NTPC Limited
(A Government of India Enterprise)
Feroz Gandhi Unchahar Thermal
NOTICE INVITING TENDER (NIT)
FOR
Supply, Installation, Testing and Commissioning of Grid Interactive Roof Top Solar Photovoltaic System (GISPVS) of Cumulative
(Domestic Competitive Bidding)
NIT No: 40026129 |
Date:23.09.2014 |
Bidding Document No: |
034/2073 |
1.0 NTPC invites
2.0 |
Brief Details |
|
|
NIT No. |
40026129 |
|
|
NIT Date |
23.09.2014 |
|
|
Document Sale Commencement Date & Time |
23.09.2014 |
10:00:00 |
|
Document Sale Close Date & Time |
15.10.2014 17:30:00 |
||
Source of IFB/NIT |
Feroz Gandhi Unchahar Thermal |
||
Contract Classification |
Supply + |
Erection+ Civil |
|
Last Date and Time for Bid submission |
31.10.2014 13:00:00 |
||
Technical Opening Date & Time |
31.10.2014 15:00:00 |
||
Bid Opening Date & Time |
31.10.2014 15:00:00 |
||
Cost of Bidding Documents in INR |
2,600.00 |
|
|
EMD in INR |
336000.00 |
|
|
|
|
||
Last |
Query Date (if any) |
|
|
3.0Bid Security and Integrity Pact (if applicable) shall be submitted in a sealed envelope separately offline by the
stipulated bid |
submission closing |
date and time at the address given below. Any bid without an acceptable Bid Security |
and Integrity |
Pact (if applicable) |
shall be treated as |
4.0 A complete set of Bidding Documents may be downloaded by any interested Bidder on payment
(https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart). For logging on to the SRM Site, the |
bidder would require |
||
vendor code and SRM user id and password which can be obtained |
by submitting a questionnaire |
available at our SRM |
|
site as well as at NTPC tender site (www.ntpctender.com). First time users not |
allotted any vendor code are required to |
||
approach NTPC at least three working days prior to Document Sale |
Close date |
alongwith duly filled in questionnare for |
|
issue of vendor code and SRM user id/password. |
|
|
|
5.0Brief Scope of Work & other specific detail
GRID INTERACTIVE ROOF TOP SOLAR PV PLANT OF COMMULATIVE
SCOPE OF WORK |
|
Scope of work include, but not limited to- Design, engineering, |
getting approvals for subsidy from MNRE/ Govt. |
authorities, quality surveillance, arranging testing at manufacturer's |
works, packing, supply, Loading, unloading, storage, |
installation at site, testing & commissioning of Grid Interactive |
Solar Photovoltaic System (GISPVS) of cumulative |
tools & tackles, display boards etc., at the roof top |
area of Administrative
basis. The Guarantee/ Warrantee of the |
entire system for 5 years after successful commissioning shall also be included in |
the scope of agency. |
|
TERMS & CONDITIONS:- |
1.- GRID CONNECTED SYSTEM:-
without battery storage. Surplus energy, |
if any, |
will be exported to |
the 415 V grid and shortfall, if any, is imported |
from the grid. |
|
|
|
with detail technical specification, quality plan, drawings etc. along with name |
|||
of manufacturer duly approved by NTPC |
prior to |
place the order for |
procurement. |
essentially required for the smooth completion of |
work, shall be |
treated as covered under |
the scope |
for which no |
any |
|
extra amount shall be paid. |
|
|
|
|
|
|
of each |
item shall be |
prepared and put up for |
approval in |
consultation |
with |
|
quality checks |
of the materials/ systems |
& testing shall be carried out |
||||
as per specifications/ approved quality plan |
at the |
works of the manufacturer/ bidder before |
dispatch of materials to site. |
|||
BANK |
Contract Price (Both |
Portions- |
SUPPLY & |
||
ERECTION), shall be |
submitted by the Agency, and the validity of the same shall be initially kept up to 90 days beyond |
||||
the date of warranty |
period and to be submitted along |
with acceptance |
of Award by the Agency. In view of this, no |
||
other Security deposit |
shall be deducted from the Bills of |
the Agency on |
account of performance |
guarantee. |
|
7.- GUARANTEE:- The successful Bidder shall guarantee the material and workmanship of all components of the
equipments and shall meet the requirement of the specifications for the period |
of |
5 years. Should |
the performance test |
||||||||
result at works deviate from the guaranteed values |
including the |
specified |
tolerance |
the |
bidder shall |
correct |
his |
equipment |
|||
at no extra cost to the Purchaser and repeat |
the performance tests within a |
reasonable |
period |
as agreed to by the |
|||||||
Purchaser. As regard to the component clause if the Bidder fails to meet the guaranteed values |
subject to |
tolerance |
|||||||||
specified, the Purchaser will levy a penalty @Rs.One (1) Lacs per KWp. |
|
|
|
|
|
|
|
|
|||
8.- WARRANTY:- The warranty period for |
the |
equipments |
of SPV |
plant |
shall |
be 5 |
Years |
after |
the |
successful |
|
commissioning of the SPV plant as per minimal technical requirements/ standards for SPV systems/ plants under the program of MINISTRY OF NEW AND RENEWABLE ENERGY. If any Manufacturing/ Installation defect of any equipment of the system and overall workmanship of the SPV power plant is revealed within 5 years of date of
commissioning, is |
to |
be attended/ rectified/ replaced |
immediately after receipt of complaint to avoid any generation loss, |
and nothing shall |
be |
paid extra for that defect (i.e. |
free of cost). |
orders |
or within the |
extended time period if any, as Liquidated Damages |
and not as penalty, a sum calculated at the rate |
||
of one |
percent |
(1%) |
of the contract price per week or |
part thereof delay, subject to maximum five percent (5%) of the |
|
total Contract |
price |
(Supply+ Erection) included in the |
scope of contract |
and same shall be deducted from the payments |
|
due under either from Supply Contract or from Erection Contract or from both and/ or by invoking the Contract Performance Guarantee and/or any other means as deemed fit by the owner.
11.- TERMS OF PAYMENT:- Payable in INR Currency:-
(i).- Initial Advance= 10% of price component- Against Advance BG, initially valid up to (90) Ninety days beyond the
adjustment of Advance payment against the said BG; |
|
|
|
|
|
|
||
from |
manufacturer's works |
on |
production of invoices and satisfactory |
|||||
evidence of shipment (which shall be 3 of 3 |
original Bill) |
including Material |
Dispatch |
Clearance |
Certificate (MDCC) |
|||
issued by |
the NTPC Representative. |
|
|
|
|
|
|
|
= 30% |
and |
physical |
verification by |
the |
EIC/ his |
authorized |
representative. |
|
completion of each year of successful guarantee |
since the commissioning of the system for the warrantee period |
of 5 |
|
years. |
|
|
|
GENERAL REQUIREMENT (Common for the Package):- |
|
|
|
visit the site prior to quoting the tender documents to ascertain the |
|||
quantum of work involved for completion of the system. |
|
|
|
PV Plant on the roof top of new |
& old administrative buildings |
shall |
|
be decided by NTPC based on the availability of space as well as load requirement. |
|
|
|
or full shall not be permissible by |
NTPC. |
|
|
start declared by |
EIC. |
|
|
|
|
|
|
|
|
Bidder shall offer their rates inclusive of all |
taxes |
and duties |
at the |
prevailing |
applicable rates. |
||||
The bidder |
is to |
quote |
the rates |
(considering the subsidy amount, if |
any, |
shall be |
directly |
payable |
to the successful |
bidder) for |
Supply |
and Installation/ |
services portion separately in the price schedule. |
|
|
|
|||
certificate regarding the package for the purpose of |
subsidy. All approvals, if any, |
from |
MNRE/ |
State/ Central Govt. |
shall be obtained by the Bidder. Approval of Project |
from MNRE/ Govt. Authorities |
and |
Release |
of subsidy amount as |
per MNRE Guidelines, at the earliest is the responsibility of the Bidder. |
|
|
|
|
|
||||
Insurances, fire |
fighting etc.), is in the |
scope of Bidder itself. The Contractor shall provide suitable quantity & type of |
Fire extinguisher |
in accordance with BIS |
codes for warehouses, office, temporary structures etc. for safety against fire. |
11.- TEST CERTIFICATES:- The components of the systems viz PV modules, PCU/MPPT/INVERTERS, Meters etc. should have tested prior to dispatch. The test certificates should be from national/ internationally accredited labs, as per MNRE guide lines.
under |
the |
contract. |
|
|
|
13.- |
CAUTION SIGNS AND DANGER BOARDS:- The |
standard/ non- corrosive caution label |
and danger boards |
or |
|
labels |
as |
per Indian Electricity Rules, shall be provided as |
and where necessary as per IE Act/ I |
E rules as amended |
up |
to date. |
|
|
|
|
|
15.- CLEANLINESS OF THE
and dispose of all waste materials and rubbish etc. and |
carry |
out any |
measures required to comply with health and |
hygiene regulations. The site shall be left clean and tidy to |
the |
satisfaction |
of the Engineer. |
16.- TRAINING:- After commissioning of the plant, the contractor will conduct one
B).- ERECTION PORTION:- TERMS AND CONDITIONS:-
"Installation, Testing and Commissioning of Grid Interactive Solar Photovoltaic System (GISPVS) of cumulative
respect of its labour employed on or connected with the contract. |
All the registrations and statutory inspection fees, if |
any, in respect of his work pursuant to this Contract shall be in the |
account of the Contractor. |
comprehensive insurance policy shall be arranged by the agency etc. till the completion of |
the |
project. |
of cost, and from that terminal |
||
point- lying of pipelines up to roof top for both the buildings shall be carried out by |
the |
bidder for installation/ civil |
work,. |
|
|
7.- ELECTRICAL SAFETY REGULATIONS:- The contractor shall ensure that entire electrical installation work is
executed by adopting statutory safety regulations and best practices in the industry. The Contractor shall employ the |
|
necessary number of qualified, full time electricians to maintain his |
temporary electrical installation. Fuses to be provided |
to protect against short circuit conditions. |
|
fixing of DBs and PCUs and for installation of complete system, |
etc. shall be designed to meet national building code |
requirements and shall be in the scope of bidder.
shall be grouted |
and finished as per |
specifications unless otherwise |
recommended by the equipment manufacturer. Based |
on the site conditions, any other work |
shall also be carried out on |
urgent basis; |
|
consist of Ash bricks laid in the specified mortar |
|||
strictly according |
to drawing and specifications. The Ash Bricks shall be issued by NTPC free of cost for installation. |
||
10.- WORK & SAFETY REGULATION:- Agency should deploy adequate manpower & required T&P to complete the work within stipulated period. HR Clearance, Adequate Safety of all the workmen, materials/equipments, office belonging to him or to Employer or to others, working at site along with safety aspects during construction & erection, removal of
debris/scrap, General Aesthetics & cleanliness, |
maintain work |
discipline, test/ progress reports |
etc. must |
be |
taken |
care |
of |
by the bidder. |
|
|
|
|
|
|
|
11.- PROTECTION OF WORK/ SECURITY |
shall have total responsibility |
for Watch |
& |
Ward |
for |
the |
safe custody of all materials, equipments, works from theft, fire, pilferage and any other damages and loss at site. The
contractor shall have total responsibility for protecting his work till it is finally |
taken over |
by |
the Employer. No claim |
|||
will be entertained by the Employer or the representative of the Employer for |
any damage |
or |
loss |
to the Contractor#s |
||
work and the Contractor shall be responsible for complete restoration of the damaged |
works |
to original |
conditions to |
|||
comply with the specifications and drawings. The contractor shall not cause any delay |
in |
the |
repair of |
such damaged |
||
works because of any delay in resolution of such disputes. |
|
|
|
|
|
|
construction |
equipments, tools, |
|||||
tackles and scaffoldings required for |
|
|
|
|
|
|
employees, |
representatives and |
|||||
workmen at the site. |
|
|
|
|
|
|
14.- CONTRACTORs SITE OFFICE:- The Contractor shall establish a site office and keep posted an authorized representative for the purpose of the contract.
15.- CRATING:- All equipments and materials shall be suitably coated, wrapped, or covered and boxed |
or crated |
for |
|||||
most humid tropical shipment and to prevent damage or deterioration during |
handling |
and |
storage |
at |
site. |
All |
the |
packaging materials (During packed and unpacking condition) are the property |
of NTPC |
and |
to be |
returned |
back |
to |
|
NTPC Store. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(i).- Initial Payment= 10% of the total installation services on establishment |
of site office & Against Advance BG, |
||||||
initially valid up to (90) ninety days beyond the adjustment of Advance payment |
against the said |
BG; |
|
|
|
|
|
(ii).- Progressive Payment= 80% against erection on certification by the EIC & successful completion of quality check points;
i).- Ash Bricks- wherever required for completion of work; ii).- PCs- 2 Nos for Remote monitoring & Data Logging.
6.0 Prospective bidders from U.P. State are compulsorily required to provide TIN number at the time of purchase of
bidding documents. |
|
|
|
|
||||
7.0 Qualifying Requirements for Bidders: |
|
|
||||||
7.0 |
Qualifying |
Requirements: |
|
|
|
|||
a) |
The |
bidder |
|
should have installed and commissioned Solar Photovoltaic Systems of minimum cumulative capacity of |
||||
60kwp (with a system of 20kwp or higher capacity at each location). |
||||||||
b) |
The bidder |
should have executed the work of |
installing |
and commissioning of Solar Photovoltaic System during last |
||||
seven (7) years |
|
ending last day of the month of previous to |
the one in which bids are opened as any of the following :- |
|||||
(i) |
One |
similar |
executed |
work of |
value not less than Rs. 134.50 lacs. |
|||
|
|
|
|
|
|
|
|
OR |
(ii) |
Two |
similar |
executed |
works |
of value not less |
than Rs. |
84.00 lacs each. |
|
|
|
|
|
|
|
|
|
OR |
(iii)Three similar executed works of value not less than Rs. 67.00 lacs each.
The average |
annual |
turnover of the bidder in the three preceding completed financial years, as on the date of bid |
opening shall |
not be |
less than Rs. 336.00 lacs. |
8.0Issuance of Bidding Documents to any bidder shall not construe that bidder is considered qualified.
9.0NTPC reserves the right to reject any or all bids or cancel/withdraw the NIT for the subject package without
assigning any reason whatsoever and in such case no bidder/intending bidder shall have any claim arising out of such action.
10.0 Address for Communication
(1)
L D SINGH
Sr. MANAGER (CS)
MOB
(2)
VIKRAM PANDEY MANAGER (IT)
Websites: https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart or www.ntpctender.com or www.ntpc.co.in