6.0 Qualifying Requirements:
1.0 Technical Criteria
1.1 The bidder should be a manufacturer or an authorized dealer/ an authorized channel partner of
manufacturer of Split Air Conditioners.
1.2 The Bidder should have executed order(s) for “Supply of split air conditioners” with executed order
values as detailed below in the preceding seven (7) years; reckoned as on date of techno commercial bid
opening:
Single order of value not less than Rs. 46.73 Lakhs. OR
Two order s of value not less than Rs. 29.21 Lakhs each. OR
Three orders of value not less than Rs. 23.36 Lakhs each.
2.0 Financial Criteria:
2.1 The average annual turnover of the bidder, in the preceding three (03) financial years; reckoned as on
the date of techno-commercial bid opening shall not be less than Rs. 58.41 Lakhs (Rupees Fifty Eight Lakhs
and Forty One thousand only).
3.0 Notes:
a) In case where audited results for the last financial year as on the date of techno-commercial bid opening
are not available, the financial results certified by a practicing Chartered Accountant shall be considered
acceptable. In case, Bidder is not able to submit the Certificate from practicing Chartered Accountant
certifying its financial parameters, the audited results of three consecutive financial years preceding the last
financial year shall be considered for evaluating the financial parameters. Further, a certificate would be
required from the CEO/CFO/Proprietor/Partner that the financial results of the Company are under audit as
on the date of techno-commercial bid opening and the certificate from practicing Chartered Accountant
certifying the financial parameters is not available.
b) For the purpose of arriving at the executed value of supply specified at 1.2 above, basic amount only shall
be considered. In case of a contract inclusive of Taxes, agency has to provide the break-up of basic value and
tax.
c) Other income shall not be considered for arriving at annual turnover.
d) The value of the supply completed in the preceding seven (07) years reckoned as on date of techno
commercial bid opening, even if it has been started earlier, will only be considered for establishing the
qualifying requirements.
e) The word “executed” at 1.2 means; bidder should have achieved the criteria specified in above QR even if
the total contract is not completed / closed.
f) The bidder should submit the documentary proof for establishing the QR requirements at 1.0 and 2.0
above.
7.0 Notwithstanding anything stated above, the Employer reserves the right to undertake a
physical assessment of the capacity and capabilities including financial capacity and capability of
the Bidder / his Collaborator(s) / Associate(s) / Subsidiary(ies) / Group Company(ies) to perform