(ABRIDGED INVITATION FOR EXPRESSION OF INTEREST)
EXPRESSION OF INTEREST (EOI) FOR IDENTIFYING VENDORS FOR SETTING UP OF
WASTE TO ENERGY PLANTS (PAN INDIA) ON EPC BASIS
12. Operation & maintenance of WtE Plant along with electrical equipments, consumables and spare
parts for a period of five years from the date of successful completion of trial run including disposal
of ash and rejects (if any) to nearby landfill, identified for this purpose.
13. Supply, erection and commissioning of fire fighting systems, CCTV cameras and its network inside
the plant, wherever required for its safe and reliable operation.
14. All necessary control and instrumentation system, human machine interface (HMI), control logics,
protection and interlocks ensuring safe and reliable operation of waste to energy project.
15. Detailed design of all the equipment and equipment system(s) including all control and
instrumentation, electrical, civil, structure steel works included in bidder's scope.
16. Compliance with statutory requirements and obtaining clearances from statutory
authorities, wherever required. (This includes IBR approvals and registration of plant,
explosive authority's approval, Consent to Establish, Consent to Operate, approval from electrical
inspector, factory inspector, approval for excise and custom duty waiver etc. if any)
17. Complete manufacturing including shop testing/type testing where applicable;
18. Packing and transportation from the manufacturer’s works to the site including customs clearance
& port clearance, port charges, if any.
19. Receipt, unloading, storage, preservation, handling and conservation of equipment at the site.
20. Fabrication, pre-assembly if any, erection of equipments, site & shop testing, completion of
facilities, commissioning and successful operation of complete system and individual equipments.
21. Performance and guarantee tests after successful completion of initial operation.
22. Spares: Supply of mandatory spares, start-up and commissioning spares, recommended spares
and other spares as required for complete system erection, testing, commissioning, start-up, initial
operation etc. at site.
23. Operation & Maintenance of plant including supply of manpower, machineries, T&P, consumables,
spares etc. for initial period of five year as described above; in case of lube oil or any other specific
consumables, top up requirement for 2 years shall be supplied.
24. Reconciliation with customs authorities, in case of foreign Bidders.
25. Complete as built documentation and O&M manual.
26. Satisfactory conclusion of the contract.