CONSULTANCY WING
EXPRESSION OF INTEREST (EOI)
For Empanelment of Agencies.
EOI No.: |
Dated: |
19.03.2015 |
|
EOI is invited from agencies having experience in carrying out Energy Audit and Performance Assessment in large utilities and own the instruments/equipments for the same. Scope of work, list of instruments, qualifying requirement and application format are detailed in the bid document.
Through this EOI Consultancy Wing intends to empanel suitable agencies for carrying out performance testing, technical audit, gap analysis and performance optimization of power and other energy intensive utilities. RFQ will be sent to empanelled agencies on case to case basis as and when there is a need for such assignments.
Last date of submission of EOI is 16.04.2015.
Address for communication: Dy. General Manager (C&M),
Consultancy Wing, NTPC Ltd.
Room No.205, EOC Annexe,
For detailed conditions, interested parties may refer to our web site www.ntpctender.com or may contact DGM(C&M) CW on phone no.01204947323/Mobile No. 9650998040/Fax No.01202410645.
Annex- 1: Scope of work
1.Complete mobilization of instruments and manpower at client site for performance testing and energy audit of large power and energy intensive utilities.
2.The scope includes transportation to client sites, installation of requisite instruments at specified locations at client sites for data collection, collating of data at single point for further analysis and processing.
3.The scope includes mobilization of adequate skilled manpower capable of installation of instruments and data collection at client facility and coordination with concerned officials.
4.The test instruments should meet the specified standards for Performance testing of Boiler,
Turbine and other Auxiliaries, Electrical Energy audit etc and should have valid calibration on the date of testing.
5.Continuous data collection from the instruments through data loggers and providing the data in soft formats.
6.Demobilization of instruments after completion of test.
S.No |
Name of instrument |
Range |
Accuracy |
Numbers |
Category |
|
|
|
|
|
|
1. |
Data Logger 60 Channel |
|
0.03 % |
2 |
D |
|
|
|
|
|
|
2. |
Barometer |
|
0.02 % FS |
1 |
D |
|
|
|
|
|
|
3. |
|
0.5 oC |
2 |
M |
|
|
thermometer |
|
|
|
|
|
|
|
|
|
|
4. |
Armored Thermocouple |
|
0.4 % |
160 |
D |
|
|
|
|
|
|
|
|
|
|
|
|
5. |
Flue Gas Analyzer o2, |
|
O2: 0.2 %,m |
2 |
D |
|
CO2,Co and NOx |
|
|
|
|
|
|
CO:6 PPM, |
|
|
|
|
|
|
|
|
|
|
|
|
NOx: 1% of FS |
|
|
|
|
|
|
|
|
6. |
Portable flue gas |
|
O2: 2 % of FS |
2 |
M |
|
Analyser |
|
|
|
|
|
|
|
|
|
|
7. |
Vacuum Pump |
|
|
2 |
D |
|
|
|
|
|
|
8. |
SS probe |
|
|
1.5 m to 4m |
M |
|
|
|
|
|
|
9. |
Flexible hose |
|
10 m |
20 |
D |
|
(temperature resistant) |
|
|
|
|
|
|
|
|
|
|
10. |
Bubbling Chamber |
|
15 lts |
4 |
D |
|
|
|
|
|
|
11. |
Compensation cable |
|
30 mtrs |
160 |
D |
|
|
|
|
|
|
12. |
Pyrometer |
|
1 |
D |
|
|
|
|
2000 oC) |
|
|
|
|
|
|
|
|
13. |
Dirty Pitot (Dirty Air Flow |
|
|
1 |
D |
|
Test) with manometer |
|
|
|
|
|
|
|
|
|
|
14. |
Digital manomater |
|
|
1 |
D |
|
|
|
|
|
|
15. |
Rotary PF sampler |
|
|
1 |
D |
|
|
|
|
|
|
16. |
|
|
1 |
D |
|
|
Clean Air Test with |
|
|
|
|
|
|
|
|
|
|
S.No |
Name of instrument |
Range |
Accuracy |
Numbers |
Category |
|
|
|
|
|
|
|
Manometer |
|
|
|
|
|
|
|
|
|
|
17. |
|
|
1 |
D |
|
|
measurement) |
|
|
|
|
|
|
|
|
|
|
18. |
Calibration cylinders for |
|
|
1 |
D |
|
O2 |
|
|
|
|
|
|
|
|
|
|
19. |
Calibration cylinders for |
|
|
1 |
D |
|
CO |
|
|
|
|
|
|
|
|
|
|
S. No |
Instrument |
RANGE |
ACCURACY |
Numbers |
Category |
|
|
|
|
|
|
1. |
3 Ph Power analyser |
0.2 |
02 |
D |
|
|
|||||
|
|
|
|
|
|
|
|
input from |
|
|
|
|
|
CT & PT |
|
|
|
|
|
|
|
|
|
2. |
3 Phase AC/DC clamp |
750 V, |
0.5 % |
3 |
D |
|
|||||
|
on power meter with |
1000 A |
|
|
|
|
current transformer |
|
|
|
|
|
|
|
|
|
|
3. |
Power transducer |
10 |
D |
||
|
|||||
|
|
8 |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
4. |
Thermo couples |
0 - 600 |
0.5 oC |
20 |
D |
|
|
|
|
|
|
5. |
RTDs for temperature |
0 - 400 |
0.5 oC |
40 |
D |
|
measurement |
|
|
|
|
|
|
|
|
|
|
6. |
RTDs for temperature |
0 – 200 |
0.1 oC |
12 |
D |
|
|||||
|
measurement. |
|
|
|
|
|
|
|
|
|
|
7. |
Pressure transmitters |
0.075 |
10 |
D |
|
|
|||||
|
|
|
|
|
|
8. |
Pressure transmitters |
0.075 |
20 |
D |
|
|
|
|
|
|
|
9. |
Pressure transmitters |
0.075 |
05 |
D |
|
|
|
|
|
|
|
10. |
Pressure transmitters |
0.075 |
10 |
D |
|
|
|||||
|
|
|
|
|
|
S.No |
Name of instrument |
Range |
|
Accuracy |
Numbers |
Category |
|
|
|
|
|
|
|
11. |
Absolute pressure TX |
0.05 |
10 |
D |
||
|
||||||
|
|
|
|
|
|
|
12. |
Diff Pressure TX |
0.05 |
6 |
D |
||
|
|
|
|
|
|
|
13. |
Ultrasonic flow meters |
1 % |
02 |
D |
||
|
||||||
|
|
velocity |
|
|
|
|
|
|
|
|
|
|
|
14. P |
Pitot tubes |
1.5 to 3m |
|
02 |
D |
|
|
|
|||||
|
|
|
|
|
|
|
15. |
Mechanically aspirated |
|
|
0.1 Deg C |
02 |
D |
|
psychrometer |
|
|
|
|
|
|
|
|
|
|
|
|
16. |
Anemometer |
|
|
|
01 |
D |
|
|
|
|
|
|
|
17. |
Barometer |
0.075 |
01 |
D |
||
|
||||||
|
|
|
|
|
|
|
18. |
Lux meter |
|
2 |
D |
||
|
|
|||||
|
|
lux |
|
|
|
|
|
|
|
|
|
|
|
19. L |
Lead wire |
|
|
|
5000m |
D |
|
|
|
|
|||
|
|
|
|
|
|
|
20. |
24 V constant volt |
|
|
|
04 |
D |
|
|
|
|
|||
|
supply |
|
|
|
|
|
|
|
|
|
|
|
|
21. |
Non contact type |
|
01 |
D |
||
|
|
|||||
|
stroboscope |
RPM |
|
|
|
|
|
|
|
|
|
|
|
22. |
|
|
o |
|
01 |
|
Non contact type IR |
|
D |
||||
|
|
|||||
|
temperature indicator |
|
|
|
|
|
|
|
|
|
|
|
|
D: Desirable, M: Mandatory
A:General Requirement: Should be a registered company in India
B:Technical requirement:
|
QR |
Submission requirement |
1. |
Agency preferably should have all mandatory |
List of instruments with |
|
instruments and at least 50% of the listed desirable |
accuracy and make. Sample |
|
instruments. They must submit documentary proof of the |
latest calibration certificate of |
|
same. |
Instruments |
|
|
|
2. |
Agency must have senior personnel with total |
CV of senior personnel |
|
professional experience of more than 15 year. |
|
|
|
|
3. |
Key qualified person with minimum of 5 year experience |
List of employed persons and |
|
in the field of energy audit and performance assessment. |
qualification and certification |
|
Agency should have atleast one qualified BEE Auditor. |
on experience. In case of BEE |
|
|
qualified Energy Auditor BEE |
|
|
number |
4. |
Agency should have a proven track record of carrying out |
Copy of Purchase order |
|
energy audit and performance assessment in large |
|
|
utilities. Must have completed atleast 3 project during |
|
|
last 3 year of cumulative value of Rs 10 Lakhs or more. |
|
PROPOSAL FOR EMPANELMENT OF AGENCIES FOR PERFORMANCE TESTING AND ENERGY AUDIT OF LARGE UTILITIES: Application format
A.General requirement : Details of organization
B.Technical requirement
S.No |
Name of instrument |
Accuracy |
Numbers |
Compliance |
|
|
|
|
Yes/No |
|
|
|
|
|
1. |
Data Logger 60 Channel |
0.03 % |
2 |
|
|
|
|
|
|
2. |
Barometer |
0.02 % FS |
1 |
|
|
|
|
|
|
3. |
0.5 oC |
2 |
|
|
|
thermometer |
|
|
|
|
|
|
|
|
4. |
Armored Thermocouple |
0.4 % |
160 |
|
|
|
|
|
|
|
|
|
|
|
5. |
Flue Gas Analyzer o2, |
O2: 0.2 %,m |
2 |
|
|
CO2,Co and NOx |
|
|
|
|
CO:6 PPM, |
|
|
|
|
|
|
|
|
|
|
NOx: 1% of FS |
|
|
|
|
|
|
|
6. |
Portable flue gas |
O2: 2 % of FS |
2 |
|
|
Analyser |
|
|
|
|
|
|
|
|
7. |
Vacuum Pump |
|
2 |
|
|
|
|
|
|
8. |
SS probe |
|
1.5 m to 4m |
|
|
|
|
nos |
|
|
|
|
|
|
9. |
Flexible hose |
10 m |
20 |
|
|
(temperature resistant) |
|
|
|
|
|
|
|
|
10. |
Bubbling Chamber |
15 lts |
4 |
|
|
|
|
|
|
11. |
Compensation cable |
30 mtrs |
160 |
|
|
|
|
|
|
12. |
Pyrometer |
1 |
|
|
|
|
|
|
|
S.No |
Name of instrument |
Accuracy |
Numbers |
Compliance |
|
|
|
|
Yes/No |
|
|
|
|
|
|
|
2000 oC) |
|
|
|
|
|
|
|
13. |
Dirty Pitot (Dirty Air Flow |
|
1 |
|
|
Test) with manometer |
|
|
|
|
|
|
|
|
14. |
Digital manomater |
|
1 |
|
|
|
|
|
|
15. |
Rotary PF sampler |
|
1 |
|
|
|
|
|
|
16. |
|
1 |
|
|
|
Clean Air Test with |
|
|
|
|
Manometer |
|
|
|
|
|
|
|
|
17. |
|
1 |
|
|
|
measurement) |
|
|
|
|
|
|
|
|
18. |
Calibration cylinders for |
|
1 |
|
|
O2 |
|
|
|
|
|
|
|
|
19. |
Calibration cylinders for |
|
1 |
|
|
CO |
|
|
|
|
|
|
|
|
23. |
3 Ph Power analyser |
0.2 |
02 |
|
|
|
|
|
|
24. |
3 Phase AC/DC clamp |
0.5 % |
3 |
|
|
|
|||
|
on power meter with |
|
|
|
|
current transformer |
|
|
|
|
|
|
|
|
25. |
Power transducer |
10 |
|
|
|
|
|||
|
|
8 |
|
|
|
|
|
|
|
26. |
Thermo couples |
0.5 oC |
20 |
|
|
|
|
|
|
27. |
RTDs for temperature |
0.5 oC |
40 |
|
|
measurement |
|
|
|
|
|
|
|
|
28. |
RTDs for temperature |
0.1 oC |
12 |
|
|
measurement. |
|
|
|
|
|
|
|
|
29. |
Pressure transmitters |
0.075 |
10 |
D |
|
||||
|
|
|
|
|
S.No |
Name of instrument |
Accuracy |
Numbers |
Compliance |
|
|
|
|
Yes/No |
|
|
|
|
|
30. |
Pressure transmitters |
0.075 |
20 |
|
|
|
|
|
|
31. |
Pressure transmitters |
0.075 |
05 |
|
|
|
|
|
|
32. |
Pressure transmitters |
0.075 |
10 |
|
|
|
|
|
|
33. |
Absolute pressure TX |
0.05 |
10 |
|
|
|
|
|
|
34. |
Diff Pressure TX |
0.05 |
6 |
|
|
|
|
|
|
35. |
Ultrasonic flow meters |
1 % |
02 |
|
|
|
|
|
|
36. |
Pitot tubes |
|
02 |
|
|
|
|
|
|
37. |
Mechanically aspirated |
0.1 Deg C |
02 |
|
|
psychrometer |
|
|
|
|
|
|
|
|
38. |
Anemometer |
|
01 |
|
|
|
|
|
|
39. |
Barometer |
0.075 |
01 |
|
|
|
|
|
|
40. |
Lux meter |
|
2 |
|
|
|
|
||
|
|
|
|
|
41. L |
Lead wire |
|
5000m |
|
|
|
|
||
|
|
|
|
|
42. |
24 V constant volt |
|
04 |
|
|
|
|
||
|
supply |
|
|
|
|
|
|
|
|
43. |
Non contact type |
|
01 |
|
|
|
|
||
|
stroboscope |
|
|
|
|
|
|
|
|
44. |
Non contact type IR |
|
01 |
|
|
|
|
||
|
temperature indicator |
|
|
|
|
|
|
|
|
S.NO. |
Name of expert and |
Similar Experience |
BEE Energy Auditor/Manager Yes/No |
|
Qualifications |
|
|
|
|
|
|
1 |
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
Provide here details of similar assignments completed since the year 2012
Using the format below, provide information on each Assignment/job for which your firm, and each partner in the case of consortium or joint venture, was legally contracted either individually as a corporate entity or as one of the major partners within an association, for carrying out similar assignment/job.
S.No. |
Description |
Details |
|
|
|
1. |
Firm's Name |
|
|
|
|
2. |
Assignment/Job Name |
|
|
|
|
3. |
Description of assignment |
|
|
|
|
4. |
Approx, value of the contract (in Rupees) |
|
|
|
|
5. |
Country / Location |
|
|
|
|
6. |
Duration of Assignment/Job in Months |
|
|
|
|
7. |
Name and Address |
|
|
|
|
8. |
Total No of |
|
|
|
|
9. |
Start Date (month/year) |
|
|
|
|
10. |
Completion Date (month/year) |
|
|
|
|
11. |
Name of associated Consultants, if any |
|
|
|
|
Note: Please provide Documentary evidence from the client i.e. copy of work order, contract for each of above mentioned assignment when invited to make a presentation. The experience will not be considered for evaluation if such requisite support documents are not provided