1.0 INTRODUCTION:
NTPC intends to set up wind energy projects at various power stations having wind potential. NTPC presently has 24 Coal based stations, 8 combined cycle gas/liquid fuel based stations and 1 Hydro based station, besides many thermal, hydro and solar projects are under construction. The list and locations of these plants has been attached in detailed documents provided under this EOI.
The Expression of Interest is invited from interested parties, who are willing to work with NTPC for identification of sites (at NTPC’s existing stations) where wind energy projects can be set up and which are economically viable. The assignment will cover the desktop studies based on the available information and data in public domain and shortlist the projects where wind farms can be set up and for such
Report is to be prepared which will cover wind resource assessment, wind data processing, selection of machines,
Through this EOI, NTPC intends to collect data regarding the capacity and capability of the Agencies to prepare Detailed Project Report (DPR) for development of Wind Power
Projects. This invitation for Expression of Interest is not intended for empanelment or pre qualification of Agencies.
2.0 SUBMISSION OF EOI
Agencies are required to submit the information as mentioned below in their EOI by
07/08/2015. The details should be submitted in the prescribed formats along with supporting documents.
a.Covering letter from the company on its letterhead.
b.
c.
d.
e.
You may note that NTPC reserves the right to modify or annul the process without assigning any reason whatsoever solely at its own discretion.
3.0 INTERACTION WITH AGENCIES
Subsequent to last date of submission of EOI by the Agencies, NTPC may interact with those Agencies who have submitted their Expression of Interest for subject work for further clarifications/feedback.
4.0 SIGNATURE & SUBMISSION
Agencies may download the EOI document free of cost from www.ntpctender.com and submit their application on or before 07.08.2015 on their Letter Head along with the required information in original along with a soft copy of the same in the form of CD in a sealed cover super scribing “Expression Of Interest (EOI) Preparation of Detailed Project
Report (DPR) for Development of Wind Power Projects at NTPC Stations in India”, at the address given below.
Addl General Manager (Renewable
NTPC Limited, Room No. 220, 2nd Floor, Engineering Office Complex Annexe,
Email: akgupta01@ntpc.co.in / mkjha@ntpc.co.in
The application may also be submitted only in soft copy through email.
LIST OF NTPC POWER STATIONS/PROJECTS
The details of NTPC coal based power stations are as follows:
|
Sr. |
|
|
COAL |
BASED |
|
Address |
|
|
|
|
STATE |
|
|
||||
|
|
|
|
|
|
|
|
|
|
|||||||||
|
No. |
|
|
(Owned by NTPC) |
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. |
|
|
Singrauli |
|
|
P.O. |
|
Uttar Pradesh |
|
|||||||||
|
|
|
|
|
|
|
|
Uttar Pradesh |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
2. |
|
|
|
Korba |
|
|
P.O. Vikas Bhawan, |
|
Chhattisgarh |
|
|
||||||
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
Korba, Chattisgarh |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
|
|
Ramagundam |
P.O. Jyothinagar,Dist. Karim |
|
Telangana |
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
4. |
|
|
|
Farakka |
|
|
P.O. |
|
West Bengal |
|
|
||||||
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. |
|
|
Vindhyachal |
|
|
P.O. |
|
Madhya |
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pradesh |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
6. |
|
|
|
Rihand |
|
|
P.O. |
|
Uttar Pradesh |
|
|
||||||
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. |
|
|
Kahalgaon |
|
|
P.O. Kahalgaon - 813214, Dist. Bhagalpur |
|
Bihar |
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
8. |
|
|
|
Dadri |
|
|
008,Dist. |
|
Uttar Pradesh |
|
|
||||||
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
Gautambudhnagar, |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9. |
|
|
Talcher Kaniha |
P.O. Deepshikha |
|
Odisha |
|
|||||||||||
|
|
|
|
|
|
|
|
Angul |
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
10. |
|
|
|
Feroze |
Gandhi, |
|
P.O. Unchahar, Dist. Rai Bareilly - 229406 |
|
Uttar Pradesh |
|
|
||||||
|
|
|
|
|
|
|
|
|||||||||||
|
|
|
|
|
Unchahar |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11. |
|
|
|
Talcher Thermal |
P.O. Talcher Thermal Dist. |
|
Odisha |
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
12. |
|
|
|
Simhadri |
|
|
P.O. |
020, |
Dist. |
|
Andhra |
|
|
||||
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
Vishakhapatnam |
|
|
|
Pradesh |
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
13. |
|
|
Tanda |
|
|
P.O. Vidyutnagar, Dist. Ambedkarnagar |
|
Uttar Pradesh |
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
14. |
|
|
|
Badarpur |
|
|
Badarpur,New Delhi – 110 044 |
|
|
Delhi |
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
15. |
|
|
Sipat |
|
|
P.O. Ujjwal Nagar, Sipat, Distirct – Bilaspur - |
|
Chhattisgarh |
|
|||||||||
|
|
|
|
|
|
|
|
495555 |
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
16. |
|
|
|
Mauda |
|
|
|
Maharashtra |
|
|
|||||||
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
Nagpur 441104 |
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17. |
|
|
|
Barh |
|
|
P.O. NTPC Barh, Distt. Patna |
|
Bihar |
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
18. |
|
|
|
Bongiagaon |
|
|
P.O. Salakati, Distt. Kokrajhar |
|
Assam |
|
|
||||||
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coal Based Joint Ventures: |
|
|
|
|
|
|
|
|
|
|
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
Sr. |
|
|
COAL |
BASED |
|
Address |
|
|
|
|
|
STATE |
|
||||
|
|
|
|
|
|
|
|
|
||||||||||
|
No. |
|
|
(Owned by JVs) |
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. |
|
Durgapur |
|
|
|
|
|
|
West Bengal |
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
2 |
|
|
Rourkela |
|
|
|
|
|
Odisha |
|
|||||||
|
|
|
|
|
|
|
|
|
|
Rourkela, |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
|
|
Bhilai |
|
|
|
Chhattisgarh |
||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|
4 |
|
|
Kanti |
|
|
|
Muzzafarpur Thermal Power Station, P.O. |
Bihar |
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Kanti Thermal, Distt. |
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
|
|
IGSTPP, Jhajjar |
|
Indira Gandhi STPP, Jharli, Distt. Jhajjar- |
Haryana |
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
124141 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
6 |
|
|
Vallur |
|
|
|
Vallur |
Thermal |
Power |
Project: |
P.O. |
Tamil Nadu |
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
Vellivoyal Chavadi, Ponneri Taluk, Chennai- |
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
600103 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The details of NTPC gas based power stations are as follows |
|
|
|
|||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
Sr. |
|
|
GAS BASED |
|
Address |
|
|
|
|
|
STATE |
|
||||||
|
|
|
|
|
|
|
|
|
|
||||||||||
|
No. |
|
|
(Owned by NTPC) |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. |
|
|
Anta |
|
|
P.O. Anta, Dist. |
|
Rajasthan |
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
2. |
|
|
Auraiya |
|
|
P.O. Dibiyapur, Dist. |
Uttar Pradesh |
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Pradesh |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
|
Kawas |
|
|
P.O. Aditya Nagar,Dist. Surat |
Gujarat |
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
516,Gujarat |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
4. |
|
|
Dadri |
|
|
Vidyut |
Uttar Pradesh |
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Gautam budhnagar, Uttar Pradesh |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. |
|
P.O. Urja Nagar, Dist. Bharuch, Gujarat – 392 |
Gujarat |
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
215 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
6. |
|
|
Rajiv |
Gandhi |
|
P.O. Choolatheruvu, Dist. |
Kerala |
|
||||||||||
|
|
|
|
CCPP |
|
|
506,Kerala |
|
|
|
|
|
|
||||||
|
|
|
|
Kayamkulam |
|
|
|
|
|
|
|
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. |
|
Faridabad |
|
|
Village |
– |
Mujedi,P.O. |
Neemka, |
Dist. |
Haryana |
|||||||||
|
|
|
|
|
|
|
|
|
|
|
Faridabad,Haryana |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
Gas Based Joint Ventures: |
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
Sr. No. |
|
|
COAL |
BASED |
|
Address |
|
|
|
|
|
STATE |
|
|||||
|
|
|
|
|
|
|
|
|
|
||||||||||
|
|
|
|
|
|
|
(Owned by JVs) |
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. |
|
|
|
|
RGPPL |
|
|
Post |
Maharashtra |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
Ratnagiri |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
|
The details of NTPC Hydro Based Power Projects |
|
|
|
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
|
Sr. No. |
|
|
HYDRO |
|
|
Address |
|
|
|
|
|
STATE |
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|||||||||
|
|
|
|
|
|
|
|
BASED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. |
|
|
|
|
|
|
Koldam (HEPP) |
P.O. – Barmana, District – Bilaspur, |
Himachal |
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pradesh |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FORMAT OF COVERING LETTER
(to be submitted by the party on the Company’s Letter Head)
Addl General Manager (Renewable
NTPC Limited, Room No. 220, 2nd Floor, Engineering Office Complex Annexe,
(Agency to Provide Date and reference)
Dear Sir,
Sub: EXPRESSION OF INTEREST (EOI) FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR DEVELOPMENT OF WIND POWER PROJECTS AT NTPC STATIONS IN INDIA
We, the undersigned, express our interest for the subject EOI and declare the following:
(a)We are duly authorized to represent and act on behalf of _____________ (name of the
Agency).
(b)We have examined and have no reservations to the EOI document including Amendment No(s) & Clarification No(s)_________ (if any).
(c)With reference to your invitation for EOI dated 07/07/2015, we are furnishing herewith all the required details as per the prescribed formats.
(d)NTPC and /or its authorized representatives are hereby authorized to conduct any inquiries or investigations to verify the statements, documents and information submitted in connection with this application, and to seek clarifications from our bankers and clients. This letter of Application will also serve as authorization for any individual or authorized representative of any institution referred to in the supporting information, to provide such information deemed necessary and as requested by NTPC.
(e)NTPC and /or its authorized representatives may contact the following nodal persons for further information on any aspects of the application:
Contact Person
Name and Address for Communication Telephone No Email ID designation
(f)This application is made in the full understanding that:
1.Through this EOI, NTPC intends to only identify the probable Agencies in India who have experience in executing the contracts of similar nature and that this invitation for Expression of Interest is not intended for empanelment or pre qualification of Agencies.
2.EOI process will be subject to verification of all information submitted at the discretion of NTPC.
3.NTPC reserves the right to reject or accept any or all applications, cancel the EOI process without any obligation to inform the Agency about the grounds of same.
(g)We declare that we have read and abide by the provisions of Fraud Prevention Policy of NTPC and submit the form of Acceptance of Fraud Prevention Policy duly filled in Employer’s format.
(h)The undersigned declare that the statements made and the information provided in the duly completed application are complete, true and correct in every detail.
Name |
: |
In the Capacity of |
: |
Signed |
|
Duly authorized to sign the application for and on behalf of:
Date:
SCHEDULE – 1
Page 1 of 1
EXPRESSION OF INTEREST (EOI) FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR DEVELOPMENT OF WIND POWER PROJECTS AT NTPC STATIONS IN INDIA
Company Profile and Organization Structure
Name of the Company:
Registered Address:
Contact Person & Designation:
Postal address for communication:
Telephone No.:
Fax No.:
Mobile No.:
Documents regarding Organization Structure and Ownership including Certificate of Incorporation and Memorandum of Association are enclosed.
Signature:_________________________
Name:____________________________
Designation:_______________________
Company Seal: ____________________
SCHEDULE – 2
Page 1 of 1
EXPRESSION OF INTEREST (EOI) FOR PREPARATION OF DETAILED PROJECTREPORT (DPR) FOR DEVELOPMENT OF WIND POWER PROJECTS AT NTPC STATIONS IN INDIA
TECHNICAL QUALIFICATIONS/CAPABILITIES
List of consultancy work and preparation of DPR* for Wind Power Plant executed during the last 5 financial years
Sl |
Project Location, |
Time |
Date of |
Date |
of |
Approx. |
Scope of Work |
REMARKS |
||
no |
Capacity, |
Name |
Schedule |
Award |
Completion |
Contract |
|
|
|
|
|
of Client |
starting |
|
|
|
|
Value |
|
|
|
|
with the |
highest |
|
|
|
|
|
|
|
|
|
plant capacity |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Define whether the scope of work includes: |
|
|
|
|
|
|
|
|
|
|
• |
Wind Resource assessment |
|
|
|
|
|
|
|
|
|
• |
Wind data processing. |
|
|
|
|
|
|
|
|
|
• Selection of machine and Micro‐siting. |
|
|
|
|
|
|
|
|
|
|
• Techno‐economic analysis. |
|
|
|
|
|
|
|
|
|
|
• |
Implementation plan. |
|
|
|
|
|
|
|
|
|
• Preparation of Detailed Project Report. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Vendor should enclose client certificate and/or copy of Letter of Award in respect of above.
SCHEDULE – 3
Page 1 of 1
EXPRESSION OF INTEREST (EOI) FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR DEVELOPMENT OF WIND POWER PROJECTS AT NTPC STATIONS IN INDIA
(FORM FOR ACCEPTANCE OF FRAUD PREVENTION POLICY)
Vendor’s Name and Address |
To, |
Addl General Manager (Renewable
Dear Sirs,
We have read the contents of Fraud Prevention Policy of NTPC displayed on its tender website http://www.ntpctender.com and undertake that we shall strictly abide by the provisions of Fraud Prevention Policy of NTPC.
Yours faithfully
Date: |
Signature:_________________________ |
Place: |
Name:____________________________ |
|
Designation:_______________________ |
|
Company Seal: ____________________ |
SCHEDULE – 4
Page 1 of 1
EXPRESSION OF INTEREST (EOI) FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR DEVELOPMENT OF WIND POWER PROJECTS AT NTPC STATIONS IN INDIA
(ANY OTHER INFORMATION)
Additional Information relevant to the work / assignment is enclosed.
Signature:_________________________
Name:____________________________
Designation: _______________________
Company Seal: ___________________