NTPC Limited
(A Government of India Enterprise)
Bongaigaon Thermal Power Project
NOTICE INVITING TENDER (NIT)
FOR
SUPPLY INSTALLATION, TESTING & COMMISSIONING OF 02 NOS.OF
TRANSFORMERS FOR CONTINGENT MUPH SCHEME AT NTPC, BONGAIGAON.
(Domestic Competitive Bidding)
NIT No: 40045554 |
Date:24.09.2015 |
Bidding Document No: |
BGTPP/C&M/PUR/554 |
1.0 NTPC invites
2.0 |
Brief Details |
|
|
NIT No. |
40045554 |
|
|
NIT Date |
24.09.2015 |
|
|
Document Sale Commencement Date & Time |
24.09.2015 |
15:23:57 |
|
Document Sale Close Date & Time |
26.10.2015 17:00:00 |
||
Source of IFB/NIT |
Bongaigaon Thermal Power Project |
||
Contract Classification |
Equipment |
Supply & Erection |
|
Last Date and Time for Bid submission |
16.11.2015 10:30:00 |
||
Technical Opening Date & Time |
16.11.2015 11:00:00 |
||
Bid Opening Date & Time |
20.11.2015 11:00:00 |
||
Cost of Bidding Documents in INR |
1,125.00 |
|
|
EMD in INR |
82000.00 |
|
|
|
|
||
Last |
Query Date (if any) |
06.11.2015 |
|
3.0Bid Security and Integrity Pact (if applicable) shall be submitted in a sealed envelope separately offline by the
stipulated bid |
submission closing |
date and time at the address given below. Any bid without an acceptable Bid Security |
and Integrity |
Pact (if applicable) |
shall be treated as |
4.0 A complete set of Bidding Documents may be downloaded by any interested Bidder on payment
(https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart). For logging on to the SRM Site, the |
bidder would require |
||
vendor code and SRM user id and password which can be obtained |
by submitting a questionnaire |
available at our SRM |
|
site as well as at NTPC tender site (www.ntpctender.com). First time users not |
allotted any vendor code are required to |
||
approach NTPC at least three working days prior to Document Sale |
Close date |
alongwith duly filled in questionnare for |
|
issue of vendor code and SRM user id/password. |
|
|
|
5.0Brief Scope of Work & other specific detail
Supply, Installation, Testing and Commissioning |
of 02 Nos.1.0MVA Transformers at Champamati river bank. |
||||
Transformers have to be delivered at BGTPP, NTPC Ltd, |
|||||
with NTPC |
for |
testing of transformers shall |
be |
provided. However, |
any other instrument required may have to be |
arranged by |
the |
party. |
|
|
|
SALIENT TECHNICAL FEATURES: |
|
|
|
||
STANDARD APPLICABLE: IS: 2026 / IEC: 60076 |
|
|
|||
KVA : 1000 |
|
|
|
|
|
VOLTS AT NO LOAD HV: 6600 |
|
|
|
||
LV: 433 |
|
|
|
|
|
AMPERES HV: 87.48 |
|
|
|
||
LV: 1333.37 |
|
|
|
|
|
PHASES: 3 |
|
|
|
|
|
MAX TEMP RISE OF OIL OVER 50 degree C |
AMBIENT: 50 degree C |
||||
MAX TEMP RISE OF WDG OVER 50 degree C |
AMBIENT: 55 degree C |
||||
WINDING MATERIAL: COPPER |
|
|
|
||
COOLING: ONAN |
|
|
|
||
FREQUENCY: 50HZ |
|
|
|
||
VECTOR GROUP: Dyn1 |
|
|
|
||
TAP CHANGER: OCTC (5%) |
|
|
|
||
6.0 Prospective bidders from U.P. State are compulsorily required to provide TIN number at the time of purchase of bidding documents.
7.0 Qualifying Requirements for Bidders:
Qualifying Requirements:
The bidder who wishes to participate in the bidding shall satisfactorily establish that they fulfill the following qualifying requirements:-
6.1The bidder must be a manufacturer of #1 MVA, 6.6/0.433 KV capacity Transformer and above# having their manufacturing facility in India.
6.2The vendor must have in house testing facility for #1 MVA,6.6/0.433 KV capacity Transformer and above# as per relevant IS.
6.3The bidder should have successfully executed the work of #Supply of transformers of capacity 1 MVA, 6.6/0.433KV and above during the last seven (7) years, as on the date of bid opening, either of the following :-
One order valuing not less than Rs. 32.61 Lacs. OR
Two orders valuing not less than Rs. 20.38 Lacs each. OR
Three orders valuing not less than Rs. 16.30 Lacs each.
6.4 Financial criteria: The average annual financial turnover of the bidder |
in the preceding (03) |
years |
as |
on |
the date of |
|||
bid opening shall be not less than Rs. 40.76 Lacs. |
|
|
|
|
|
|
|
|
NOTE: |
|
|
|
|
|
|
|
|
(i) Other income shall not be considered for arriving at annual turnover. |
|
|
|
|
|
|||
(ii) The word #executed# means that the |
bidder should have |
achieved |
the |
progress specified in the QR at |
para 6.3 even |
|||
if the total order is not completed/closed. |
The same shall be |
supported |
by |
documentary evidence |
issued |
by |
the |
owner. |
(iii)The bidder shall submit documentary evidence/proof of meeting qualifying requirements stipulated above.
(iv)In case where audited result for the last financial year as on the date of techno commercial bid opening are not
available, the |
financial result certified by a practicing Chartered |
Accountant shall be considered acceptable. In case bidder |
is not able to |
submit the certificate from practicing chartered |
accountant certifying his financial parameters, the audited |
result of three consecutive financial years preceding the last financial year shall be considered for evaluating the financial parameter.
8.0Issuance of Bidding Documents to any bidder shall not construe that bidder is considered qualified.
9.0NTPC reserves the right to reject any or all bids or cancel/withdraw the NIT for the subject package without
assigning any reason whatsoever and in such case no bidder/intending bidder shall have any claim arising out of such action.
10.0Address for Communication
Add.General Manager (C&M)
NTPC LTD (BgTPP), Administrative Building PO: Salakati, District. Kokrajhar
Assam
TEL NO.
EMAIL IDS: hemasunderteja@ntpc.co.in amitabhasutradhar@ntpc.co.in krmondal@ntpc.co.in
Websites: https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart or www.ntpctender.com or www.ntpc.co.in