(A Joint Venture of NTPC & SAIL)
CORPORA TE CONTRACTS & MATERIALS, NEW DEL HI
(I nternation al Competitive Bidd ing)
DETAILED INVITATI ON FOR BI DS
IFB N o.: CC/C& |
Date of Issue: 20. 10.2014 |
R&M WOR K OF DISTRIBUTED CONTROL SYSTEM FOR
DURGAPU R CAPTIV E POWER
LOCATE D IN DISTRICT BURDWAN, ST ATE OF W EST BENG AL, INDI A
1.0NSPCL invi tes
2.0BRIEF SC OPE OF WORK
The R&M scope of wo rk for the equipment, material and system shall includ e design,
engineerin g,
Replacement of existi ng control system wit h DCS package is intended to procurement of the equipment and systems fo r control, p rotection, operation and monitoring of the total plant, except a fe w areas al ong with other
The control system, called D istributed Control system (DC S) is en visaged to consist of the following
1.Station C&I c onsisting of following as minimum
a.Modulating control for Steam- enerator ( SG)
b.Modulating control for various Cycles
c.Binary control of the auxiliaries for
d.Binary c ontrol of th e auxiliaries for
2.SG C&I consisting of fo llowing as minimu m
a.Burner M anagement System (B MS)
b.Boiler Protection
3.TG C&I consisting of fo llowing as minimu m
a.Interface with EHTC and TSI sy tem.
b.Turbine Protection
Its Human Machine Interface ( HMI) |
is to |
be based |
on Large Video |
Scr een |
(LVS) |
displays su pported by TFT monitor |
base d |
Operator |
Work Stations |
(OWS). |
These |
devices through customized user
are used for giving fast
The sequence of events recording & alarm annunciation are also implemented as a part of DCS system. A GPS based master and slave clock system is envisaged for uniform and synchronized timing signals throughout the entire station.
The power supply for each of the above control systems is to be based on 24V DC provided through microprocessor based modular system and for the peripherals and other subsystem through 230V Single Phase UPS along with battery backup for Main plant.
Field instruments like temperature elements, Temperature Transmitter, Pressure Transmitters, DP transmitters, Level Transmitters along with their process connection & piping as well as measurement systems etc are also procured through this package.
Apart from above, Operator control desks, panels, shielded twisted pair instrumentation cables, control and power cables, optical fiber cables, field erection material viz. conduits, trays etc. are also included in this package.
Connectivity with existing numerical relays installed at switchgear.
Dismantling existing DCDB and supply, installing of new DCDB (220VDC control supply)
In addition, dismantling of existing equipment and panels, as identified and as required, is also included in the package.
Detailed scope of work has been specified in the bidding documents.
3.0NSPCL intends to finance the subject Package through External Borrowings/Own Resources.
4.0Detailed specification, scope of work and terms & conditions are given in the bidding documents, which are available for examination at the address given below till the last date for requesting the bidding documents indicated herein. The salient details and schedule for the bidding is as under:
Issuance of IFB |
20.10.2014 |
|
Document Download / Sale Commencement Date & Time |
10:00:00 on 20.10.2014 |
|
Document Download / Sale Close Date & Time |
17:00:00 on 17.11.2014 |
|
Last Date & Time for Receipt of Queries from Bidders (if |
17:00:00 on 27.11.2014 |
|
any) |
||
|
||
Last Date and Time for |
14:30:00 on 17.12.2014 |
|
submission |
||
|
||
15:00:00 on 17.12.2014 |
||
|
INR 7875/- (Rupees Seven |
|
|
Thousand Eight Hundred |
|
Cost of Bidding Documents |
Seventy Five only) for Indian |
|
Bidders and US $ 175/- (US |
||
|
||
|
Dollars One Hundred Seventy |
|
|
Five only) for Foreign Bidders. |
Date for opening of Price Bid (Stage – II) shall be intimated separately after opening of
5.0A complete set of Bidding Documents is to be downloaded from NSPCL’s
5.1Only the downloaded documents are to be used for bidding purposes. Bids shall be submitted online on our website and opened at the address given below in the presence of Bidder's representatives who choose to attend.
5.2All bids must be accompanied by Bid Security for an amount of INR 51,21,000
(Rupees Fifty One Lac and Twenty One Thousand only or USD 83,400 (US Dollar Eighty Three Thousand Four Hundred only) in the form as stipulated in the Bidding Documents.
ANY BID FOR WHICH ACCEPTABLE BID SECURITY AND COST OF BIDDING DOCUMENTS IN A SEALED ENVELOPE IS NOT RECEIVED PHYSICALLY AT THE ADDRESS INDICATED BELOW SHALL BE REJECTED BY THE EMPLOYER AS BEING
5.3The Bidder may examine the bidding documents and may request for any modification or clarification or suggestions or deviation to the bidding documents prior to the specified last date for clarifications. The bidders are required to send his request to NSPCL by post or by email at the address indicated below for any modification or clarification or suggestions before the specified last date for the same.
5.4Subsequent to last date for receipt of clarifications, NSPCL shall internally review the clarifications/ suggestions/deviations of the bidders and transmit the response (without identifying the source of query) to all prospective Bidders who have received the bidding documents. The response shall be sent through amendments/ clarifications to the bidding documents through email. While making his
5.5In case any modification (s) or clarification (s) or suggestion (s) of the bidders is / are not accepted in the said amendments/ clarifications made to the bidding documents; the bidders shall suitably take in to account the implication of such modification or clarification or suggestions by the bidder into their bid prices, if any, and submit their bid without any further modification or clarification or suggestions or deviation.
6.0Qualifying Requirements for Bidders (QR):
1.0In addition to the satisfactory fulfillment of the requirements stipulated under section ITB (Instructions to Bidder), the following shall also apply:
2.0
The Bidder should have
a)Engineered, Manufactured, Supplied, Erected / Supervised Erection & Commissioned / Supervised Commissioning of Distributed Digital Control, Monitoring & Information System (DDCMIS) / Distributed Control System (DCS), which should have been in successful operation in at least one (1) unit of coal fired station having unit rating of 60 MW or above for a period of not less one (1) year prior to the date of
b)Executed an order / orders of DDCMIS / DCS whose control system is either same or of the same series as being offered for this package & which should have been in successful operation in at least one (1) unit of coal fired station having unit rating of 60 MW or above for a period of not less than one (1) year prior to the date of
c)The control system of both (a) and (b) above should necessarily include as a minimum,
1. Station C&I consisting of following as minimum
a.Modulating control for
b.Modulating control for Feed water / Condensate Cycle.
c.Binary control of the auxiliaries for
d.Binary control of the auxiliaries for
AND
2.
a.Burner Management System (BMS).
b.Boiler Protection.
AND
3.
a.Interface with Turbine Governing system.
b.Turbine Protection
It is not essential that all the three
3.0
The Bidder, who meets the requirements at 2.0 (a) with 2.0 (c) 1 only may also participate provided it associates with a DDCMIS / DCS manufacturer, who meets the requirements of 2.0 (a), (b) & (c) (1,2,3) above, only for engineered, supplied and commissioned the respective DDCMIS / DCS. In such a case, the Bidder should furnish along with its
4.0Financial Criteria of Bidder:
4.0(a) The average annual turnover of the Bidder, in the preceding three (3) financial years as on the date of
4.0(b) The Net Worth of the Bidder as on the last day of the preceding financial year should not be less than 25% of its
4.0(c) In case the Bidder is not able to furnish its audited financial statements on standalone entity basis, the unaudited unconsolidated financial statements of the Bidder can be considered acceptable provided the Bidder further furnishes the following documents for substantiation of its qualification:
i.Copies of the unaudited unconsolidated financial statements of the Bidder along with copies of the audited consolidated financial statements of its Holding Company.
ii.A Certificate from the CEO / CFO of the Holding Company, as per the format enclosed with the bidding documents, stating that the unaudited unconsolidated financial statements form part of the consolidated financial statements of the Holding Company.
In case where audited results for the preceding financial year are not available, certification of financial statements from a practicing Chartered Accountant shall also be considered acceptable.
4.0(d) In case a Bidder does not satisfy the financial criteria, stipulated at Cl. 4.0(a) and / or Cl.4.0 (b) above on its own, its Holding Company would be required to meet the stipulated turnover requirements at Cl. 4.0 (a) above, provided that the net worth of such Holding Company as on the last day of the preceding financial year is at least equal to or more than the
irrevocable financial support for the execution of the Contract by the Bidder in case of award.
4.0(e) The unutilized line of credit for fund based and
4.0(f) Where another Company of the group acting as the Treasury Centre is responsible for Treasury Management of the Bidder having combined credit / guarantee limit for the whole group, the Bidder would be required to provide a Banker’s certificate regarding the unutilized line of credit for fund based and
4.0(g) In case the Bidder’s unutilized line of credit for fund based and
5.0Financial Criteria of Collaborator/ Associate
5.0(a) For Bidder seeking qualification through clause 3.0 above, the average annual turnover of its Collaborator / Associate (meeting requirement of clause 2.0 above) in the preceding three (3) financial years as on the date of Techno- Commercial bid opening, should not be less than INR 104 Million (Indian Rupees One hundred four million only) or in equivalent foreign currency.
5.0(b) The Net Worth of the Collaborator / Associate as on the last day of the preceding financial year should not be less than 25% of its
5.0(c) In case the Collaborator / Associate is not able to furnish its audited financial statements on standalone entity basis, the unaudited unconsolidated financial statements of the Collaborator/ Associate can be considered acceptable provided the Collaborator / Associate further furnishes the following documents for substantiation of its qualification:
(i)Copies of the unaudited unconsolidated financial statements of the Collaborator / Associate along with copies of the audited consolidated financial statements of the Holding Company of Collaborator / Associate.
(ii)A Certificate from the CEO/CFO of the Holding Company, as per the format enclosed in the bidding documents, stating that the unaudited
unconsolidated financial statements form part of the consolidated financial statements of the Holding Company of Collaborator / Associate.
In cases where audited results for the preceding financial year are not available, certification of financial statements from a practicing Chartered Accountant shall also be considered acceptable.
5.0(d) In case a Collaborator / Associate does not satisfy the financial criteria, stipulated at Cl. 5.0(a) and/ or Cl.5.0 (b) above on its own, its Holding Company would be required to meet the stipulated turnover requirements at Cl. 5.0 (a) above, provided that the net worth of such Holding Company as on the last day of the preceding financial year is at least equal to or more than the
5.0(e) For Bidder seeking qualification through clause no 3.0 above, the
5.0(f) Where another Company of the group acting as the Treasury Centre is responsible for Treasury Management of the Collaborator / Associate having combined credit / guarantee limit for the whole group, the Collaborator / Associate would be required to provide a Banker’s certificate regarding the unutilized line of credit for fund based and
5.0(g) In case the Collaborator’s / Associate’s unutilized line of credit for fund based and
Notes for clause 4.0 and 5.0:
a)Net Worth means the sum total of the paid up share capital and free reserves. Free reserves means all reserves credited out of the profits and share premium account but does not include reserves credited out of the revaluation of the assets, write back of depreciation provision and amalgamation. Further any debit balance of Profit and Loss account and miscellaneous expenses to the extent not adjusted or written off, if any, shall be reduced from Reserves & Surplus.
b)Other income shall not be considered for arriving at annual turnover.
c)For unutilized line of credit for fund based and
6.0Notwithstanding anything stated above, the Employer reserves the right to assess the capabilities and capacity of the Bidder / his Collaborators / Associates / Subsidiaries / Group companies to perform the Contract, should the circumstances warrant such assessment in the overall interest of the Employer.
7.0NSPCL reserves the right to reject any or all bids or cancel/withdraw the Invitation for Bids without assigning any reason whatsoever and in such case no bidder / intending bidder shall have any claim arising out of such action.
8.0Issuance / Downloading of Bid Documents by any Bidder or payment / acceptance of tender documents cost shall not construe that such Bidder is considered to be qualified.
9.0Bids shall be submitted online and opened at the address given below in the presence of Bidder's representatives who choose to attend the bid opening. Bidder shall furnish Bid security, Power of attorney, Integrity Pact, Acceptance of important Terms & Conditions, Deed of Joint Undertaking & Certificate for Compliance of QR (as applicable) in physical form offline as detailed in Bidding Documents before the stipulated Bid Submission Closing Date and Time of Techno- Commercial Bid at the address indicated below.
10.0Transfer of bidding documents purchased by one intending bidder to another is not permissible.
11.0ADDRESS FOR COMMUNICATION:
AGM(C&M) / DGM(C&M)
15, Bhikaji Cama Place, New
Phone:
Website: www.tenderwizard.com/NSPCL