NTPC Limited
(A Government of India Enterprise)
Korba Super Thermal Power
NOTICE INVITING TENDER (NIT)
FOR
MGR & OTHER ALLIED TRACKS MAINTENANCE WORKS FOR THE YEAR
(Domestic Competitive Bidding)
NIT No: 40027428 |
Date:07.11.2014 |
Bidding Document No: |
KS/CS/O&M/143106 |
1.0 NTPC invites
2.0 |
Brief Details |
|
NIT No. |
40027428 |
|
NIT Date |
07.11.2014 |
|
Document Sale Commencement Date & Time |
07.11.2014 09:43:53 |
|
Document Sale Close Date & Time |
25.11.2014 17:00:00 |
|
Source of IFB/NIT |
Korba Super Thermal Power |
|
Contract Classification |
Services |
|
Last Date and Time for Bid submission |
26.12.2014 10:00:00 |
|
Technical Opening Date & Time |
26.12.2014 10:30:00 |
|
Bid Opening Date & Time |
29.12.2014 10:30:00 |
|
Cost of Bidding Documents in INR |
2,500.00 |
|
EMD in INR |
275000.00 |
|
|
||
Last |
Query Date (if any) |
06.12.2014 |
3.0Bid Security and Integrity Pact (if applicable) shall be submitted in a sealed envelope separately offline by the
stipulated bid |
submission closing |
date and time at the address given below. Any bid without an acceptable Bid Security |
and Integrity |
Pact (if applicable) |
shall be treated as |
4.0 A complete set of Bidding Documents may be downloaded by any interested Bidder on payment
(https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart). For logging on to the SRM Site, the |
bidder would require |
||
vendor code and SRM user id and password which can be obtained |
by submitting a questionnaire |
available at our SRM |
|
site as well as at NTPC tender site (www.ntpctender.com). First time users not |
allotted any vendor code are required to |
||
approach NTPC at least three working days prior to Document Sale |
Close date |
alongwith duly filled in questionnare for |
|
issue of vendor code and SRM user id/password. |
|
|
|
5.0Brief Scope of Work & other specific detail
1.0GENERAL
1.1The works to be done shall confirm to the detailed specifications here under, scope of work as described & further
details as per the schedule |
of |
quantities and |
instructions |
of |
If there is |
any dispute |
about the |
scope |
|||||||||||||
of |
work, the |
decision |
of |
shall be final and binding on the Contractor. |
|
|
|
|
|
|
|
||||||||||
1.2 |
Every Tenderer is expected to know the nature and location |
of |
work |
before quoting |
rates. |
Rates |
once |
quoted |
|||||||||||||
cannot be increased under any circumstances |
due to any |
reason whatsoever. |
It |
is to be |
noted that no |
extra |
charges |
will |
|||||||||||||
be |
paid for |
leads & |
lifts |
in |
the course of |
for any other reason over and above |
accepted |
rates |
|||||||||||||
on |
the plea that contractor has found later that he has misjudged the |
quantum of work of leads or lifts. |
|
|
|
|
|
||||||||||||||
1.3 |
The quantities given in the schedule of quantities are indicative and approximate only and may vary according to the |
||||||||||||||||||||
actual requirements. The contractor shall have no extra claim in this regard. |
|
|
|
|
|
|
|
|
|
|
|||||||||||
1.4 |
The contractor has to inspect the site of work; stores etc., and satisfy himself before submitting the tender. |
|
|
|
|||||||||||||||||
1.5 |
The quantities mentioned in Bid Proposal |
Sheet are approx. only and may vary and |
are |
intended |
for |
the |
information |
||||||||||||||
and guidance |
of contractors and payment shall be |
made |
on actual |
work done basis. |
|
|
|
|
|
|
|
|
|||||||||
1.6 |
The scope of work shall also includes all such materials, items |
and |
services |
which |
are |
not specifically mentioned |
in |
||||||||||||||
the |
tender documents but which are essential |
for |
successful completion |
of work, |
unless |
otherwise specifically |
excluded |
in |
|||||||||||||
the |
tender |
documents. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0SCOPE OF WORK:
2.1The scope work includes attending to various track maintenance jobs, such as preventive maintenance, attending to
defects/ |
general complaints/ |
|
emergency/breakdown |
works as and |
when needed, attending |
to |
associated |
components like |
|||||||||||||||||||
points and crossing, curves, level crossings, and bridges etc. in the |
awarded |
track |
length. |
The |
scope |
of |
work further |
||||||||||||||||||||
includes |
renewal/ recoupement of |
rails, |
sleepers, |
and |
track |
fittings etc., |
overhauling |
of track and its associated parts |
|||||||||||||||||||
such as |
points and crossings, level crossings etc. |
The |
scope |
also |
includes |
daily |
through |
checking of |
entire |
length |
of |
||||||||||||||||
track including points and crossings, level |
crossings |
bridges |
etc. by |
foot |
from |
one end |
to |
other |
by keyman |
and |
all |
other |
|||||||||||||||
jobs as |
per IR specifications and as per annual Programme of |
track |
maintenance. |
|
|
|
|
|
|
|
|
|
|
|
|||||||||||||
2.2 Track Maintenance of MGR system of KSTPS comprises |
of 36 KM of track on the PSC |
layout, |
SWR track |
with |
|||||||||||||||||||||||
signaling |
system. It has exchange yard (with railways) of |
7 |
Km |
track length on |
|
steel sleepers. About 6KM Track |
|||||||||||||||||||||
length of MGR |
complex |
and 3Km |
of |
Track |
|
length |
for |
HFO |
siding |
inside |
plant |
areas also to |
be |
||||||||||||||
maintained including any |
other |
track |
inside the |
plant |
as |
per |
the |
requirements |
. |
MGR |
Track |
has |
got 42% |
of |
|||||||||||||
curves and 8 major bridges and 51 minor bridges. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||
2.3 The scope of work includes: - |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
a. Regular track maintenance works involved round the year |
as |
per Indian |
Railway |
standard |
norms and |
specifications |
|||||||||||||||||||||
(Item Rate Basis). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b. Furnishing the services of various categories of manpower required for |
incidental |
and |
emergency works and |
items |
not |
||||||||||||||||||||||
covered |
in |
|
attending |
to |
derailments |
and other |
eventualities, |
security |
patrolling, |
attending |
soil erosion |
||||||||||||||||
(e.g. rain cuts etc), upkeep of fouling marks, Engg. display |
boards, |
curve |
boards, |
gateposts etc. repair to bridges, |
|||||||||||||||||||||||
attending |
ballast less track, |
store |
handling, collection/return |
of |
material to |
central stores |
and |
other |
miscellaneous works. |
||||||||||||||||||
c. Attending to allied works of track maintenance such as earthwork |
etc. for |
repair |
of |
formation, |
rain cuts |
etc. |
|
|
|
||||||||||||||||||
d. Special track maintenance items other than the regular track |
maintenance |
items. |
|
|
|
|
|
|
|
|
|
|
|
||||||||||||||
2.4 NTPC shall provide all permanent way spares like rails sleepers, points and crossing |
materials and fittings |
& |
|||||||||||||||||||||||||
fastenings required for causal |
renewals/replacement |
etc free |
of |
cost. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||||||
6.0 Prospective bidders from U.P. State are compulsorily required to provide TIN number at the time of purchase of bidding documents.
7.0Qualifying Requirements for Bidders:
QUALIFYING REQUIREMENTS [QR]:
1.0 The bidder should have experience in laying/maintenance of Railway Track. The bidder should have executed the laying/maintenance of Track work with the Indian Railways on trunk route or on main line or have done laying/track maintenance works of Public Sector siding/State Govt. or Private track maintenance, handling railway rake during the
last seven (07) years ending with the last date of the month preceding the month of publication of NIT in:
a)Single order of value not less than Rs. 110 Lakh [Rupees One Hundred Ten Lakh].
or
b)Two order of value not less than Rs. 69 Lakh [Rupees Sixty Nine Lakh] each.
or
c) Three order of value not less than Rs. 55 Lakh [Rupees Fifty Five Lakh] each.
The work / order executed means the bidder should have achieved the |
criterion specified in the QR, |
even if the total |
||
contract is not |
completed/closed. In case of contracts under execution as |
on last date of the month preceding the month |
||
of |
publication |
of NIT, the value of work executed till such date will be |
considered provided the same |
is certified by the |
employer. |
|
|
|
|
1.1 |
Financial |
Criteria |
|
|
The average annual turnover of the bidder in the preceding three (3) financial years as on the last date of the month preceding the month of publication of NIT shall not be less than Rs.137.36 Lakh (Rupees One Hundred Thirty Seven Lakh and Thirty Six Thousand Only].
i)While computing the annual turn over, other income shall not be considered.
ii) |
In case where audited |
results |
for the last preceding financial year are |
not available, certification of financial |
statements from a practicing |
Chartered |
Accountant shall be considered acceptable. |
|
|
2.The bidder shall have to submit the following documents in support of meeting the QR along with their bid:
2.1The bidder to submit documentary evidence in support of Clause 1.0 of QR.
2.2Copies of audited balance sheet and profit & loss account for the preceding three (3) financial years in support of Clause 1.1 of QR.
8.0Issuance of Bidding Documents to any bidder shall not construe that bidder is considered qualified.
9.0NTPC reserves the right to reject any or all bids or cancel/withdraw the NIT for the subject package without
assigning any reason whatsoever and in such case no bidder/intending bidder shall have |
any claim arising out of such |
|
action. |
|
|
10.0 |
Address for Communication |
|
AGM |
(CS), |
|
Contract Services, |
|
|
2nd floor, Vikas Bhawan, |
|
|
PO- Vikas Bhawan (Jamnipali), Distt. Korba, |
|
|
Fax. 07759- 237199, phone # |
|
|
email: bcsahoo02@ntpc.co.in |
|
|
Websites: https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart or www.ntpctender.com |
or www.ntpc.co.in |
|