporary, casual, probationer regular or permanent
or on contract, shall employ at least one full time exclusively as safety officer to supervise safety aspects of the
equipments and workman who will coordinate with the project safety officer. In case of work
being carried out through Sub-Contractor the sub-Contractor's workman/employees will also be taken in to
account as for the Contractors workman/employees, purpose of observing safety precautions and appointing
safety officer. The name and address of such safety officer or Contractor will be promptly informed in writing to
Engineer - in - Charge with a copy to project safety officer-in-Charge