e) Compl
ete manufacturing including shop testing/type testing;
f) The complete Civil, structural and architectural works as specified in Section-VI, PART-A, Sub-
section-IID.
g) Packing and transportation from the manufacturer’s works to the site including logistic studies,
insurance, customs clearance & port clearance, port charges, if any.
h) Receipt, storage, preservation, handling and conservation of equipment at the site;
i) Fabrication, pre-assembly, if any, erection, insurance, testing, commissioning and completion of
facilities including putting into satisfactory operation all the equipment including successful
completion of initial operation;
j) Performance and guarantee tests Along with initial operation;
k) Supply of spares on FOR site basis;
l) Reconciliation with Customs Authorities;
m) Satisfactory conclusion of the Contract;
n) Insurance and other requirements
Detailed scope of work has been specified in the bidding documents.
EPC Package for Lara Super Thermal Power Project Stage-II (2x800 MW)
Design, Engineering, Manufacture, Supply, Construction, Erection, Testing & Commissioning works on
the basis of single point responsibility, completely covering the following activities and services in
respect of Steam Generator, Steam Turbine Generator, Air Cooled Condenser (ACC), Electrostatic
Precipitator, NOx Control System, Flue Gas Desulphurization, Compressed air (instrument & service air)
system ,air conditioning & ventilation system for all buildings under Bidder’s scope of work ,fire detection
& protection System for entire power plant , 400KV GIS and all electrical systems , complete Control &
Instrumentation, and complete Civil, Structural and Architectural works and Rooftop Solar PV Plants at
buildings covered under the specifications:
a) Basic Engineering of the plant including preparation of Plant Definition Manuals;
b) Detailed design of all the equipment and equipment system(s) including civil, structure steel &
Architectural works included in bidder's scope.
c) Providing engineering drawings, equipment sizing & performance data, instruction manuals, as
built drawings and other information;
d) Compliance with statutory requirements and obtaining clearances from statutory authorities,
wherever required;
e) Complete manufacturing including shop testing/type testing;
f) The complete Civil, structural and architectural works as specified in Section-VI, PART-A, Sub-
section-IID.
g) Packing and transportation from the manufacturer’s works to the site including logistic studies,
insurance, customs clearance & port clearance, port charges, if any.
h) Receipt, storage, preservation, handling and conservation of equipment at the site;
i) Fabrication, pre-assembly, if any, erection, insurance, testing, commissioning and completion of
facilities including putting into satisfactory operation all the equipment including successful
completion of initial operation;
j) Performance and guarantee tests Along with initial operation;
k) Supply of spares on FOR site basis;
l) Reconciliation with Customs Authorities;
m) Satisfactory conclusion of the Contract;
n) Insurance and other requirements