NTPC Limited
(A Government of India Enterprise)
Feroz Gandhi Unchahar Thermal
NOTICE INVITING TENDER (NIT)
FOR
REMOVAL,SUPPLY & ERECTION OF BOILER (210 MW) ROOF SHEETING OF
(Domestic Competitive Bidding)
NIT No: 40026537 |
Date:23.09.2014 |
Bidding Document No: |
050/2013 |
1.0 NTPC invites
2.0 |
Brief Details |
|
NIT No. |
40026537 |
|
NIT Date |
23.09.2014 |
|
Document Sale Commencement Date & Time |
23.09.2014 10:00:00 |
|
Document Sale Close Date & Time |
14.10.2014 17:30:00 |
|
Source of IFB/NIT |
Feroz Gandhi Unchahar Thermal |
|
Contract Classification |
Works Contract |
|
Last Date and Time for Bid submission |
31.10.2014 13:00:00 |
|
Technical Opening Date & Time |
31.10.2014 15:00:00 |
|
Bid Opening Date & Time |
31.10.2014 15:00:00 |
|
Cost of Bidding Documents in INR |
1,100.00 |
|
EMD in INR |
84000.00 |
|
|
||
Last |
Query Date (if any) |
|
3.0Bid Security and Integrity Pact (if applicable) shall be submitted in a sealed envelope separately offline by the
stipulated bid |
submission closing |
date and time at the address given below. Any bid without an acceptable Bid Security |
and Integrity |
Pact (if applicable) |
shall be treated as |
4.0 A complete set of Bidding Documents may be downloaded by any interested Bidder on payment
(https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart). For logging on to the SRM Site, the |
bidder would require |
||
vendor code and SRM user id and password which can be obtained |
by submitting a questionnaire |
available at our SRM |
|
site as well as at NTPC tender site (www.ntpctender.com). First time users not |
allotted any vendor code are required to |
||
approach NTPC at least three working days prior to Document Sale |
Close date |
alongwith duly filled in questionnare for |
|
issue of vendor code and SRM user id/password. |
|
|
|
5.0Brief Scope of Work & other specific detail
SCOPE OF WORK
Description: REMOVAL,SUPPLY & ERECTION OF BOILER (210 MW) ROOF SHEETING OF
(1). SUPPLY OF ROOF SHEETS AS PER MATERIAL SPECIFICATION.
(2). TRANSPORTATION OF SHEET UPTO SITE FROM MANUFACTURER WORKS.STACKING OF SHEET IN PROPER WAY AT SITE.
(3). ERECTION OF SCAFFOLDING AS PER REQUIREMENT AT DIFFERENT ELEVATIONS. AGENCY HAS TO ENSURE BOILER IS TO BE COVERED WITH NYLON SAFETY NET WHEREVER REQUIRED FOR SAFETY.
(4). REMOVAL OF OLD / DAMAGE GI SHEET IN PROPER AND SAFE CONDITION.
(5). FIXING OF NEW SHEET UPTO BOILER (210 MW)
(6). WELDING OF BRACING, SUPPORT WILL BE DONE BY AGENCY AS PER REQUIREMENT.
(7). SHIFITING OF OLD/ DAMAGED GI SHEET FROM SITE TO CENTRAL STORE/SCRAP YARD.
(8). REMOVAL/SHIFTING OF OTHER SCRAPS FROM SITE.
( 9). ALL T CLAMPS,STICHING SCREWS,SEALS,WASHER,FASTENER,FLASHING & CAPPINGS AND ANY OTHER FIXING ARRANGEMENTS REQUIRED SHALL BE IN THE SCOPE OF AGENCY.
Roof Sheeting Material Specification:
SPECIFICATION: Continuously
Nominal thickness (Base Metal Thickness Without
Galvanizing: The base metal shall be galvanized with minimum grade of zinc coating 275 grams / sq.m as per IS:277 Top Side Paint: Top side coating shall be 20 microns minimum of Silicon Modified Polyester (SMP) painting.
Bottom Side paint: Bottom side coating shall be 7 microns minimum of Silicon modified polyester (SMP) painting. Durability of paint coating: As per
The sheet should have
|
However |
the color of sheet shall be decided after placement of purchase order.Agency shall take details from |
EIC with catalouge.After Clearance by EIC material shall be dispatched. |
||
TERMS & CONDITIONS |
||
Desc |
: |
REMOVAL, SUPPLY & ERECTION OF BOILER ROOF SHEETING OF |
(1). Atleast one sufficiently experienced and qualified supervisor should be kept by agency always for this contract exclusively to take instruction from EIC on day to day basis.
(2). Arrangement for lighting at work place is to be made by the contractor. He has to arrange all lighting accessories like 220 bulb, 24V bulb, cables fittings, extension board for 24 V transformers etc. He has to arrange TPN board for welding equipments also.
(3). Contractor shall have no claim for idle time, due to any reason what so ever.
(4). All the required safety procedure is to be followed by contractor, Safety of the people working on the job will be
responsibility of agency. The contractor should have necessary experience to work at |
height. Agency should provide all |
|||
the safety gadgets like safety belts, helmet, safety shoes |
etc. to their workers at their own cost. |
|
|
|
(5). Contractor should have valid labor insurance and license, certificates as per the act. |
|
|
||
(6). Agency should provide all the safety gadget slide safety belts, helmet, safety shoe |
etc. to their |
workers |
at their own |
|
cost. |
|
|
|
|
(7). This is the responsibility of contractor to deploy |
the manpower as per the job |
requirement, |
specially |
working at |
height up to 56 meters. |
|
|
|
|
(8). Welder should be approved by NTPC FQA/EIC. |
|
|
|
|
( 9). All materials e.g. Sheets, accessories, fasteners & clamps, safety nets and any other equipments etc. and scaffolding material required for erection of roof sheeting shall be arranged by the agency at their own cost.
(9). All required manpower for Scaffolding erection shall be arranged by the agency. (10). All the T&P and consumable should be arranged by agency at their own cost.
(11). All necessary arrangement (materials, scaffolding, tools & plants, labors etc.) for working at all levels and heights up to boiler top 56 meters. as required for proper completion of work shall have to be made by the agency at their own cost. Nothing shall be paid extra on these accounts.
(12).Agency shall use proper T clamps and other fitting accessories for boiler roofing and other and other area weather protection sheeting similar to Unit#2.if required agency may see the site. All such accessories e.g. flashing and
capping,working drawings are in scope of agency.
(13). Agency should be manufacturer of this sheet or they have tie up the manufacturer. Agency should submit this detail
with material specification along with offer for approval. All material shall |
be of approved |
quality as |
IS specification and |
the same is required to be got checked and approved from NTPC before start of work. |
|
|
|
(14).The material supply and erection of roof sheeting in boiler will be |
carried out by |
the same |
agency as aforesaid |
Scope of Work. |
|
|
|
(15).Payment of material and services will be released together on basis of area measurement of erected roof sheeting in Boiler accordingly.
(16). Party should get dispatch clearance certificate before dispatch of material i.e. PDI shall be done at agency works. Agency should give PDI call to NTPC well in advance.
(17). Completion period: Total completion period will be ONE year. (18). Defect liability period: 03 Months from work completion date.
6.0 Prospective bidders from U.P. State are compulsorily required to provide TIN number at the time of purchase of bidding documents.
7.0Qualifying Requirements for Bidders:
(a)The bidder should have executed |
the work |
of |
removal |
and/ |
or |
erection |
of boiler |
roof sheeting in |
a |
Thermal |
Power |
||||||||
Plant with a unit capacity of 200 MW or more. |
|
|
|
|
|
|
|
|
|
|
|
|
|||||||
(b)The bidder should have executed |
similar |
[as |
per para |
6(a)] |
during |
the |
last 7( seven) years ending last day of the |
||||||||||||
month of previous to one |
in which |
bids are opened as any of |
the |
|
|
following:- |
|
|
|
|
|||||||||
(i) |
One |
similar executed |
work |
of |
value |
not |
less |
than |
Rs |
33.50 lacs. |
|
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OR |
|
(ii) |
Two similar executed |
works |
of |
value |
not less |
than Rs. |
21.00 |
lacs |
each |
|
|
|
|
||||||
|
|
|
OR |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(iii) |
Three |
similar executed works of value not |
less than |
Rs.16.50 |
lacs |
each. |
|
|
|
|
|||||||||
(c ) The average annual |
turnover |
of the bidder in the |
three |
preceding |
completed |
financial years, |
as |
on the |
date of |
||||||||||
bid |
opening shall not be |
less than |
Rs.41.50 |
lacs. |
|
|
|
|
|
|
|
|
|
|
|||||
8.0Issuance of Bidding Documents to any bidder shall not construe that bidder is considered qualified.
9.0NTPC reserves the right to reject any or all bids or cancel/withdraw the NIT for the subject package without
assigning any reason whatsoever and in such case no bidder/intending bidder shall have |
any claim arising out of such |
action. |
|
10.0 Address for Communication |
|
Manish Kumar Singh |
|
Dy.Manager (Contracts) |
|
NTPC Ltd. Unchahar |
|
Mo No. 8004948373 |
|
Websites: https://etender.ntpclakshya.co.in/sap/bc/gui/sap/its/bbpstart or www.ntpctender.com |
or www.ntpc.co.in |