5.0 Brief Scope of Work & other specific detail
As per Section-V Scope of Work
6.0 Prospective bidders from U.P. State are compulsorily required to provide TIN number at the time of purchase of bidding
documents.
7.0 Qualifying Requirements for Bidders:
The bidders are required to fulfil the following:
2.1. The bidder should have executed Contract of Structural Steel fabrication in erection or maintenance works or both in a thermal
power plant having units of 200 MW or above.
2.2. The bidder should have successfully executed Contract(s) of #Structural Steel fabrication and erection/maintenance works in any
thermal power plant having units of 200 MW or above# of following values, during last Seven (07) years as on date of bid opening
in:
(a) Single Contract of value not less than INR 47.00 Lakhs
OR
(b) Two Contracts of value not less than INR 30.00 Lakhs each
OR
(c) Three Contracts of value not less than INR 24.00 Lakhs each
2.3. The average annual financial turnover of the Bidder during the preceding Three (03) financial years as on the date of bid opening
shall not be less than INR 59 Lakhs (Rupees Fifty Nine Lakhs only).
2.4. In case where audited results for the last financial year as on the date of bid opening are not available, the financial results
certified by a practicing Chartered Accountant shall be considered acceptable. In case, Bidder is not able to submit the Certificate from
practicing Chartered Accountant certifying its financial parameters, the audited results of three consecutive financial years preceding
the last financial year shall be considered for evaluating the financial parameters. Further, a Certificate would be required from the
CEO/ CFO as per the format enclosed in the bidding documents stating that the Financial Results of the Company are under audit as
on the date of Techno-commercial bid opening and the Certificate from the practicing Chartered Accountant certifying the financial
parameters is not available.
Notes:
1) Other Income shall not be considered for arriving at annual turnover.
2) The word #executed# means that the bidder should have achieved the criteria specified in the above Qualifying Requirements
within preceding seven (07) years period, even if the contract has been started earlier and/ or is not completed/ closed.
8.0 Issuance of Bidding Documents to any bidder shall not construe that bidder is considered qualified.
9.0 NTPC reserves the right to reject any or all bids or cancel/withdraw the NIT for the subject package without assigning any
reason whatsoever and in such case no bidder/intending bidder shall have any claim arising out of such action.
10.0 Address for Communication
AGM (C&M)/ Dy. Manager (C&M)
NTPC Limited
Mouda Super Thermal Power Project
PO Mouda, Nagpur # 441104
Tel: 07115-281176/281052
FAX: 07115-281223
E-mail: ilaanand@ntpc.co.in / rgbhaskarwar@ntpc.co.in /subodhshankar@ntpc.co.in
Websites: https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart or www.ntpctender.com or www.ntpc.co.in