vi. Value means basic value of the PO. Where PO value is
composite (i.e. including Service taxes etc.), the applicant
has to give break-up of composite PO
basic value, taxes etc. Any separate re-imbursement/
escalation shall not be considered.
Documents to be submitted :
In addition to the documents required in support of meeting technical requirements as stated
above, following document
s are required to be submitted by the applicants applying for
enlistment:-
a. Audited balance sheets including Profit & Loss statements for the previous three completed
financial years reckoned from the date of application. In case the audited documents are not
ready / available, then certified copy by a registered practicing Chartered accountant may be
submitted.
b. NSIC / SSI / MSME registration certificate, if any.
c. PF and GST registration certificates.
d. Any other documents in addition to the above which the applicant wants to submit.
Special Terms and Conditions:
A. Evaluation Criteria: (As per QR)
No. of capital overhauls specifying cylinders (HP/IP/LP), Make, design, MW Rating,
Type (Having stationery blades directly fitted into casing or stationery blades fitted in
Diaphragms), P.O. Copies and Work completion certificates, Capacity up gradation,
Annual Turn over etc
B. Work completion certificates issued from
Turbine Manufacturer/OEM/SEB/Utility/
Employer Company should mention that “The job has been completed successfully”
OR “There is no adverse report on execution of work” for the specific PO for which
work completion issued. Separate certificate issued by
above authorities specifying
the quality of work shall also be accepted. If r
equired, NTPC may seek
clarification/feedback from the employer/utility related to credential of the
applicant/service provider.
C. The job carried out as mentioned in QR within a specific period means that the job
must have been started and completed within the period for overhauling of turbines.
In case of erection of complete turbine, the date of start of job may be earlier to the
beginning date of period under consideration but the erection must be complete on
or before last date of period.
D. The bidder should have carried out the erection of turbine means that the unit has
been synchronized to the grid. (First time synchronization shall also be considered as
erection)
E. PF document is mandatory for enlistment.
F. No fee is required to be paid for enlistment. No
off line application would be
entertained by NTPC.
G.
In the process of vendor enlistment, NTPC may seek additional information/
clarification and vendor must be ready to furnish promptly any such information, so
asked for.
H. Any contractor currently under BIFR or banned / blacklisted on Pan NTPC basis shall
not be considered for enlistment. However, such vendors may be considered for
enlistment only after expiry of the banning / blacklisting period. If any vendor is
debarred / banned in participating any tender originating from any particular station/
region of NTPC shall continue to remain debarred/banned for that station/ region
even after enlistment on PAN NTPC basis, till expiry of period or else banning order is
revoked by concerned station/ region.
I. The cutoff date for submission of completed application as mentioned in this