NTPC Limited
(A Government of India Enterprise)
WRHQ II
NOTICE INVITING TENDER (NIT)
FOR
MGR & OTHER ALLIED TRACK MAINTENANCE WORKS, NTPC KORBA
(Domestic Competitive Bidding)
NIT No: 40051153 Date:28.01.2016
1.0 NTPC invites
hereinafter: |
|
|
2.0 |
Brief Details |
|
|
|
|
NIT No. |
40051153 |
|
NIT Date |
28.01.2016 |
|
Document Sale Commencement Date & Time |
28.01.2016 15:40:13 |
|
Document Sale Close Date & Time |
19.02.2016 18:30:00 |
|
Source of IFB/NIT |
WRHQ II |
|
Contract Classification |
Works Contract |
|
Last Date and Time for Bid submission |
03.03.2016 15:30:00 |
|
Technical Opening Date & Time |
03.03.2016 16:00:00 |
|
Bid Opening Date & Time |
11.03.2016 16:00:00 |
|
Cost of Bidding Documents in INR |
2,400.00 |
|
EMD in INR |
288000.00 |
|
|
||
Last |
Query Date (if any) |
26.02.2016 |
3.0Bid Security and Integrity Pact (if applicable) shall be submitted in a sealed envelope separately offline by the
stipulated bid |
submission closing |
date and time at the address given below. Any bid without an acceptable Bid Security |
and Integrity |
Pact (if applicable) |
shall be treated as |
4.0 A complete set of Bidding Documents may be downloaded by any interested Bidder on payment
(https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart). For logging on to the SRM Site, the |
bidder would require |
||
vendor code and SRM user id and password which can be obtained |
by submitting a questionnaire |
available at our SRM |
|
site as well as at NTPC tender site (www.ntpctender.com). First time users not |
allotted any vendor code are required to |
||
approach NTPC at least three working days prior to Document Sale |
Close date |
alongwith duly filled in questionnare for |
|
issue of vendor code and SRM user id/password. |
|
|
|
5.0Brief Scope of Work & other specific detail
5.1The scope work includes attending to various track maintenance jobs, such as preventive maintenance, attending to
defects/ general complaints/ emergency/breakdown works as and when needed, attending to associated components like points and crossing, curves, level crossings, and bridges etc. in the awarded track length. The scope of work further includes renewal/ recoupement of rails, sleepers, and track fittings etc., overhauling of track and its associated parts such as points and crossings, level crossings etc. The scope also includes daily through checking of entire length of track
including points and crossings, level crossings |
bridges etc. by |
foot from one end to other by keyman |
and |
|
all |
other |
jobs |
|||||||||||||||||
as per IR specifications and as per annual Programme of track maintenance. |
|
|
|
|
|
|
|
|
|
|
|
|
||||||||||||
5.2 Track Maintenance of MGR system of KSTPS comprises |
of 36 KM of track on |
the PSC |
layout, SWR |
track |
with |
|||||||||||||||||||
signaling system. It has exchange yard (with railways) of |
7 |
|
Km |
track |
length on |
steel sleepers. About 6KM Track |
||||||||||||||||||
length of |
MGR |
complex |
and 3Km |
of Track |
|
length |
for |
HFO |
siding |
inside |
plant |
areas |
also |
to be |
||||||||||
maintained |
including any |
other |
track |
inside |
the |
plant as |
per |
the |
requirements . MGR Track |
has |
got |
42% of |
curves |
|||||||||||
and 8 major bridges and 51 minor bridges. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
5.3 The scope of work includes: - |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
a. Regular track maintenance works involved round the year |
as |
per |
Indian |
Railway |
standard |
norms |
and |
specifications |
||||||||||||||||
(Item Rate |
Basis). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. Furnishing the services of various categories of manpower required |
for |
|
incidental and emergency works |
|
and items |
not |
||||||||||||||||||
covered in |
as |
attending |
to derailments and |
other |
eventualities, |
security |
patrolling, |
attending |
soil |
|
erosion |
|||||||||||||
(e.g. rain cuts etc), upkeep of fouling marks, Engg. display |
boards, |
curve |
boards, gateposts |
etc. |
repair |
to |
bridges, |
|||||||||||||||||
attending ballast less track, store |
handling, collection/return |
of |
material to central stores and other |
miscellaneous |
works. |
|||||||||||||||||||
c.Attending to allied works of track maintenance such as earthwork etc. for |
repair of |
formation, |
rain cuts |
etc. |
|
|
|
|
||||||||||||||||
d. Special track maintenance items other than the regular track |
maintenance |
items. |
|
|
|
|
|
|
|
|
|
|
||||||||||||
5.4 NTPC shall provide all permanent way spares like rails sleepers, points and crossing |
materials |
and |
fittings & |
|||||||||||||||||||||
fastenings required for causal |
renewals/replacement |
etc free |
of |
cost. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
6.0 Prospective bidders from U.P. State are compulsorily required to provide TIN number at the time of purchase of bidding documents.
7.0Qualifying Requirements for Bidders:
The bidders are required to fulfil the following.
7.1Technical Criteria: The bidder should have executed the work of laying/maintenance of railway track/siding of Indian Railway / Konkan Railway / Public Sector / State Govt. / Private Sector during the last seven (07) years ending with the last date of the month preceeding the month of publication of NIT in either of the following:
(a)Single order of value not less than Rs.115 Lakhs [Rupees One Hundred Fifteen Lakhs].
or
(b)Two orders of value not less than Rs. 72 Lakhs [Rupees Seventy Two Lakhs] each.
or
(c) Three orders of value not less than 58 Lakhs [Rupees Fifty Eight Lakhs] each.
The work executed means the bidder should have achieved the criterion |
specified in |
the above QR, even if |
the total |
contract is not completed/closed. In case of contracts under execution as |
on last date |
of the month preceding |
the month |
of publication of NIT, the value of work |
executed |
till |
such date |
will |
be considered provided |
the same is |
certified by |
the |
|
employer. |
|
|
|
|
|
|
|
|
|
7.2 Financial Criteria: The average annual |
turnover |
of |
the |
bidder |
in the preceding three (3) financial years as on the last |
||||
date of the month preceding the month |
of publication of |
NIT |
shall |
not be less than Rs. |
143.90 Lakhs |
[Rupees |
One |
||
Hundred Forty Three Lakhs Ninety Thousand Only].
(i)While computing the annual turnover, other income shall not be considered.
(ii)In case where audited results for the last financial year as on the date of Techno commercial bid opening are not
available, the |
financial |
results |
certified by |
a practicing Chartered Accountant shall be considered acceptable. In case, |
bidder is not |
able to |
submit |
the certificate |
from practicing chartered accountant certifying its financial parameters, the |
audited results of three consecutive financial years preceding the last financial year shall be considered for evaluating the financial parameters. Further, a certificate would be required from the CEO / CFO as per the format enclosed in the bidding documents, stating that the financial results of the company are under audit as on the date of
bid opening and the certificate from the practicing Chartered Accountant certifying the financial parameters is not available.
7.3 The Bidder shall have to submit the following documents in support of meetinf the QR along with their bid:
7.3.1 |
The Bidder to submit documentary support in support of Clause 7.1 of QR. |
|
7.3.2 |
Copies |
of audited balance sheet and profit & loss account for the preceding three financial years in support of |
clause 7.2 of |
QR. |
|
7.4 |
Notwithstanding anything stated above, the Employer reserves the right to undertake a physical assessment of capacity |
|||
and |
capabilities including financial capacity and |
capability of the Bidder / his collaborator(s) / associate(s) / subsidiary(ies) |
||
/ group company (ies) to perform the contract, |
should the circumstances warrant such assessment in the overall interest of |
|||
the Employer. |
|
|
||
7.5 |
The physical assessment shall include but |
not |
be limited to the assessment of the office/facilities/banker#s/reference |
|
works |
by Employer. A negative determination |
of |
such assessment of capacity and capabilities may result in the rejection |
|
of the |
bid. |
|
|
|
8.0Issuance of Bidding Documents to any bidder shall not construe that bidder is considered qualified.
9.0NTPC reserves the right to reject any or all bids or cancel/withdraw the NIT for the subject package without
assigning any reason whatsoever and in such case no bidder/intending bidder shall have any claim arising out of such action.
10.0 Address for Communication
GM (C&M)/Sr. Manager (C&M), NTPC Limited,
Western
4th Floor, Magneto Offizo, Labhandi,
G E Road, Raipur (C.G.) India, Pin # 492001 Tel. No.:
Fax No.:
Note: No hard copy of Bidding Documents shall be issued
11.0 As per provisions of bidding documents, the bidders shall submit online,
12.0 The date of opening of Price Proposal shall be intimated separately by NTPC after completion of evaluation of
13.0 All the bids must be accompanied by Bid Security for an amount equivalent to Rs. 2,88,000.00 (Rupees Two Lakhs Eighty Eight Thousand only). ANY BID NOT ACCOMPANIED BY AN ACCEPTABLE BID SECURITY IN A SEPARATE SEALED ENVELOPE SHALL BE REJECTED BY NTPC AS BEING
14.0Benefits to Micro & Small Scale Industries
a) Micro and Small Enterprises (MSEs) registered with District Industries Centres or Khadi and Village Industries
Commission or Khadi and Village Industries Board or |
Coir Board or National Small |
Industries |
Corporation or Directorate |
|||||||||||||||
of Handicrafts and |
Handloom or |
any other body specified by Ministry of Micro, Small and |
Medium Enterprises as per |
|||||||||||||||
MSMED Act 2006, for goods produced and services |
rendered, shall |
be |
issued |
the |
bidding documents free of cost and |
|||||||||||||
shall |
be |
exempted |
from paying Earnest Money Deposit. Such parties |
can |
sent |
the |
request for Tender Documents along |
|||||||||||
with |
a |
photocopy |
of valid registration certificate preferably attested |
by |
Gazetted |
Officer/ |
Ist |
Class |
Magistrate/ |
|||||||||
notarised, |
giving |
details |
such |
as |
validity, stores |
and monetary |
limits, failing |
which they |
run |
the |
risk |
of |
their bid |
|||||
being passed over as ineligible for this concession. |
|
|
|
|
|
|
|
|
|
|
|
|||||||
b) Small Scale Industries registered with NSIC shall be exempted from payment of |
Security Deposit |
up |
to |
the |
monetary |
|||||||||||||
limit |
for |
which the |
unit is |
registered |
with NSIC. |
|
|
|
|
|
|
|
|
|
|
|
||
c) Tenderers seeking exemption should enclose a photocopy of valid Registration Certificate giving details such as |
validity, |
|
stores and monetary |
limits to the Package Coordinator / GM (C&M) at the address given below at least three |
working |
days prior to the last |
date of tender fee payment for getting the authorization for participating in the |
|
15.0 Initial steps for participating in our
Type of Vendor »
Required Document for viewing our tender document
Vendors already having SRM Vendor Code and Password » |
|
|
|||||||
Before download/ viewing the tender document, |
bidder has |
to pay requisite tender fee either through payment gate |
way |
||||||
by |
clicking |
on |
#pay tender |
fee# |
after |
login in |
our SRM site or send D/D to us directly, which should reach us at |
least |
|
three working days prior to Last Date of Tender Fee Payment. |
|
||||||||
Vendors already having SAP Vendor Code, but does not have SRM login ID and Password » |
|
||||||||
1. |
Duly filled |
should reach us at least five working days prior to Last Date of Tender |
|||||||
Fee Payment. |
|
|
|
|
|
|
|
||
2. |
Before download/ viewing the tender document, bidder has to pay requisite tender fee either through payment gate way |
||||||||
by |
clicking |
on |
#pay tender |
fee# |
after |
login in |
our SRM site or send D/D to us directly, which should reach us at |
least |
|
five working days prior to |
Last |
Date |
of Tender Free Payment. |
|
|||||
New Vendor neither having any vendor code in SAP |
|
|
|||||||
nor any SRM login ID and Password » |
|
|
|
||||||
1. |
Duly filled |
card scanned / photo copy (Self Attested) along with |
the |
||||||
detailed address should reach us at least seven working days |
prior to Las Date of Tender Fee Payment. |
|
|||||||
2. |
Before download/ viewing the tender document, bidder has to pay requisite tender fee either through payment gate way |
||||||||
by |
clicking |
on |
#pay tender |
fee# |
after |
login in |
our SRM site or send D/D to us directly, which should reach us at |
least |
|
seven working days prior to Last Date of Tender Fee Payment. |
|
||||||||
Note: |
|
|
|
|
|
|
|
|
|
1. |
The agency can login |
||||||||
agency can reach our |
|
||||||||
https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart |
|
|
|||||||
They can also reach our |
|
||||||||
2. |
Digital |
Certificate (Class |
III) |
is a |
must for |
vendors to |
participate in this tender. For further details regarding |
this |
|
please visit #GUIDELINES TO BIDDERS# in NTPC
16.0 Transfer of Bidding Documents purchased by one intending bidder to another is not permissible. NTPC takes no responsibility for any
Websites: https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart or www.ntpctender.com or www.ntpc.co.in