Page 3 of 4
Accountant certifying its financial parameters, the audited results for the three consecutive financial
years preceding the last financial year shall be considered for evaluating the financial parameters.
Further, a Certificate would be required from the CEOICFO as per the format enclosed in the bidding
documents stating that the Financial results of the Company are under audit as on the date of
Techno-commercial bid opening and the Certificate from the practising Chartered Accountant
certifying the financial parameters is not available.
NOTES FOR CLAUSE 2 ABOVE:
(i) Other income shall not be considered for arriving at annual turnover.
(ii) "Holding Company" and "Subsidiary" shall have the meaning ascribed to them as per Companies
Act of India.
(iii) For Turnover indicated in foreign currency, the exchange rate as on seven (07) days prior to the
date of techno-commercial bid opening shall be used.
4.0 Brief scope of Supply:
CEMENT : TYPE : IS:1489 part-1 {PACKING(KG) : 50KG}
1. Inspection of Cement will be done at site as per IS:1489 part-1.
2. You have to submit Test Certificate containing 28 days and 07 days compressive strength both. SRV
will be cleared based on the test certificate having 07 days compressive strength, however, payment
shall be made based on 28 days test report. The Test report should indicate fineness, normal
consistency, initial & final setting time, soundness and comprehensive strength. However, NTPC shall
be free to check the quality of cement as and when desired. If necessary, PDI at the discretion of
NTPC may be carried out at your works for which advance intimation will be given to you for making
necessary arrangement/readiness.
3. In case of any quality complaint, joint sampling and testing shall be done at
NCCBM Ballabhagarh. Inspection charges at NCCBM Ballabhagarh shall be in
vendor's account. The sample shall be drawn in the presence of vendor's as well
as NTPC's representative. If the results still do not conform to the specifications,
entire lot shall be replaced by the vendor at no extra cost.
4. The delivery of cement may be taken as under (tentative):-
In the same month as placement of PO - 1100 MT
Till 1st month from placement of PO - 1100 MT
Till 2nd month from placement of PO - 500 MT
Till 3rd month from placement of PO - 300 MT
Notes:
• Overall quantity variation: allowed +/-5%
• Weighment at NTPC end will be final for accountal purpose.
• Unloading of Cement at NTPC's Central store/ project site is in vendor's Scope.
Above specification is for indication only and not complete specification. Bidders are requested to
refer detailed technical specification in our tender documents.
“Bidders are requested to refer detailed technical specification of the item (s). In case of any
contradiction between short text of item(s) and complete technical specification of the item(s), ONLY